Question : Polluted River Stretches

(a) whether the Government has received requests from various States/UTs for grant of approval to the projects/
scheme''s pertaining to various sectors viz. water resources, irrigation, desiltation, river cleaning, water
conservation and management, etc. during the current plan period;
(b) if so, the details thereof indicating the name of projects/schemes sanctioned and pending for clearance along
with reasons for pendency and time by which these are likely to be cleared, sector-wise;
(c) the details of ongoing and pending projects/schemes pertaining to each of the said sector along with funds
released/utilized so far and the progress made thereunder, State/UT-wise; and
(d) whether some of the said projects/ schemes have incurred time and cost overruns and if so, the details
thereof, State/ UT-wise and the corrective action taken thereon?

Answer given by the minister

STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (d) OF STARRED QUESTION NO. *113. TO BE
ANSWERED ON 03.03.2016 IN LOK SABHA REGARDING“PENDING AND ONGOING PROJECTS” ASKED
BY SHRI S.P. MUDDAHANUME GOWDA AND SHRI SADASHIVHON’BLE M.P’s, LOK SABHA:
(a) to (c) The projects/scheme''s pertaining to various sectors viz. water resources, irrigation, desiltation, river cleaning,
water conservation and management, etc. during the current plan period are as follows:-
Name of Schemes
Proposals
received
Proposals
accepted
Proposals
pending
Major and Medium irrigation Projects 104 50 54
Repair, Renovation & Restoration of Water
Bodies
1342 1342 0
CADWM 56 45 11
River Cleaning 29 16 13
Surface Minor Schemes 4704 3317 1387
50 project proposals of Major/Medium Irrigation (MMI) and Extension, Renovation and Modernization (ERM) have been
accepted by the Technical Advisory Committee of this Ministry (Annexure-I).The list of pending irrigation projects
under appraisal is at Annexure-IA& IB for new and revisedprojects respectively.
Empowered Committee (EC) of this Ministry has included 1342 water bodies under Repair, Renovation & Restoration of
Water Bodies for restoration of water bodies costing Rs.1013.430crore in 2014-15& 2015-16 and Rs.103.49crore has been
released (Annexure-II).There is no pending proposal under RRR of Water Bodies forconsideration in Empowered
Committee in this Ministry.
16 schemes has been sanctioned during the 2014-15 & 2015-16 (Till 23.07.2015) for river cleaning and 13 schemes have
been appraised and pending for sanction (Annexure-III).
3317 projects Minor Irrigation Schemes have also been included under AIBP and Rs. 238.332crore has been released
(Annexure-IV).The list of pending Surface Minor irrigation schemes is at Annexure-IVA.
45 projects of CADWM have been included under Command Area Development (CADWM) and Water Management
Programme and Rs. 214.06crore has been released (Annexure-V).The list of pending CADWM projects is at Annexure-
VA.
Some of these proposals have been pending due to technical and procedural deficiencies.
(d) Completion of projects may be delayed due to various reasons including land acquisition, Resettlement and
Rehabilitation of the affected population, litigation on the projects in the courts, geological surprises in the foundations,
paucity of funds etc.
Government of India has prioritized 46 ongoing projects under AIBP for their timely completion by removing various
bottlenecks.
*****
Sl.No.
Project Name State
TYPE (Major/
Medium)
Estimated
Cost in Rs
Crore
Benefits in
Ha
1 Andhra Pradesh Irrigation and Livelihood
Improvement Project
Andhra
Pradesh
Major - ERM 1131.136
(Pl 2010-11)
114,878
2 Restoration of Western Gandak Canal System,
(Saran Main Canal &Its Distribution System)
Bihar New - Major -
ERM
2169.51
( PL -2011-
12)
478,000
3 Minimata (Hasdeo) Bango Project Chhattisgarh Major-ERM 492.31
( PL- 2011-
12)
45,116
restoration
4 Medium Irrigation Project to Nadaun Area in Tahsil
- Nadaun, District - Hamirpur
Himachal
Pradesh
Medium -New 97.59(PLJun,
2011)
6,471
5 Mahuar Medium Irrigation Project Madhya
Pradesh
New - Medium 191.2707 (PL-
2009)
13,775
6 Bilgaon Irrigation Project Madhya
Pradesh
New - Medium 182.22 (PL-
2009)
12,285
7 Thoubal Multipurpose Project Manipur Revised -
Major
1387.85 (PL-
2011)
33,387
8 Khuga Multipurpose Project Manipur Revised-
Medium
433.91 (
PL-2011)
14,755
9 Dolaithabi Barrage Project Manipur Revised-
Medium
360.05 (PL-
2011)
7,545
10 Imphal Barrage Project Manipur ERM- Medium 16.8 (PL-
2011)
6,400
11 Sekmal Barrage Project Manipur ERM- Medium 10.2 (PL-
2011)
8,500
12 Revised Estimate of Rehabilitation of 1st Patiala
Feeder & Kotla Branch with 20% enhanced
capacity and changed value of "N"
Punjab Revised- Major 199.39(PL-
2011-12)
334,109
13 Construction of Lining of Tumaria- Bahalla &
Naktiya Feeder
Uttarkhand ERM- Medium 11.2
(PL-2010-11)
7,890
restoaration
2,54 and
Add.creation
10 ha
14 ERM of Malan Canal System Uttarakhand ERM- Medium 11.40
( PL-2010-11)
3984 ha
(Restoration
753 ha
and
Additional
creation 41
ha)
15 Lakhwar Multipurpose project Uttarakhand Multipurpose 3966.51
(PL- 2012)
33,780
16 Delija Dewada Medium Irrigation project Madhya
Pradesh
NEW Medium -
ERM
17.49 (PL
2009)
7200
(Restoration
3600)
17 Anandapur Barrage project (Phase -II ) of Odisha
(Integrated Anandapur Barrage Project)
Orissa Major -Revised 1457.63 (PL
2010-11)
56,720
Sl.No.
Project Name State
TYPE (Major/
Medium)
Estimated
Cost in Rs
Crore
Benefits in
Ha
ANNEXURE - I
LIST OF PROJECTS CONSIDERED AND ACCEPTED BY ADVISORY
COMMITTEE OF MOWR, RD & GR DURING THE CURRENT PLAN PERIOD
(2012-13 TO 2015-16)
Year 2012-13
Annexure-I as referred to in reply to part (a) to (c) of Lok Sabha Starred Question No.113 due
for reply on 03.03.2016 regarding Pending & Ongoing Irrigation Projects
18 Salandi Sanskar Project of Odisha (Integrated
Anandapur Barrage Project).
Orissa Major -Revised 145.77 (PL
2010-11)
Annual
irrigan=7822
ha, Area
protected =
250000 ha &
Population
13,50,000
19 Madhya Ganga Canal project Stage -II Uttar
Pradesh
Major -Revised 2865.11 (PL
2011)
146,532
20 Dhansiri Irrigation Project Assam Major -Revised 567.05
(PL-2011-12)
83366
21 Singda Multipurpose Project Manipur Medium-ERM 34.62
(PL-2011-12)
3000
22 Lift Canal system of Upper Indravati Irrigation
Project
odisha Major - New 986.71
(PL-2012-13)
43047
23 Lower Indra Irrigation Project odisha Major -
Revised
1624.49
(PL-2012-13)
38870
24 Ret Medium Irrigation Project odisha Medium -
Revised
433.39
(PL-2012)
9775
25 Parwan Irrigation cum drinking water supply
scheme
Rajasthan Major - New 2435.93
(PL-2011-12)
99864
26 ERM of Narayanpur Left Bank Canal System,
Karnataka
Karnataka Major-ERM 3752.18
(2012-13)
408703
(Restoration
142580)
27 Upper Tunga Project Karnataka Major-New 2561.88
(2012-13)
94,698
28 Rukura Medium Irrigation Project Odisha Medium-
Revised
256.09
(2013)
5,750
29 Loktak Lift Irrigation Scheme Manipur Major-ERM 25.56
(2011)
24000
(Restoration
12600)
30 Mahi Irrigation Project Madhya
Pradesh
Major- Revised 834.24 (2009) 28,127
31 Karanja Irrigation Project Karnataka Major-Revised 635.18
(2012-13)
29,227
32 Kanupur Irrigation Project Odisha Major-Revised 1801.25
(2013)
47,709
33 Rengali Irrigation Sub Project -Right Bank Canal Odisha Major- Revised 1962.33
(2013)
143,490
34 Subarnarekha Irrigation Project Odisha Major- Revised 5561.57
(2013-14)
187,462
35 Thoubal Multipurpose Project Manipur Major- Revised 1694.27
(2011)
35,160
36 Karnataka Integrated and sustainable Water
Resources Management Investment Program
(KISWRMIP), Tranche-1
Karnataka Medium ERM 118.75 (2012-
13)
7,500
37 Kachhal Irrigation Project Madhya
Pradesh
Revised-
Medium
91.39 (2009) 3,470
38 Telengiri Irrigation Project Odisha Medium-
Revised
613.71 (2013) 13,829
39 Rengali Irrigation sub-project LBC-II (RD 29.177
Km to 141.00 Km)
Odisha Major-Revised 3603.67
(2013)
177651
40 Kanhar Irrigation Project Uttar
Pradesh
Major-Revised 2252.29(2013-
14)
35467
YEAR 2015-16
YEAR 2014-15
YEAR 2013-14
Sl.No.
Project Name State
TYPE (Major/
Medium)
Estimated
Cost in Rs
Crore
Benefits in
Ha
41 Borolia Irrigation Project Assam Medium-
Revised Cost
157.03 13562
42 Modernisation of Tunga Anicut Canal Network Karnataka ERM, Medium 239.75 11732
43 Modernisation of canal system of Bhadra reservoir
Project
Karnataka ERM, Major,
Revised Cost
1175.79 177337
44 Sonthi Lift Irrigation Scheme Karnataka Major 673.9 16800
45 ERM of Rajghat Canal Project Madhya
Pradesh
ERM, Major,
Revised Cost
56.83 164789
46 Dolaithabi Barrage Project Manipur Medium
Irrigation,
Revised
509.70 Cr.
(PL 2013)
7545
47 Formation of Flood Carrier Canal from Kannadian
Channel to drought prone area of Sathankulam,
Thisaiyanvilay by interlinking Tamirabarani,
Karumediyar and Nambiyar Rivers in Tirunelveli
and Thoothukudi Districts, Tamil Nadu
Tamil Nadu Major Irrigation 872.45 Cr.
(PL 2014-15)
23040
48 Revised Cost Estimate of Extension, Renovation
and Modernisation of canals being fed from river
Sutlej
Punjab Major - ERM,
Revised Cost
918.25
(PL 2013-14)
207068
49 Revised Cost Estimate of Relining of Sirhind
Feeder from RD 119700 to 447927, Punjab
Punjab Major - ERM,
Revised Cost
671.478
(PL 2015)
69086
50 Revised Cost Estimate of Relining of Rajasthan
Feeder from RD 179000 to 496000, Punjab
Punjab Major - ERM,
Revised Cost
1305.267
(PL 2015)
98739
Annexure – IA
Annexure-IA as referred to in reply to part (a) to (c) of Lok Sabha Starred Question No.113 due for
reply on 03.03.2016 regarding Pending & Ongoing Irrigation Projects
List of New Major, Medium Irrigation and Multi-purpose Project proposals received from State
Governments during the current plan period (i.e from 2012-13 to 2015-16):
Sl.
No.
Name of Projects Major/
Medium
District Benefited Date of Receipt
ANDHRA PRADESH
1 B.R.R.
Vamsadhara Project,
Phase-II, Stage-II
Major Srikakulam 08/2014
BIHAR
2 Burhi Gandak-None- Baya-
Ganga Link Project.
Major Samastipur,
Begusarai and
Khagaria
01/2014
3 Kosi-Mechi Intra State Link
Project
Major Supaul, Araria,
Kishanganj, Purnia,
and Katihar
07/2014
4 Baksoti Barrage Scheme on
river Sakri
Major Nawada, Sheikhpura 08/2014
CHHATTISGARH
5 Arpa Bhaisajhar Project Major Bilaspur 09/2013
6 Rajiv Samoda Nisda diversion
scheme phase II
Major Raipur 02/2014
7 Tandula Reservoir
Augmentation scheme
Major Durg & Dhamtari 07/2012
HARYANA
8 Mewat Feeder Canal Major Mewat, Gurgaon,
Jhajjar and Rewari
04/2015
9 ERM Surface Irrigation
Schemes in Haryana
Major –
ERM
18 districts of
Haryana
07/2015
JHARKHAND
10. Burhai Reservoir Project Major Deoghar 08/2015
11 Rarhu Reservoir Project Medium Ranchi 08/2015
KARNATAKA
12 Shiggaon Lift Irrigation Scheme Major Haveri 12/ 2013
13 Upper Bhadra Project Major Chikkamagalur,Chitr
adurga,Davangere &
Tumkur
07/2015
MADHYA PRADESH
14 Chinki Multipurpose Project Major Narsinghpur 01/2013
15 Bansujara dam Project Major Tikamgarh/
Chhatarpur
07/2013
16 Mohanpura Major Multipurpose
Project
Major Rajgarh 01/2014
17 Sher-Shakkar-Machhrewa
Complex Project.
Major Narsinghpur 01/ 2014
18 Sanjay Sarovar (Upper
Wainganga) Project
Major-
ERM
Seoni and Balaghat 03/2015
19 Sonpur Medium Sagar 11/2012
20 Panchamnagar Medium Damoh 11/2013
21 Pawai Medium Panna 07/2013
22 Majhgaon Medium Panna 01/2013
23 Tarped Medium Chhatarpur 01/2013
24 Chandrakeshar Medium
(ERM)
Dewas 11/2012
25 Surajpur Medium Irrigation
Project
Medium Sagar 04/2013
26 Saroj Sarovar Medium
ERM
Ratlam 06/2013
27 Chhoti Utawali Medium Burhanpur 04/2012
28. Semri Medium Raisen 11/2013
MAHARASHTRA
29. Sulwade-Jamphal –Kanoli LIS
scheme
Major Dhule 05/2012
30. Lower Tapi Project Major Jalgaon 02/2013
31. Damanganga Pinjal River Link
Project
Drinking
Water
Bombay 01/2015
32. Kanhan
(Kochi Barrage)
Medium Nagpur 07/2012
ODISHA
33 Ong Dam Project Major Bargarh,Bolangir 02/2016
PUNJAB
34 Project of Rehabilitation,
Renovation and Modernisation
of various distributaries
systems along with allied works
in Punjab State (UBDC system)
Major -
ERM
Pathankot,
Gurdaspur, Amritsar,
Tarn Taran
12/2015
RAJASTHAN
35 Kalisindh Major Multipurpose
project (Revised DPR awaited)
Major 08/2015
TAMIL NADU
36. ERM of Grand Anicut Canal
System in Cauvery Basin
Major Thanjavur,
Pudukottai
06/2015
TELANGANA
37 Modernisation Nizamsagar
Project
Major Nizamabad 05/2015
UTTAR PRADESH
38 Badaun Lift Canal Irrigation
Project
Major Badaun, Sambhal 08/2014
39 Bhaunrat Dam Project Medium Lalitpur 10/2014
40 Project for providing irrigation
facilities in 15 villages of Babina
block, Distt.Jhansi
Medium Jhansi 03/2013
WEST BENGAL
41 Dwarkeshwar-Gandheswari
Reservoir Project
Major Bankura 09/2015
Annex – IB
Annexure-IB as referred to in reply to part (a) to (c) of Lok Sabha Starred Question No.113 due for
reply on 03.03.2016 regarding Pending & Ongoing Irrigation Projects
List of Revised Cost Estimate of Major, Medium Irrigation and Multi-purpose Projects received from
State Governments during the current plan period (i.e from 2012-13 to 2015-16):
Sl.
No.
Name of the Project Major/
Medium
Districts
Benefited
Date of Receipt
ANDHRA PRADESH
1 Thotapally Barrage Project Major Srijakulam and
Vizianagaram
03/2015
ASSAM
2 Borolia Irrigation Project
(3rd Revised Cost Estimate)
Medium Baska & Kamrup of
BTAD
07/2014
BIHAR
3 Bateshwarsthan Ganga
Pump Canal Scheme Phase-I
Major Bhagalpur 08/2014
GUJARAT
4 Sardar Sarovar (Narmada)
Project
Major Barmer, Jallore districts
of Rajasthan and
Kachch, Saurashtra
region of Gujarat.
07/2015
JAMMU & KASHMIR
5 Modernisation of Ranbir
Canal Project
Major –
ERM
Jammu 12/2015
KERALA
6 Chitturpuzha Project Major-
ERM
Pallakad 08/2014
MADHYA PRADESH
7 Pench Diversion Project
(Deferred during the 125th
meeting of Advisory Committee)
Major Chhindwara and Seoni 09/2013
8 Lower Goi Project Major Barwani 12/2014
9 Bah Medium Vidisha 06/2014
10 Sagad Medium Vidisha 06/2014
11 Bilgaon Medium Dindori 06/2014
12 Upper Beda Medium Khargaon 06/2014
TELENGANA
13. Indirama Flood Flow Canal
from SRSP
Major Karimnagar, Warangal 03/2015
UTTAR PRADESH
14. Arjun Sahayak Pariyojana
(Deferred during the 127th
meeting of Advisory Committee)
Major Mahoba 08/2014
Sl
No State
No of
water
bodies
Estimate
d cost
(crore)
Potential
(ha)
Cost
/hec
(lakh)
Central
Share 2014-15 2015-16 Balance
CA
1 Meghalaya 9 11.43 1096 1.04 11.43 2.52 0 8.91
2 Odisha 760 361.52 46110 0.78 361.52 52.9 54.746 253.874
3 Uttarakhand 3 3.915 146.2 3.24 3.5235 0 0 3.5235
2 8.575 239.8 3.576 7.7175 0 0 7.7175
4 Uttar Pradesh 8 37.08 1096 3.31 37.08 0 15.361 21.719
sonebhadra 54 33.906 6556 0.517 33.906 0 0 33.906
5 Manipur 4 65.442 1046.5 5.96 65.442 10.37 0 55.072
6 Madhya Pradesh 134 198.308 35916 0.552 93.01 37.7 0 55.31
7 Tamil Nadu 0
49 27.379 945 2.89 24.6411 0 0 24.6411
56 27.304 1513 1.804 24.5736 0 0 24.5736
49 23.426 1348 1.74 21.08 0 0 21.08
8 Rajasthan 32 89.688 7731 1.16 89.688 0 35.925 53.763
9 Telengana 182 125.454 6220 2.007 125.454 0 0 125.454
Total 1342 1013.43 109964 103.49 106.032
Details of Project approved by Empowered Committee during XII Plan for inclusion under RRR
Schemes and fund released during 2014-15 & 2015-16
Release status
Annexure-II
Annexure-II as referred to in reply to part (a) to (c) of Lok Sabha Starred Question No.113 due for reply on
03.03.2016 regarding Pending & Ongoing Irrigation Projects
Annexure-III
Annexure-IV as referred to in reply to part (a) to (c) ofLokSabha Starred Question No.113 due
for reply on 03.03.2016 regarding Pending & Ongoing Irrigation Projects (Till 23.07.2015)
S. No. Scheme Name Sector
1 Sewage Works in AnupShahar, Bulandsahar, UP
Municipal Waste Water
(MWW)
2 Sewerage works in sewerage District B, Allahabad, UP
MWW
3 STP at Beur , Patna, Bihar MWW
4 STP at KarmaliChak, Patna, Bihar
MWW
5 Sewerage works in Beur, Patna, Bihar
MWW
6 Sewerage works at KarmaliChak, Patna, Bihar
MWW
7
Sewerage Integration and Sewage Treatment Plant, Budge-
Budge, West Bengal
MWW
8
Sewerage Integration Work and Sewage Treatment Plant,
Barackpore, West Bengal
MWW
9
Sewage Treatment Plant for Saidpur District Patna- Bihar MWW
10
Sewerage Scheme For Saidpur District – Patna Bihar MWW
11
Assessment of Fish and fisheries of the Ganga river system
for developing suitable conservation and restoration plan
Bio Diversity
12
Assesment of water qiulity and sediment analysis to
understand the special properties of river Ganga
Water Quality Monitoring
13
A Programme to Conserve Ganga River Dolphin
(PlatanistaGangetica) in Ganga and its tributaries in Uttar
Pradesh
Bio Diversity
14
National Dolphin Survey 2014-Outline Work Plan for Bihar Bio Diversity
15
Revival activities for Ghariyal and Turtle Breeding
Programmes and for strengthening the protection
mechanism of the biodiversity of Ganga
Bio Diversity
16
DPR preparation for forestry interventions in Ganga Afforestation
The list of appraised projects pending for approval is given below
Sl Project Name Sector Reasons for pending
1 Restoration and Reconstruction works of
Sewerage Scheme due to disaster in Gangotri
Town – Uttarakhand
MWW
2 Restoration and Reconstruction works of
Sewerage Scheme due to disaster in Uttarkashi
Town– Uttarakhand
MWW
3 Repairing and Restoration of Sewerage Scheme,
I & D and STP works & their Preventive / Safety
works due to disaster in Devprayag Town –
Uttarakhand
MWW
4 Sewerage Works in Sewerage District - I of
Kanpur, Uttar Pradesh
MWW
5 National Dolphin Survey 2014-Outline Work Plan
for Bihar
Biodiversity
6 Conservation of Biodiversity Programme in
VikramshilaGangetic Dolphin Sanctuary
Biodiversity
7 Water Quality Monitoring and Performance
Evaluation of Sewage Treatment Plants along
the River Ganga and its tributaries
Water Quality
Monitoring
8 Additional 40 mld STP at Jagjeetpur, Haridwar,
Uttarakhand
MWW
9 Development of Chandighat at Haridwar River Front
Development
10 Sewerage treatment plat for Assi – Bhu
sewerage district at Ramana, Varanasi, Uttar
Pradesh
MWW
11 A Programme to Conserve Ganga River Dolphin
(PlatanistaGangetica) in Ganga and its
tributaries in West Bengal
Biodiversity
12 Rehabilitation &upgradation of existing Kondli
Phase I (45 mld), phase II (114 mld) and phase
III (45 mld) STPs in Delhi
MWW
13 Rehabilitation & upgradation of existing 182
mldRithala STP in Delhi
MWW
Year of
inclusion
Estimated
Cost
Central
Share as per
earlier
funding
pattern
Amount
released
till 2013-
14
Amount
released
during
2014-15
Amount
released
during
2015-16
Amount needed
to completed the
work. (for CA)
ARUNACHAL PRADESH
1 93 FY 13-14 77.495 69.745 40.300 14.723 14.7225 0.000
2 130 0.000 0.0000
ASSAM
GENERAL AREA
1 124 FY 2009-10 715.137 643.624 360.601 91.633 191.390
2 104 FY 2009-10 370.906 333.815 228.584 54.500 50.731
3 36 FY 2012-13 364.160 327.744 22.740 0.000 38.25 266.754
KAAC
1 50 FY 2013-14 202.791 182.512 163.800 9.356 9.356
2 60 FY 2013-14 436.245 392.620 83.454 83.454 70.74 154.975
3 64 FY 2014-15 471.458 424.312 0.000 90.000 334.312
BTC
1 208 FY 2009-10 462.752 416.477 385.965 30.512
2 152 FY 2012-13 360.470 324.423 182.547 18.1403 123.735
3 15 FY 2012-13 198.507 178.656 22.500 0.000 12.28 143.873
4 60 FY 2013-14 615.375 553.838 22.500 0.000 531.338
N C HILLS
1 30 FY 2012-13 130.980 117.882 21.035 47.832 49.016
2 8 FY 2013-14 9.098 8.188 2.552 0.000 5.637
BIHAR
1 129 FY 2012-13 210.332 189.298 38.070 70.864 80.364
CHHATTISGARH
1 147 FY 2013-14 722.1700 649.953 167.601 0.000 482.352
HIMACHAL PRADESH
1 39 FY 2013-14 73.736 66.362 5.400 27.000 33.962
JAMMU & KASHMIR
SRINAGAR REGION
1 58 FY 2009-10 273.136 245.822 117.668 0.000 36.28 91.873
2 117 FY 2011-12 586.730 528.057 18.390 0.000 25.72 483.947
1 65
JHARKHAND
2 171 FY 11-12 187.568 168.811 121.500 15.604 31.707
3 82 FY 14-15 86.584 64.937 0.000 19.379 45.558
KARNATAKA
1 75
MADHYA PRADESH
5 8 FY 2014-15 116.672 87.504 0.000 37.500 50.004
MANIPUR
1 102 FY 2013-14 170.370 153.333 22.320 0.000 40.00 91.013
NAGALAND
1 155 FY 2012-13 112.021 100.819 50.410 25.950 24.4597 0.000
2 159 FY 2013-14 109.603 98.643 0.000 24.661 6.9210 67.061
SIKKIM
1 225 FY 2010-11 57.918 52.126 47.789 0.000 4.337
UTTRAKHAND
1 651 FY 2013-14 541.409 487.268 94.019 96.203 48.110 248.937
JAMMU REGION
Annexure-IV
Annexure-V as referred to in reply to part (a) to (c) of Lok Sabha Starred Question No.113 due for reply on 03.03.2016 reg. Pending & Ongoing Irrigation Projects
Details of MI Schemes
Sl. No. Name of
State/ Project
Amount (Rs. in crore)

Annexure-V
S. No.
Project Name/State Districts benefitted
Year of
Inclusion
CCA
(th.ha)
Centyral assistance
Released during XII
Plan (Rs. Crore)
1 2 3 4 5 6
ARUNACHAL PRADESH
1 Cluster of MI schemes Eastern Zone Uapper Subansiri, Upper Dibang valley, Upper Dabang
Valley, Tirap, Longding, Changlang 2015-16 3.84 0.0
2 Cluster of MI schemes Western Zone Tawang, Wset Kameng, East Kameng, Papun Pare, Lower
Subansiri, East Siang, Kuring Kumey 2015-16 2.22 0.0
TOTAL 6.06 0.00
ASSAM
1 Maloibari LIS Project Kamrup 2014-15 1.50 1.79
2 Dhansiri Udalguri 2014-15 41.68 9.73
TOTAL 43.18 11.52
BIHAR
1 Durgawati Kuaimue, Rohtas 2015-16 32.47 4.90
TOTAL 32.47 4.90
JAMMU & KASHMIR
1 Vaishow Command Project Pulwama, Ahopian and Kulgam 2015-16 11.55 0.00
2 Uri-Narvaw Project Baramulla (MoU not signed) 2015-16 3.79 0.00
3 Ramban Cluster Ramban 2015-16 2.69 0.00
4 Rajouri Cluster Rajouri 2015-16 4.23 0.00
5 Kistwar Cluster Kistwar 2015-16 4.91 0.00
6 Pargwal canal Jammu 2015-16 2.86 0.00
7 Udhampur Cluster Udhampur 2015-16 6.96 0.00
TOTAL 36.99 0.00
JHARKHAND
1 Kanchi Weir Scheme Ranchi, Saraikile 2015-16 17.80 0.00
2 Mayurakshi Left Bank Canal System Dumka, Rameshwar 2015-16 9.50 0.00
TOTAL 27.30 0.00
MADHYA PRADESH
1 Bansagar Project (Balance CCA 124.329) Rewa, Satna, Sidhi and Shahdol 2014-15 154.69 33.42
2 Pench Diversion CAD Project Chhindwara, Seoni 2014-15 70.92 2.65
3 Thanwar irrigation CAD Project Mandla 2014-15 11.11 3.40
4 Sagar Medium irrigation CAD Project Vidisha 2014-15 9.48 0.75
5 Bilgaon Medium irrigation CAD Project Dindori 2014-15 9.26 1.29
6 Mahuar Medium irrigation CAD Project Shivpuri 2014-15 9.50 1.99
7 Sanjay Sagar (Bah) Vidisha 2014-15 9.89 2.69
8 Sindh Phase II Shivpuri,Gwalior,Datia, Bhind 2014-15 98.25 8.57
9 Bagharru Vidisha 2014-15 2.25 1.42
10 Mahan Sidhi 2014-15 16.15 2.69
11 Kachhal Shajapur 2014-15 3.47 2.31
12 Rehti Vidisha, Sagar 2014-15 2.19 0.62
13 Singhpur Barrage Chhatarpur 2014-15 6.00 1.86
14 Indira Sagar Khandwa, Khargone and Barwani 2015-16 88.00 0.00
15 Omkareshwar Canal Khandwa, Khargone and Dhar 2015-16 146.80 0.00
TOTAL 637.95 63.68
MANIPUR
1 Cluster of 125 MI Lilong, Thoubal, Kackching, Phungyar, Chingai, Ukhrul,
Kamsong, Chakpikarong, Chandel & Tengoupal 2015-16 8.23 3.04
2 Cluster of 169 MI Bishnupur,Tamenglong,Senapati 2015-16 8.90 3.11
3 Cluster of 213 MI Imphal East and Imphal west,churachandpur 2015-16 9.64 3.15
4 Dolaithabi Barrage Project Imphal East and Senapati 2015-16 5.50 0.00
5 Thoubal Multi-purpose Project, Ph-III Thoubal,Imphal East and Senapati 2015-16 16.54 0.00
TOTAL 48.81 9.30
PUNJAB
1 Kotla Branch, part- II Bhathinda, Mansa, Sangrur & Barnala 2014-15 266.339 69.85
TOTAL 266.339 69.85
RAJASTHAN
1 Bhakra Canal Project Phase- I Hanumangarh & Sriganganagar 2015-16 113.42 15.54
2 Gang Canal Project,Phase- II Sriganganagar 2015-16 44.88 10.00
TOTAL 158.30 25.54
TAMIL NADU
1 Kudhiraiyar Reservoir Project Dindigul, Tiruppur 2014-15 2.47 1.93
2 Kelavarapalli Reservoir Project Krishnagiri 2014-15 3.03 3.22
3 Kalingalar Nichabanadhi Irrigation Project Tirunevalle 2014-15 6.46 4.37
4 Manimuktha Nathi System Cuddalore, Villupuram 2015-16 16.13 6.41
5 Kalingarayan Anicut Erode 2015-16 4.80 1.37
6 Ellis Anicut Project Cuddalore, Villupuram 2015-16 5.23 2.86
7 Cheyyar Anicut Tiruvannamalai and Kanchipuram 2015-16 7.95 4.56
8 Pelanduarai Anicut Cuddalore 2015-16 6.99 4.56
TOTAL 53.06 29.27
45 G.Total= 1310.46 214.06
LIST OF NEW PROJECTS UNDER CADWM PROGRAMME INCLUDED DURING XII PLAN
Annexure-V as referred to in reply to part (a) to (c) of Lok Sabha Starred Question No.113 due for reply on 03.03.2016 regarding Pending & Ongoing Irrigation
Projects
S. No. Project Name/State CCA (th.ha) Estimated Cost (Rs. cr.)
1 2 4 5
1 Pahumara 8.259 30.65
2 Champamati 6.587 27.23
HIMACHAL PRADESH
1 Shah Nahar 15.287 109.56
2 Sidhata 3.150 21.33
MADHYA PRADESH
1 Mahi 28.127 128.73
PUNJAB
1 Kandi Canal 19.867 73.45
2 Bist Doab 28.041 551.87
3 Sidhwan Branch 116.661 544.14
RAJASTHAN
1 Development of
pressure irrigation in 6
LIS of IGNP 94.081 464.59
2 Gang Canal
Project,Phase- I 118.252 386.68
ODISHA
1 Lower Indra 29.900 103.08
11 Total 468.212 2441.308