THE MINISTER OF STATE (I/C) FOR NEW & RENEWABLE ENERGY, POWER and MoS for SKILL DEVELOPMENT AND ENTREPRENEURSHIP
(SHRI R.K. SINGH)
(a) to (d) A Statement is laid on the Table of the House.
*****
STATEMENT
Statement referred to in Reply to parts (a) to (d) of Lok Sabha
Starred Question No. 362 to be answered on 19 March 2020 regarding
GROWTH AND INVESTMENT IN CLEAN ENERGY SECTOR
The requisite information in reply to the Question, part-wise, is as under:
(a) to (d)
As part of Intended Nationally Determined Contributions, as per the Paris Climate Agreement, India has undertaken to install about 40 percent cumulative electric power installed capacity from non-fossil fuel-based energy resources by 2030.
During last 6 years, the cumulative clean energy installed capacity in the country has grown by about 72 percent from 80.8 Gigawatt (GW) to 138.9 GW. The sector-wise capacity addition and growth is as follows:
Sector Installed Capacity (GW) Growth
As on
31.03.2014 As on 29.02.2020
I. Renewable Energy
(Excluding large hydro above 25 MW) 35.5 86.8 144 %
Solar Power 2.6 34.4 1208 %
Wind power 21.0 37.7 79 %
Biomass, Small Hydro & Waste to Energy 11.9 14.7 24 %
II. Large Hydro 40.5 45.4 12 %
III. Nuclear 4.8 6.8 42 %
Total 80.8 138.9 72 %
An additional 62.4 GW clean energy capacity is currently under various stages of implementation and 34.07 GW under various stages of bidding. Globally, India stands 3rd in terms of renewable power, 4th in terms of wind power and 5th in terms of solar power installed capacity.
For the period 2014-2019, clean energy investments in India were about USD 75 billion. Foreign Direct Investment of USD 6.1 billion flowed into the Indian clean energy sector in this period. Most of the clean energy projects, except nuclear power and some large hydro, are set up in the country by the private sector.
In order to accelerate development and deployment of clean energy in the country, the Government of India has undertaken several financial, policy and regulatory measures. These include:-
(i) notification of Renewable Purchase Obligations up to the year 2021-22;
(ii) notification of guidelines for procurement of solar and wind power through tariff based competitive bidding process;
(iii) waiver of the Inter State Transmission System charges and losses for inter-state sale of solar and wind power applicable to the projects to be commissioned by 31 December 2022.
(iv) creation of Payment Security Mechanism;
(v) provision for flexibility in generation and scheduling of thermal power stations;
(vi) implementation of Green Energy Corridors for absorbing increasing share of renewable energy;
(vii) establishment of Renewable Energy Management Centres in Renewable Energy resource rich States;
(viii) notification of Hydro Purchase Obligation;
(ix) notification of wind-solar hybrid policy;
(x) notification of policy for Repowering of Wind Power Projects;
(xi) implementation of schemes like Pradhaan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM KUSUM), Solar Roof top Scheme Phase II, Government Producers or CPSU Scheme Phase II, and Ultra Mega Solar Parks Scheme;
(xii) provision for permitting 100 per cent Foreign Direct Investment (FDI) under the automatic route; and
(xiii) notification of standards for deployment of solar photovoltaic system/devices;