(a) whether procurement and installation of 10 Kilo Watt High Power Transmitter with a 300 meter high
steel tower at Barmer, Rajasthan was sanctioned during 1985;
(b) if so, whether transmitter installed in February, 1993 became operative only on 1 KW capacity from
March, 1997;
(c) if so, whether the work for erection of tower awarded to M/s Triveni Structural Limited during
February, 1997 at a total cost of Rs.10.20 crores and scheduled to be completed by March, 1999 not even
commenced;
(d) if so, the reasons therefor;
(e) whether the Government have taken note that 10 KWHPT installed at capital cost of Rs. 5.32 crores is
being operated at one-tenth of its capacity and its coverage is less than half the area than that covered by 10
KWHPT; and
(f) if so, the officials responsible for improper planning for procurement of transmitter and erection of tower
since transmitter`s capacity is neither being utilized optimally nor is the targetted coverage being delivered?