THE MINISTER OF NEW AND RENEWABLE ENERGY (DR. FAROOQ ABDULLAH)
(a)&(b): No, Madam. The Central Government exempts all items of machinery, including prime
movers, instruments, apparatus and appliances, control gear and transmission equipment and
auxiliary equipments and components required for the initial setting up of a solar power
generation project or facility, when imported into India, from so much of the duty of customs
leviable thereon which is specified in the first Schedule to the Custom Tariff Act, 1975 (51
of 1975), as is in excess of 5% ad valorem, subject to production of certificate from Ministry
of New and Renewable Energy to the effect that goods are required for initial setting up of
the project or facility for the generation of power using solar energy. Certain items such as
parts of special bearings, gear box, yaw components, wind turbine controllers, blades for rotor,
raw material for manufacture of blades, permanent magnets for synchronous generators above 500
kW wind electricity generators are also allowed to be imported under concessional custom duty.
(c)&(d): The Government has reduced the excise duty on the light emitting diodes lights
from 8% to 4% in the current financial year.
(e)&(f): During 2008-09, the Ministry introduced generation based incentives for grid
connected solar power projects. Under this scheme 11 project developers have signed power
purchase agreements with the concerned state electricity utilities to set up solar power
projects of 35 MW aggregate capacity. Under the Scheme, the Ministry will provide the GBI
for a period of ten years, if the utility continues to purchase power from the project
developer. The GBI is calculated as a difference of a notional amount of Rs. 15 per kWh for
solar photovoltaic power projects and Rs. 13 per kWh for solar thermal power projects minus
the tariff announced by the appropriate Electricity Regulatory Commission.
Government has recently launched the Jawaharlal Nehru National Solar Mission to develop solar
energy technologies to make solar power competitive to conventional grid power by 2022. The
Mission will be implemented in three phases. Government has approved the target to set up
1,100 MW grid connected solar plants, including 100 MW capacity plants as rooftop and small
solar plants for the first phase of the Mission till March, 2013. The roof top and small
grid connected solar power plants, which are connected to LT/11 KV grid, will also be
supported in the first phase of the Mission. The appropriate State Electricity Regulatory
Commission will fix tariff for purchase of solar power from such solar power plants and the
Ministry will provide a generation based Incentive for power fed to the grid. The quantum of
the GBI will be the difference of the tariff announced by the Central Electricity Regulatory
Commission and the notional tariff of Rs. 5.5 per kWh. The project developer will sign a PPA
with the concerned State utility. The draft guidelines have been discussed with the project
developers and other stakeholders, but not finalized as yet.