MINISTER OF STATE IN THE MINISTRY OF SHIPPING (SHRI SHRIPAD Y. NAIK )
(a) Yes, Sir.
(b) & (c) The major plan schemes completed at Mumbai and Kandla Ports by the end of the year 2001 and expenditure incurred during the 9th Plan Period on each scheme are given below : -
Sl. No. Name of the Scheme Expenditure incurred (Rs. in crores ) Mumbai Port
1. Replacement of Pir Pau Oil Pier 1.58
2. Modernisation of Ship Repair Facilities 8.64
3. Replacement of Submiarine Pipelines connecting 264.00 Marine Oil Terminal at Jawahar Dweep with Main Land.
4. Modernisation of Storage Facilities 4.90
5. Installation of VTMS 5.61
6. Replacement of Grab Dredger `Vikas` 22.07
7 Replacement of Underground Cables 1.87
8. Modernisation of Sub-Stations 10.16
9. 6.6 KV Ring Feeder 3.28
10. Providing 22 KV/6.6 KV Cable Switch Gear and Transformer 5.25
11. Replacement of Entrance Gate at Victoria Dock and Replacement of Machinery and Swing Bridge of P&V Docks 5.82
12. Replacement of two Dock Tugs (Rudra & Rahul) 3.32
13. Replacement of Harbour Tug Atul with 45 T Bollard Pull Tug 13.60
14. Replacement of Harbour Tug Ankush with 45T Bollard Pull Tug 13.60
15. Replacement of Inner Lock Gate at Indira Dock 4.50
16. Modernisation of Storage Facilities (New ) 5.85
17. Revamping of MbPT Railways System 29.19
KANDLA PORT
1. 3rd Oil Jetty 6.75
2. 4th Oil Jetty 17.33
3. 8th Cargo Berth 46.56
4. Procurement of Wharf Cranes ( 4 Nos.) 19.62
5. Providing 66/11 KV Electric Sub-Station 4.17
6. Distribution of Electric Power to Port 4.51 installations through underground Feeders
7 Procurement of 4 Nos. 35 Ton TUG 48.10
8. Additional facilities for handling Crude Oil at Vadinar 17.38
9. Deepening of Channels, Approaches and alongside Berths 48.21
10. Development/Upgradation of open plots 4.96
11. Development of land including roads etc. outside west Gate 6.71