Question : PENDING POWER PROJECTS



(a) the number of centrally sponsored power projects pending in the country along with the reasons therefor, State-wise; and

(b) the details of amount likely to be spent on these projects, State-wise?

Answer given by the minister

THE MINISTER OF STATE IN THE MINISTRY OF POWER ( SHRIMATI JAYAWANTI MEHTA )


(a) & (b) : There is no centrally sponsored scheme of the Ministry of Power at present. However, details of power projects under construction in Central Sector in the country is Annexed.

ANNEXE

ANNEXE REFERRED TO IN REPLY TO PARTS (a) & (b) OF UNSTARRED QUESTION NO. 612 TO BE ANSWERED IN LOK SABHA ON 21.11.2002 REGARDING PENDING POWER PROJECTS.

Power projects under construction in the Central Sector in the Country as on 31st October, 2002.

Sl	Name of	State	Capacity	Est.	Remarks
No.	Projects (MW) cost	(Crs.)
Central Sector Thermal

1. Rihand STPP St- U.P. 1000 4028.03 II NTPC

2. Ramagundem Andhra 500 2128.61 TPP St.-III Pradesh NTPC

3. Talcher STPP Orissa 2000 6854.99 St.-II NTPC

4. Neyveli Tamil 420 1590.58 U-1 syn. On TPS-I NLC Nadu 21.10.02

5. Mejia TPS Extn. W.B. 210 797.82 DVC Hydro 1 Dhauliganga Uttaranchal 280 1578.31

(NHPC) 2 Chamera St. II H.P. 300 1684.02

(NHPC) 3 Dulhasti (NHPC) J&K 390 3559.77 4 Teesta St. V Sikkim 510 2198.04

(NHPC) 5 Loktak D/S Manipur 90 578.62 Works held

(NHPC) up 6 Parbati St. II H.P. 800 3919.59

(NHPC) 7 Indira Sagar M.P. 1000 3527.54 Joint

(NHDC) Venture 8 Nathpa Jhakri H.P. 1500 7666.31 Joint

(NJPC) Venture 9 Tehri St.I Uttaranchal 1000 5690.64 Joint

(THDC) Venture 10 Koteshwar Uttaranchal 400 1301.56 Joint

(THDC) Venture 11 Tuirial Mizoram 60 448.19

(NEEPCO) 12 Kopili St.II Assam 25 99.35

(NEEPCO) 13 Kol Dam (NTPC) H.P. 800 4492.77 Total 11285