THE MINISTER OF STATE IN THE MINISTRY OF SHIPPING, ROAD TRANSPORT AND HIGHWAYS(SHRI K.H. MUNIYAPPA)
(a) Yes, Sir.
(b) The Detailed Project Report (DPR) for repair, improvement and widening including strengthening of shoulder of NH-52 in Assam have been submitted by various wings of BRO. The details are given in Annex.
(c) Does not arise.
(d)The BRO have allocated Rs.53.52 crore for the above work out of their total allocation of Rs.260 crore for North Eastern Region during financial year 2005-06. The allocation for the year 2006-2007 is yet to be finalized.
Annex
ANNEX REFERRED TO IN REPLY TO PART (b) OF LOK SABHA UNSTARRED QUESTION NO. 2675 FOR 10.08.2005 ASKED BY DR. ARUN KUMAR SARMA REGARDING WIDENING OF N.H.-52.
The Detailed Project Report (DPR) for repair, improvement and widening including strengthening of shoulder of Nh-52 in Assam submitted by various wings of BRO are as under:
ANNEX REFERRED TO IN REPLY TO PART (b) OF LOK SABHA UNSTARRED QUESTION NO. 2675 FOR 10.08.2005 ASKED BY DR. ARUN KUMAR SARMA REGARDING WIDENING OF N.H.-52.
The Detailed Project Report (DPR) for repair, improvement and widening including strengthening of shoulder of Nh-52 in Assam submitted by various wings of BRO are as under:
S/No. BRO Project Stretch Name of Project Estimated Current
(A) DPRs cost status (Rs. in crore)
1 Vartak Km 265 to Km 266 Widening to 2 lane 3.98 DPR approved
2 Vartak Km 345 to Km 360 Widening to 2 lane 14.50 DPR under approval
3 Vartak Km 366 to Km 382 Widening to 2 lane 9.38 Modified DPR under submission by BRO to this Ministry
4 Udayk Km 440 to Km 510 Widening to 2 lane 202.14 DPR under modifi cation by BRO
(B) PROPOSALS
1 Vartak Km 331 to Km 440 Strengthening of berms 14.48 Proposal approved Proposal approved
2 Dantak and Km 0 to Km 440 Improvement of Riding - Proposal approved Vartak Quality
*****