MINISTER OF RAILWAYS (SHRI D. V. SADANANDA GOWDA)
(a) to (e): A Statement is laid on the Table of the House.
STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (e) OF STARRED QUESTION NO. 149 BY SHRI SUVENDU ADHIKARI TO BE ANSWERED IN LOK SABHA ON 17.07.2014 REGARDING REPAIR OF RAILWAY BRIDGES
(a) to (e): Yes, Madam. A regular and rigorous system of inspection of railway bridges is followed on Indian Railways under which all the railway bridges are thoroughly inspected every year. Repair/strengthening/rehabilitation/ rebuilding of railway bridges is continuous process and is undertaken whenever so warranted by their physical condition as ascertained during these inspections. If the corrective/remedial measures are expected to take a long duration due to the complexity of the site situation, etc. suitable safety measures like imposing speed restriction and keeping such bridge under close watch are taken till the bridge is repaired/strengthened/rehabilitated/rebuilt. The details in respect of the bridges sanctioned for strengthening /rehabilitation/ rebuilding since 01.04.2011, zone wise and year wise are as under:
Railway 2011-12 2012-13 2013-14 Bridges Funds Bridges Funds Bridges Funds sanction allocat- sanction allocat sanction allocat -ed during ed during -ed during - ed during -ed during - ed during the year the year the year the year the year the year (Rs. in (Rs. in (Rs. in crores) crores) crores) Central 3 12.8 19 10.92 20 9.09 Eastern 12 73.17 68 81.42 33 71.18 East Central 30 71.57 24 43.38 0 61.59 East Coast 94 9.13 47 14.64 8 16.87 Northern 65 11.08 30 17.19 38 34.55 North Central 15 16.62 8 12.22 22 19.65 North Eastern 1 3.83 2 9.49 0 17.13 Northeast 187 11.3 83 18.48 2 11.16 Frontier North Western 86 7.39 3 11.03 27 6.70 Southern 38 9.18 39 17.22 21 25.14 South Central 18 31.14 113 16.98 30 18.39 South Eastern 115 11.32 13 21.81 57 17.47 South East 34 12.01 13 7.95 29 7.24 Central South Western 7 13.34 41 13.25 1 13.36 Western 59 15.84 30 19.99 0 27.68 West Central 75 26.72 58 23.7 29 25.51 Total 839 336.45 591 339.66 317 382.69
During the current year 2014-15, an amount of Rs. 403 crores has been allocated for strengthening /rehabilitation/ rebuilding of railway bridges.
Download PDF Files