THE MINISTER OF NEW AND RENEWABLE ENERGY (DR. FAROOQ ABDULLAH)
(a): A list of grid connected solar power plants set up in the country
and their capacity during the last three years and current year and the
grid solar power plants likely to be set up under the programmes of the
Ministry of New and Renewable Energy (MNRE) is given in Table-I.
(b), (c) &(d): Grid solar power plants are being set up in the country by
the private sector on build, own and operate basis for which the project
developers receive preferential tariff on feeding solar power to the grid.
In addition, they can avail nil custom and excise duty on solar cells and
modules, concessional custom duty on many raw materials and components used
in setting up of solar power plants. In addition, for the grid solar power
plants set up by the utilities/state nodal agencies under a demonstration
programme on tail-end grid solar power, capital subsidy is provided by the
Ministry, as per details given in Table-II.
(e): The Ministry has taken several other steps to increase utilization of
solar energy in the country, which include (i) expanded programmes to encourage
utilization of solar energy systems through subsidy or soft loans, (ii) incentive
to manufacturers, commercial users and power project developers (iii) support for
capacity building, including training; and (iv) for creation of awareness through
print and electronic media.
Table-I
Table-1 referred to in reply to Part (a) of the Lok Sabha Unstarred Question No. 887
for 25.11.2011.
List of Grid connected Solar Power projects set up in the Country and Likely to be set up under MNRE Schemes
State/UT Grid connected solar power projects set up in the country Grids Solar power Projects likely to be Set up under MNRE Schemes. 2008-09 2009-10 2010-11 2011-12 (till 31.10.2011) No MW No MW No MW No MW No MW
Andhra Pradesh 1 2 1 1 14 74.5
Chhattisgarh 1 2 1 2
Delhi 1 0.05 3 2.043 1 0.045 15 0.85
Gujarat 2 6 2 35 1 20
Haryana 1 1 8 7.8
Jharkhand         8 16
Karnataka   2 6 2 6
Madhya Pradesh         3 5.25
Maharashtra     2 4 4 10 4 11
Orissa 3 3 6 10
Punjab 1 1 1 1 9 14.5
Rajasthan 1 5 8 33.5 43 38.5
Tamil Nadu     1 5 2 2 6 10
Uttar Pradesh         6 13
Uttarakhand         3 5
West Bengal   1 1 1 5
5 8.05 11 25.043 23 87.545 130 739.4
Table-II
Table-II referred to in reply to Parts (b),(c)&(d) of the Lok Sabha Unstarred Question No. 887
for 25.11.2011.
Details of Funds Sanctioned, Released and Utilised under Demonstration Programme on Tail-end
Grid connected Solar Power (All figures Rs. in Lakhs)
State/UT FY 2009-10 FY 2010-11 FY 2011-12 (till 31/10/2011)
Amount Amount Amount Amount Amount Amount Amount Amount Amount Sanct Rele Util Sanct Rele Util Sanct Rele Util -ioned -ased -ised -ioned -ased -ised -ioned -ased -ised
Delhi # 96.88 52.03 52.03 324.06 116.84 35.83 393.77 106.45 8.00
Karnataka # 658.12 368.18 368.18 191.22 191.22
 Â
Punjab # 631.10 219.57 153.01 316.87
  Â
Rajasthan # 737.50 185.00
     Â
Total 2123.60 824.78 573.22 324.06 624.93 227.05 393.77 106.45 8.00
# Projects are under implementation and likely to be completed by March, 2012.
No funds were released in 2008-09