THE MINISTER OF THE STATE IN THE MINISTRY OF POWER (SHRI P.M. SAYEED)
(a):Details of the investment made by National Hydroelectric Power Corporation Limited (NHPC) during the
Ninth Five Year Plan, viz. 1997-98 to 2001-02, are given in the Annexure.
(b):Yes, Sir.
(c):The Tenth Five Year Plan (2002-03 to 2006-07) capacity addition target set for NHPC, including Joint Venture,
is 4357 MW. Project-wise details are given below:
SL.NO. NAME OF THE PROJECT INSTALLED STATE CAPACITY (MW)
1 Chamera-II # 300 Himachal Pradesh
2 Dulhasti 390 Jammu & Kashmir
3 Dhauliganga-I 280 Uttaranchal
4 TEESTA-V 510 Sikkim
5 SEWA-II 120 Jammu & Kashmir
6 TEESTA LOW DAM ST-III 132 West Bengal
7 TEESTA LOW DAM ST-IV 168 West Bengal
8 BAV-II 37 Maharashtra
9 INDIRA SAGAR 1000 Madhya Pradesh (JV)
10 PURULIA PUMPED STORAGE 900 West Bengal (JV)
11 OMKARESHWAR 520 Madhya Pradesh (JV)
Total 4357
# = Commissioned ahead of schedule