Question : RAIL OVER BRIDGES AT TIRUPPUR



(a) whether the Railways propose to construct rail over bridges at First and Second Railway gates at Tiruppur Railway Station, Chikkana college, Koolipalayam Railway gate and Vanjipalayam Railway gate; and

(b) if so, the details thereof and the action taken by the Railways in this regard?

Answer given by the minister


MINISTER OF STATE IN THE MINISTRY OF RAILWAYS(SHRI K.H. MUNIYAPPA)

(a) & (b): Construction of Road Over Bridge at first Railway gate at Tirupur Railway Station:

The proposal for construction of Road Over Bridge is in lieu of LC 133 at km. 441/10-12 between Uthukuli-Thirupur stations in Erode-Coimbatore-Podanur section of Salem division. The work has already been sanctioned and included in 2007-08 Railways Works Programme.Presently, the work is in planning stage.

Construction of Road Over Bridge at second Railway gate at Tirupur Railway Station:

The request for construction of Road Over Bridge is in lieu of LC 132 (SRC Mill Gate @ km.440/26-28) between Uthukuli-Thirupur stations on Erode-Coimbatore-Podanur section of Salem division . The work has already been sanctioned and included in 2007-08 Railways Works Programme. The General Arrangement drawing has been sent to State Government for concurrence.

Near Chikanna College:

The proposal for construction of ROB at Rly.Km.445/19-21 between Tiruppur and Vanjipalayam Railway Stations (Chikkanna College) has already been sanctioned on Deposit Terms. The General Arrangement Drawing has been sent to Chief Engineer/Highways for concurrence.

Near Koolipalayam Railway gate:

The proposal for construction of Road Over Bridge is in lieu of LC 131@ km. 438/4-6 between Uthukuli-Thirupur stations. The traffic density at this level crossing (LC) is 100464 train vehicle units. State Govt. has not sponsored proposal for replacement of LC by ROB on cost sharing basis. List of eligible LCs has been sent to them which also includes LC No. 131.

Near Vanjipalayam Railway gate:

The proposal for construction of Road Over Bridge is in lieu of LC 134 @ km.441/10-12 between Uthukuli-Thirupur stations. The work has already been sanctioned and included in 2007-08 Railways Works Programme. The General Arrangement drawing has been sent to State Government for concurrence.