(a) whether a huge quantity of redundant/scrap track materials, released on account of gauge conversions on Indian Railways` are either reported to be missing from the site, or not available at the site during inspection by the senior officers;
(b) if so, the details of such track materials found to be missing and the approximate value of the losses, detected by the Railways, section-wise;
(c) the number of such cases, where the Railways have sought permission for waiving of losses to exchequer on account of missing track materials, classified as redundant/scrap alongwith reasons therefor; and
(d) the action proposed to be taken by the Government against Officers held responsible for such losses?