THE MINISTER OF STATE IN THE MINISTRY OF POWER( SHRIMATI JAYAWANTI MEHTA )
(a) to (c): One each of the three units of 25 MW each of Doyang Hydro-electric
Project executed by North Eastern Electric Power Corporation (NEEPCO) in Nagaland
at an estimated cost of Rs. 758.70 crores, were commissioned on 29th June, 5th July
and 8th July, 2000 respectively. With the commissioning of the project, the aggregate
installed capacity of power projects of NEEPCO was raised to 700 MW. The power
generated from the project is allocated to all the seven States in the North Eastern
Region as indicated below:
Assam - 37.3%
Manipur - 6.7%
Meghalaya - 6.7%
Nagaland - 17.3% (including 12% free power)
Tripura - 6.7%
Arunachal Pradesh - 6.7%
Mizoram - 4.0%
Unallocated - 14.6%
100%
(d): The cost of energy generation (excluding Return on Equity and cost of 12
percent free power to the home state) works out to Rs. 3.64 paise per unit.
Information on cost of production from other projects commissioned by CPSUs/SEBs
in the same time frame is being collected and will be laid on the Table of the House.