Question : INLAND WATER TRANSPORT SYSTEM



(a) whether the Government has any proposal to introduce inland water transport system in all cities that have some rivers with the potential of navigation capacity running through them particularly in Southern region;

(b) if so, the details thereof;

(c) whether the Union Government has received any proposals from State Governments for financial assistance for the development of different waterways in their respective States;

(d) if so, the details thereof, State-wise;

(e) the total financial assistance provided to each State for this purpose during the last three years;

(f) whether the Government plans to offer inland water transport as an economical transport service to the people; and
(g) if so, the time by which such transportation system is likely to be introduced?

Answer given by the minister


MINISTER OF SHIPPING (SHRI SHATRUGHAN SINHA)


(a) to (g)A Statement is laid on the Table of the House. STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (g) OF STARRED QUESTION NO. 221 TO BE ANSWERED ON 17TH DECEMBER, 2003 ASKED BY DR. M.P. JAISWAL, SHRIMATI RAJKUMARI RATNA SINGH REGARDING INLAND WATER TRANSPORT SYSTEM.


(a) No, Sir.

(b) Does Not arise

(c) Yes, Sir.

(d) The State-wise details are as under:-

Name of State	Proposal Name	Project Cost(Rs. In lakhs)	Current Status 

1. ASSAM i) Vessel repairing yard at Pandu. 650.00 Not covered under Centrally Sponsored Scheme. State Government informed. ii) Computerisation of Directorate of 20.00 -do- Inland Water Transport iii) Installation of radio communication 24.00 -do- network for Inland Vessels iv) Upgradation of Crew Training Centre 300.00 -do- of Directorate of Inland Water Transport v) Development of infrastructure through 364.71 -do- renovation of Cargo Vessels. vi) Improvement of Ferry Services on the 1268.66 Lacked adequate details. Clarifications River Brahmaputra, Barak and its sought from State Government. tributaries. vii) Terminal facilities at north bank of 301.53 -do- river Brahmaputra. viii) Terminal facilities at south bank of river 670.79 -do- Brahmaputra including procurement of one mini dredger.

2. BIHAR i) Collection of basic data and preparation of 2100.00 -do- a blue print and a data warehouse for various aspects on inland water transport growth in Bihar. ii) Carrying out Hydro morphological study and 30.00 -do- preparation of detailed project report for comprehensive development of inland water transport in river Gandak. iii) Carrying out Hydro morphological study and 30.00 -do- preparation of detailed project report for comprehensive development of inland water transport in river Kosi. iv) Carrying out Hydro morphological study and 30.00 -do- preparation of detailed project report for comprehensive development of inland water transport in river Sone. v) Procurement of one survey and dredging unit 700.00 State Government has been informed that dredging for dredging and maintenance of navigable unit could be considered after detailed project channel in river Gandak. report. Response awaited. vi) Procurement of one survey and dredging unit 700.00 -do- for dredging and maintenance of navigable channel in river Kosi. vii) Procurement of one survey and dredging unit 700.00 -do- for dredging and maintenance of navigable channel in river Sone viii) Preparation of detailed project report for 20.00 Not covered under Centrally sponsored Scheme. construction/provision of facility for repair State Government informed. and maintenance of IWT vessels/containers. ix) Scheme for preparation of detailed project 25.00 Lacked adequate details. Clarifications sought report for river front development at Patna from State Government. aimed at IWT based tourism. x) Collection of data of cargo and passenger 50.00 -do- movement and preparation of techno-economic feasibility report for mechanisation of country boats. xi) Development of navigational channel in Patna 2871.00 -do- area for ferry service for cargo/ passenger.


3. GOA i) Capital Dredging in River Zuari 205.00 -do- ii) Hydrographic survey in the Inland Waterways of Goa. 157.80 -do- iii) Improvement to the existing navigational aid 34.39 -do- within Panaji port limit. iv) Dredging of Shallow patch at the mouth of 90.00 -do- river Chapora


4. KARNATAKA i) Navigational facilities between Kodibag to 728.00 Revised proposal from State Government awaited. Kadra along the Kali river, Karwar Taluk, Uttara Kannada District. ii) Navigational facilities from riverine Port 1223.00 -do- Gangolli in Pancha Gangavali River of Kundapur Taluk, Udupi District. iii) Navigational facilities between Mangalore 677.00 -do- (old riverine Port) to the other places, situated on the banks of the rivers Gurpur and Netravathi in Mangalore Taluk, Dakshina Kannada District. iv) Navigational facilities in the backwater of 1175.00 -do- Almati dam across Krishna River in Bagalkot District. v) Navigational facilities between Anandagiri to 291.00 -do- Biramballi in Backwater Reservoir of Kabini River in Mysore District. vi) Navigational facilities between Malpe Port to 714.00 -do- the other palces situated on the Bank of river Udyavar in Udupi Taluk. vii) Navigational facilities between Honnavar to 1056.00 -do- Gerusoppa along the Sharavathi River, Honnavar Taluk, Uttara Kannada District.


5. KERALA i) Project proposal for development of waterway 1500.00 Lacked adequate details. Clarifications sought from Madakkara fishing harbour to Kabbai in from State Government. Kasargod District.
6. MAHARASHTRA i) Development of Inland Waterways at South Mumbai 1487.00 Under examination. to Amba River /Dharamtar Creek. ii) Development of Inland Waterways in Mhasla/ 1516.00 -do- Manded River (Rajpuri Creek) iii) Development of Inland Water Transport Across 6700.00 Lacked adequate details. Clarifications sought Mumbai Harbour (Ferrywharf to Nerul & Vice from State Government. versa ). iv) Development of Amenties jetties at Elephenta, 800.00 -do- Konkan Coast and Creeks along Konkan Coast. v) Development of Inland Water Transport for 500.00 -do- Eco-tourism project along Koyna backwater in Western Maharashtra. vi) Development of Inland Water Transport for 500.00 -do- Eco-Tourism project along Arunavati river at Taluka Digras, District Yawatmal. vii) Development of Inland Water Transport for 500.00 -do- Eco-Tourism project at Isapur, District Manded. viii) Development of Inland Water Transport in 417.00 -do- Godavari river near Vishnupuri project, Manded.


7 ORISSA i) Development of IWT sector in the state of 204.40 Orissa - upgradation of existing facilities. ii) Prepration of Detailed Project Report on 10.30 -do- Waterways development


8. TAMIL NADU i) Proposal for improving river Cooum from sea 420.00 mouth to Periyar bridge


9.UTTAR PRADHESH i) Proposal for preparation of Detailed Project 10.00 In –principle approval given. Formal approval will Report for introduction of IWT on river Gomti be considered after receipt of additional information sought from State Government.
ii) Proposal for development of inland navigation 2773.00 Lacked adequate details. Clarifications sought from State Government. facilities on river Gomti from Gaughat to Gomti barrage.
10.WEST BENGAL i) Project proposal for construction of gangway 2261.50 Under examination. pontoon type floating jetties (53 nos.) and RCC slipway type jetty (4 nos.) between Tribeni and Farakka ii) Project proposal for construction of five nos. 300.00 State Government advised to passenger cum cargo jetties with terminal and prepare the Detailed Project Report. infrastructural facilities at Dakshineshwar, Sheorafuli, Manirampur, Santoshpur and Nandigram iii) Project proposal for construction of 27 nos. 784.93 Lacked adequate details. Clarifications sought from State Government. RCC jetties and 21 nos Brick Blcok jetties on waterways in Sundarban region. iv) Project Proposal for Vehicular Transhipment 313.00 -do- between Rasulpur and Khejuri on the banks of river Rasulpur. v) Survey /studies of Inland Water Transport and 99.21 -do- related aspects in West Bengal


(e) During the last three years (2000-01, 2001-02 and 2002-03) the financial assistance provided to the states under the old centrally sponsored scheme is as under: Goa - Rs. 17.58 lakhs Kerala - Rs. 273.00 lakhs West Bengal - Rs. 297.16 lakhs

(f)&(g) Yes, Sir. Government is committed to the development of inland water transport as an efficient and economical mode of transport. With this objective in view, river Ganga from Haldia to Allahabad, river Brahmaputra from Dhubri to Sadiya and West Coast Canal from Kottapuram to Kollam along with Champakara and Udyogmandal canals have been declared as National Waterways, and are being developed for shipping and navigation. Inland Water transportation is being undertaken on certain stretches of the National Waterways.