(a) whether the power generation capacity of the power plants in Northern Gujarat has not been increased during the last two years; and
(b) if so, the reasons therefor?
(a) whether the power generation capacity of the power plants in Northern Gujarat has not been increased during the last two years; and
(b) if so, the reasons therefor?
THE MINISTER OF STATE IN THE MINISTRY OF POWER ( SHRIMATI JAYAWANTI MEHTA )
(a): The Power generation capacity of power plants in
Gujarat has been enhanced by 770 MW during the last two years as
indicated below:
Sl. Name of the State/ Capacity Date of No. Project/ Orgn. (MW) Commissioning Unit No.(b) : Does not arise.
1. Paguthan ST Guj./Guj. 250 13.10.1998 Torrent
2. Wanakbori TPS Guj./GEB 210 31.12.1998 U-7
3. Surat Lignite Guj./GIPCL 125 16.1.2000 TPP U-1 U-2 125 06.11.1999
4. Kadana HEP Guj./GEB 60 27.5.1998 Extn. U-2 Total 770