MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI MANOJ SINHA)
(a) to (e): A Statement is laid on the Table of the House. STATEMENT REFERRED TO IN REPLY OF PARTS (a) TO (e) OF UNSTARRED QUESTION NO. 841 BY SHRI DILEEP SINGH BHURIA, SHRI KESHAV PRASAD MAURYA, SHRI TAMRADHWAJ SAHU, SHRIMATI KIRRON KHER, SHRI KAPIL MORESHWAR PATIL,COL. SONARAM CHOUDHARY, SHRI RAJU SHETTI, SHRI RAMDAS C. TADAS, SHRI C.R. CHAUDHARY, SHRI GANESH SINGH AND SHRI ANOOP MISHRA TO BE ANSWERED IN LOK SABHA ON 27.11.2014 REGARDING ROAD OVER BRIDGES AND UNDER BRIDGES.
(a) & (d): There is no level crossing under construction in any of the State. The State-wise details of Road Over Bridges (ROB) and Road Under Bridges (RUB) sanctioned are as under:
SN State ROB RUB/Subways Total 1 Andhra Pradesh 59 71 130 2 Assam 0 84 84 3 Bihar 74 138 212 4 Chhattisgarh 19 36 55 5 Delhi 2 4 6 6 Goa 5 0 5 7 Gujarat 95 480 575 8 Haryana 55 182 237 9 Jharkhand 36 78 114 10 Karnataka 61 176 237 11 Kerala 64 62 126 12 Madhya Pradesh 61 361 422 13 Maharashtra 46 189 235 14 Orissa 20 69 89 15 Puducherry 6 0 6 16 Punjab 45 92 137 17 Rajasthan 59 1686 1745 18 Tamil Nadu 124 298 422 19 Telangana 26 23 49 20 Uttar Pradesh 241 677 918 21 Uttarakhand 10 1 11 22 West Bengal 108 159 267 Grand Total 1216 4866 6082
(b): ROB in lieu of LCs 76 Spl. near IERT, Allahabad Based on the request of public representatives for provision of ROB in lieu of LC 76 near IERT, Allahabad, joint site feasibility for construction of ROB was carried out in September 2007 by officials of Railway, Nagar Nigam Allahabad & Uttar Pradesh Bridge Corporation. During joint site inspection, it was found that ROB is not feasible at this location due to presence of Government Office and other public utilities like telephone lines, electric line and water supply pipelines. ROB in lieu of LCs 28 Spl. Phulpur Station West Yard Based on the request of public representatives, Railway has approached State Govt. to submit the proposal for the construction of ROB at this location along with the required consents for sharing of cost and closure of LCs.
(c): Proposals for construction of ROB/RUB in lieu of LCs are normally received by zonal railways from State Government and other Statutory Authorities. After completing various formalities with State Government/Statutory Authorities, regarding the consent for sharing of cost and closure of LCs, proposals received for construction of ROBs/RUBs in lieu of LCs are further processed for their inclusion in Railway Works Programme. This is a continuous process.
(e): Due to limited availability of resources (approx. Rs.1100 crore per annum) and huge throwforward of already sanctioned works
(Rs.25000 crores), the works are progressing to the extent possible as per time schedule and funds are allocated to only those projects where State Government has already started the work or likely to start the work of approaches.Download PDF Files