(a) whether the preliminary eilgineering-cum-traffic survey was conducted in a new railway line between Sakleshpur-Kadur Chikmagalur by the Railways;
(b) if so, the results of the survey:
(c) the follow up action taken to construct the said line; and
(d) the fund sanctioned therefor?