(a) & (b): Record of each and every demand for new project is
not maintained. However, some of the proposals received by
the Government for construction of new rail lines, gauge
conversions, doublings and electrification of rail lines in
the last three years in the State of Gujarat is as under:
Sl.No. Proposal Action Taken
NEW LINE
1 Gandhinagar-Adraj Moti Work included in the budget 2000-2001.
2 Veraval-Somnath-Kodinar New line work from Veraval to Somnath has been taken up.
3 Surendranagar-Limbdi- Work on Surendranagar-Limbdi Loliya-Wadgaon-Khambat- has already been taken up. In Kavi-Jambusar-Bharuch view of heavy throwforward of ongoing projects, it has not been found feasible to consider remaining portion of this proposal.
4 Extension of rail line Survey completed and report from Modasa to Titoi is under examination.
5 Kharaghoda-Santalpur Survey is in progress.
6 Dholera Port-Bhavnagar Port Survey is in progress from Bhavnagar to Tarapore via Dholera.
7 Extension upto Hazira A study for this project is Port new line likely to be awarded to M/s. RITES by Gujarat Maritime Board.
8. Bhavnagar-Tarapore Survey is in progress.
GAUGE CONVERSION
1. Bharuch-Dahej It is one of the identified projects under National Rail Vikas Yojana. Further processing of sanction and funding will be done as per extant procedure.
2. Ahmedabad- Work on gauge conversion of Bhavnagar/Palitana Surendernagar-Botad-Dhola-Sihor-Bhavnagar and Sihor- Palitana is already in progress.
3. Surendranagar- Work on Surendranagar- Joravarnagar-Sayla Joravarnagar is in progress. Joravarnagar-Sayla rail line has been dismantled long back.
4. Ahmedabad-Himmatnagar- Survey for gauge conversion Khedbrahma of Ahmedabad-Himmatnagar-Umra (Udaipur City) is in progress.
5. Wansjalia-Jetalsar Gauge conversion of this line has been approved.
DOUBLING
1. Surat-Bhusawal Double BG line already exists on Surat-Udhna and Bhusawal- Jalgaon sections. A survey for doubling of Udhna-Jalgaon section is in progress.
2. Virar-Dahanu Road On this section, the line capacity is being augmented by automatic signaling.
3. Ahmedabad-Mumbai A survey for construction of 3rd line between Virar and Ahmedabad has been completed. In view of saturation on this section, it has been decided to augment the line capacity of the route by adopting automatic signaling. However, in phase-I, the work of 3rd line from Surat to Kosamba has been taken up.
Besides the above, proposals have been received for other projects under plan head New Lines, Gauge Conversion, Doubling and Railway Electrification and in some of the cases, surveys have also been completed. It has not been found feasible to take up the proposed projects in view of heavy throw-forward of ongoing works and constraint of resources. The proposals received are as under:-
NEW LINES
1 Porbandar-Porbandar Port
2 New Hapa-Dahinsara
3 Extension of rail line from Taranga Hill/Khedbrahma to Ambaji and Abu Road
4 Extension of Surendranagar-Pipavav rail line upto Jafrabad
5 Amreli-Liliya Mota
6 Umreth-Vina-Nadiad-Vaso-Dholka-Surendranagar
7 Radhanpur-Harij Chanasma-Mahesana
8 Radhanpur-Sami Shankheshwar- Viramgam
9 Radhanpur-Tharad-Sanchor-Jodhpur
10 Dholavira-Rapar-Tikar-Hadavad-Malvan-Ahemedabad
11. Dholera Port-Surendranagar
GAUGE CONVERSION
1 Bhuj-Nalia
2 Mahesana-Taranga Hill
3 Vadia-Kunkavav
4 Samalaya-Miyagam Karjan
5 Jetalsar-Dhasa
6 Kalol-Kadi-Katosan Road
DOUBLING
1 Viramgam-Okha
RAILWAY ELECTRIFICATION
1 Ahmeadbad-Dwarka-Viramgam-Rajkot-Okha
2 Delhi-Ahmedabad
3 Ahmedabad-Porbandar and Ahmedabad-Gandidham-Kutch
(c) to (e): Details of new and on-going projects alongwith funds allocated, expenditure incurred and target date fixed for completion is given in the Annexure.
Surveys for construction of new rail line from Jaisalmer to Kandla, Kharaghoda-Santalpur,Bhavnagar-Tarapore, gauge conversion of Ahmedabad-Himmatnagar-Umra(Udaipur City), doubling of Delhi-Ahmedabad and doubling and electrification of Udhna-Jalgaon are in progress. These surveys are in various stages of progress and expected to be completed during 2003-04 as per availability of resources.