MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI K.H. MUNIYAPPA)
(a) No, Madam. Road Over Bridge (ROB) is constructed on level crossings
which qualify for provision of ROB as per norms.
(b) A Statement is laid on the Table of the House.
(c) The works of Road Over Bridges on cost sharing are normally executed
jointly by the Road authority and the Railway. Approaches are constructed by
the Road Authority and the Railway portion is executed by Railways. The target
date of completion is dependant on several factors like land acquisition, fund
availability with the state Govt. etc. As per fund availability and progress,
yearly targets for complition of ROBs are fixed.
(d) & (e) Train has a right of way on the Railway track and adequate
precaution is taken to ensure that when a train is expected on the track,
the level crossing is closed for road traffic. However, on multiple lines
section and where train traffic is high instructions exist to open the level
crossing gates regularly to avoid long wait for road traffic even at the cost
of train operation.
STATEMENT REFERRED IN REPLY TO PART (b) OF THE UNSTARRED QUESTION NO. 608
BY SHRI SYED SHAHNAWAZ HUSSAIN TO BE ANSWERED IN LOK SABHA ON 24-11-2011
REGARDING ROB OVER RAILWAY CROSSINGS
(b) Road Over Bridges under Construction:
Sl. No. States Road Over Bridge(ROB)
1 Andhra Pradesh 104
2 Assam 1
3 Bihar 64
4 Chandigarh 1
5 Chhattisgarh 15
6 Delhi 2
7 Gujarat 25
8 Goa 0
9 Haryana 35
10 Himachal Pradesh 0
11 Jammu & Kashmir 1
12 Jharkhand 23
13 Karnataka 54
14 Kerala 49
15 Madhya Pradesh 17
16 Maharashtra 25
17 Odisha 21
18 Puducherry 3
19 Punjab 20
20 Rajasthan 48
21 Tamilnadu 147
22 Uttar Pradesh 138
23 Uttarakhand 1
24 Wst Bengal 60
Total 854