Question : Contamination of Ground Water

(a) whether the Government is aware that ground water in the country including Delhi and Bihar is getting day by day highly contaminated with both bio and chemical pollutants like Fluoride, Nitrate, Arsenic, Lead, Cadmium, Chromium as well as other metals, if so, the details and the present status thereof, State-wise;
(b) the details of steps taken along with the ongoing schemes/projects to tackle the situation and improve/recharge ground water level including the quantum of funds allocated/released/spent for the purpose during the current plan period, State/ year-wise;
(c) whether the Government has issued any advisories to the States against large scale extraction and depletion of ground water, if so, the details thereof; and
(d) whether the Government proposes to depute doctors and scientists to check depletion as well as contamination of ground water in the country including Aurangabad district of Bihar, if so, the details thereof?

Answer given by the minister

THE MINISTER OF STATE FOR WATER RESOURCES, RIVER DEVELOPMENT AND GANGA REJUVENATION

(DR. SANJEEV KUMAR BALYAN)

(a) Ground water quality data generated by Central Ground Water Board (CGWB) during various scientific studies and ground water quality monitoring indicates that ground water in isolated pockets in parts of various States including Delhi and Bihar is contaminated with Fluoride, Nitrate, Arsenic, etc.The number of Blocks in each State, affected with ground water contamination are given at Annexure-I.

According to the Ministry of Drinking Water & Sanitation (MoDWS), as on 1.4.2016, out of 1.42 million habitations in various districts of the country, 71,077 habitations are affected by contaminated ground water.

(b) Steps taken by the Government to tackle the situation of ground water contamination includes.
i. Results of the analysis are shared with concerned State agencies for awareness and intensive monitoring and remediation for drinking water use.
Contd. p/2



//2//
ii.Options such as surface water & ground water based Piped Water Supply Schemes, tapping deeper aquifer and Arsenic Removal Plant (ARP)/ Fluoride Removal Plants have been adopted by various States to deal with the menace of As & F contamination in ground water.
iii.Awareness generation programs in the Country on preventing ground water pollution and avoiding use of contaminated water, rain water harvesting and artificial recharge to ground water, are being carried out.
iv.Ministry of Drinking Water & Sanitation (MoDWS) supplements the efforts of the States by providing them technical and financial support to the schemes being developed for drinking water supply in the State. Under NRDWP Up to 67% fund allocated to the States can be utilized for coverage of water quality affected habitations and for tackling water quality problems in rural areas of the country.
v. CGWB carries out exploratory drilling to delineate contaminant free aquifer zones and successful exploratory wells are handed over to the concerned agencies in the States for utilization by them.
Further, to improve ground water levels by rain water harvesting and artificial recharge to ground water, CGWB has taken up Aquifer Mapping and Management programme during XII Plan, under the scheme of Ground Water Management and Regulation. The Aquifer Mapping is aimed at delineating aquifer disposition and their characterization for preparation of aquifer/area specific ground water management plans, to be implemented in collaboration with the community.

To increase availability of drinking water, the Ministry of Drinking Water & Sanitation has suggested all States to adopt water conservation measures like roof top rainwater harvesting, erecting sustainability structures for water conservation etc. For creating such sustainability structures, 10 % of National Rural Drinking Water Programme (NRDWP) fund is provided to the States. State-wise details of expenditures are given at Annexure II(a) to II(d).

Department of Land Resources is currently implementing 8214 watershed development projects in 28 States (except Goa) covering an area of about 39.07 million ha. under the Watershed Development Component (WDC) of the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) principally for development of rainfed portions of net cultivated area and culturable wastelands. The major activities taken up under the WDC-PMKSY, inter-alia, include ridge area treatment, drainage line afforestation, soil and moisture conservation, rain water harvesting, horticulture, pasture development , creation of livelihoods for asset-less person, etc. State wise details of funds released are in Annexure –III.

Ministry of Urban Development has circulated its Model Building Bye-Laws (2016) to all State Governments which, inter-alia, incorporates provisions for Rain Water Harvesting. Atal Mission for Rejuvenation and Urban Transformation (AMRUT) mandates the States to formulate a policy and action plan for having rain water harvesting structures in all commercial, public buildings and new buildings on plots of 300 sq.m and above.
Contd..p/3

//3//
Under the Mahatma Gandhi National Rural Employment Guarantee Act (MGNREGA), the water conservation and water harvesting structures to augment ground water constitute special focus area on recharging ground water including drinking water sources. State wise details of expenditures on Natural Resources Management under MGNREGA are at Annexure – IV.

(c) Central Ground Water Authority (CGWA) has issued advisory to Chief Secretaries of all States and Administrators of all UTs to take measures to promote/adopt rain water harvesting and artificial recharge to ground water against large scale extraction and depletion of ground water. 30 States/UTs have made rain water harvesting mandatory by enacting laws or by formulating rules & regulations or by including provisions in Building bye-laws or through suitable Government Orders.

(d) CGWB by deputing Scientists of the Board monitors ground water levels four times a year (January, April/May, August and November), to check depletion of ground water and its quality, once every year during pre-monsoon (April/May) through network of ground water observation wells in the Country, including Aurangabad district of Bihar. The data generated is analysed and shared with the respective State Government Departments as well as placed on the website of CGWB.

As per the information received from Public Health & Engineering Department (PHED), State Government of Bihar, the State deputes scientists to check the depletion as well as contamination of ground water in respect of Bihar. PHED also takes up need based services of doctors, as and when required, in the event of ground water contamination .
*****

ANNEXURE - I

Annexure referred in reply to Part (a) of the Lok Sabha Starred Q.No. 2705 dated 01.12.2016 regarding “Contamination of Ground Water”

STATE-WISE DETAILS OF GEOGENIC CONTAMINANTS IN GROUND WATER
Sl. No No. of States No of Blocks affected
Salinity (EC above 3000 micro mhos/ cm) Fluoride
( above 1.5 mg/l) Nitrate
(above 45 mg/l) Arsenic
(above 0.01 mg/l) Iron
(above 1 mg/l )
1 Andhra Pradesh 65 117 162 4 34
2 Telangana 17 215 115 2 38
3 Assam* 0 9 0 19 18
4 Arunachal Pradesh* 0 0 0 0 4
5 Bihar 3 141 26 78 32
6 Chhattisgarh 0 29 33 1 9
7 Delhi 11 10 14 2 0
8 Goa 0 0 0 0 2
9 Gujarat 104 69 143 22 46
10 Haryana 34 91 45 26 45
11 Himachal Pradesh 0 0 8 1 0
12 Jammu & Kashmir 0 2 11 7 22
13 Jharkhand 0 38 16 3 7
14 Karnataka 114 118 160 7 116
15 Kerala 15 10 35 0 74
16 Madhya Pradesh 22 79 260 25 127
17 Maharashtra 25 32 158 0 28
18 Manipur* 0 0 0 2 0
19 Meghalaya* 0 0 0 0 0
20 Nagaland* 0 0 0 0 0
21 Odisha 42 68 38 1 91
22 Punjab 14 43 50 24 43
23 Rajasthan 87 203 123 1 58
24 Tamil Nadu 70 51 154 14 10
25 Tripura* 0 0 0 0 4
26 Uttar Pradesh 35 74 180 121 26
27 Uttarakhand 0 0 9 0 0
28 West Bengal 59 43 7 90 331
29 Andaman & Nicobar 1 0 0 0 6
30 Dadra & Nagar Haveli 0 0 1 0 0
31 Chandigarh 0 0 0 0 0
32 Daman & Diu 2 0 1 1 1
33 Pudducherry# 0 0 2 0 0
34 Lakshadweep^ 0 3 0 0 0
Total 720 1445 1751 451 1172

*District as unit of survey, # Region as unit of survey, ^ Island as unit of survey
Note: Data Source is CGWB survey upto May2015 and reports of State Government




ANNEXURE – II(a)

Annexure referred to in reply to Part (b) of the Lok Sabha Unstarred Q. No. 2705 dated 01.12.2016 regarding “Contamination of Ground Water”

State-wise Total Number Of Recharge Structures under NRDWP
Sanction Year:-2013-2014 State:-All State * All Amount in lakhs
S.No. State Pits And Trenches Check Dams Perco Lation Tanks Point Source Recharging (Conversion Of Defunct Borewells) Dug- Wells/ Injection/ Skimming Wells Ooranies/ Village Ponds/ Traditional Water Bodies Roof Top Recharge Shaft Others* Total Estimated Cost Expenditure

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 ANDAMAN and NICOBAR 0 0 0 0 0 0 0 0 7 7 337.37 0.00
2 ANDHRA PRADESH 0 0 36 0 0 0 0 0 0 36 94.17 28.91
3 ARUNACHAL PRADESH 15 175 0 0 0 0 7 0 2 199 1597.48 921.57
4 ASSAM 0 0 0 0 0 0 1363 0 72 1435 87836.89 845.08
5 BIHAR 1 0 0 194 0 0 0 0 1 196 86313.04 29.60
6 CHATTISGARH 46 199 34 31 1 17 278 1 2304 2910 4349.96 1597.81
7 GUJARAT 338 60 0 0 30 117 106 0 462 1113 14698.42 7414.11
8 HARYANA 0 0 0 0 0 0 1 0 0 1 88.00 0.00
9 HIMACHAL PRADESH 5 50 0 1 4 9 47 0 76 192 1403.72 846.70
10 JAMMU AND KASHMIR 0 85 6 0 2 98 0 0 36 227 5075.25 2589.69
11 JHARKHAND 1443 2 0 1 0 0 165 0 114 1725 2403.39 1999.07
12 KARNATAKA 95 986 96 0 2 25 1 13 138 1343 11373.70 3175.49
13 KERALA 0 2 0 0 0 2 0 0 5 9 1934.29 572.48
14 MADHYA PRADESH 355 784 42 8 279 51 280 210 2372 4171 7273.59 5637.70
15 MAHARASHTRA 3528 309 7 0 236 102 56 326 1688 5926 9173.56 5733.86
16 MANIPUR 2 3 0 0 0 6 25 0 11 47 410.00 254.16
17 MEGHALAYA 0 0 0 0 0 0 0 0 0 0 0.00 0.00
18 MIZORAM 0 0 0 0 0 0 0 0 0 0 0.00 0.00
19 NAGALAND 0 0 0 0 0 0 14 0 19 33 756.00 493.43
20 ODISHA 255 1 0 12 0 0 0 0 3614 3882 3679.93 1515.67
21 PUDUCHERRY 0 0 0 0 0 0 0 0 0 0 0.00 0.00
22 PUNJAB 1 0 0 0 5 1 18 0 50 75 1020.86 265.62
23 RAJASTHAN 1 1 0 0 0 0 110 0 137 249 1016.59 266.54
24 SIKKIM 0 0 0 0 0 0 155 0 8 163 392.19 254.02
25 TAMIL NADU 1 785 35 0 0 0 0 141 219 1040 8051.42 7075.89
26 TELANGANA 0 0 59 3 0 0 0 0 1 63 109.58 41.90
27 TRIPURA 0 0 0 0 0 0 11 0 4 15 30.24 18.87
28 UTTAR PRADESH 0 0 0 0 1 0 0 1 2 3 2.82 1.44
29 UTTARAKHAND 0 0 0 0 0 0 102 0 0 102 423.98 281.12
30 WEST BENGAL 3 0 0 0 43 0 0 0 2 48 226.35 74.75
Total 6089 3442 315 250 603 428 2739 692 11344 25210 250072.79 41935.48

* Others May include Infiltration Rings,Sub-Surface Dykes,Others,Revival of traditional water harvesting structures,Flushing/Hydro-fracturing,Bore blasting and Others,Spring Source Devlopment,Solar Pump/ Dual Pump (Solar)





ANNEXURE – II(b)

Annexure referred to in reply to Part (b) of the Lok Sabha Unstarred Q. No. 2705 dated 01.12.2016 regarding “Contamination of Ground Water”

State-wise Total Number Of Recharge Structures under NRDWP
* All Amount in lakhs
S.No. State Pits And Trenches Check Dams Percolation Tanks Point Source Recharging (Conversion Of Defunct Borewells) Dug- Wells/ Injection/ Skimming Wells Ooranies/ Village Ponds/ Traditional Water Bodies Roof Top Recharge Shaft Others* Total Estimated Cost Expenditure

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 ANDAMAN and NICOBAR 0 0 0 0 0 0 0 0 0 0 0.00 0.00
2 ANDHRA PRADESH 0 0 0 0 0 0 0 0 152 152 6.08 6.08
3 ARUNACHAL PRADESH 11 8 0 0 0 0 1 0 2 22 232.22 51.64
4 ASSAM 0 0 0 0 0 2 8 0 51 61 67.85 0.00
5 BIHAR 348 0 0 0 0 0 217 45 58 623 36660.30 18777.32
6 CHATTISGARH 281 77 34 50 25 5 2312 0 3869 6653 4731.76 681.59
7 GUJARAT 1 6 0 0 30 0 1773 0 45 1855 11320.36 4927.20
8 HARYANA 0 0 0 0 0 0 0 0 0 0 0.00 0.00
9 HIMACHAL PRADESH 1 41 1 0 4 1 21 0 107 176 857.02 288.90
10 JAMMU AND KASHMIR 3 23 1 0 0 38 0 0 9 74 1710.06 426.64
11 JHARKHAND 1457 15 0 5 0 0 43 0 287 1807 1094.20 919.40
12 KARNATAKA 109 865 95 1 158 17 0 0 214 1459 14396.78 4366.20
13 KERALA 0 7 0 0 0 0 0 0 0 7 2097.60 104.71
14 MADHYA PRADESH 136 758 20 54 126 0 203 1101 2860 4157 6253.24 2529.10
15 MAHARASHTRA 720 317 4 0 18 41 25 5058 6986 8111 8223.59 2004.37
16 MANIPUR 1 1 0 0 1 14 68 0 3 88 2472.37 1471.68
17 MEGHALAYA 0 0 0 0 0 0 0 0 0 0 0.00 0.00
18 MIZORAM 0 0 0 0 0 0 11 0 0 11 762.08 15.89
19 NAGALAND 0 0 0 0 0 1 10 0 92 103 994.98 997.98
20 ODISHA 175 10 0 0 0 0 0 2 3411 3596 526.19 312.56
21 PUDUCHERRY 0 0 0 0 0 0 0 0 0 0 0.00 0.00
22 PUNJAB 0 0 0 0 0 18 264 0 148 430 3763.66 1394.39
23 RAJASTHAN 3 2 0 0 0 0 64 0 5 74 2636.45 520.85
24 SIKKIM 0 0 0 0 0 0 0 0 0 0 0.00 0.00
25 TAMIL NADU 20 502 0 0 0 40 0 35 122 684 5635.97 4736.59
26 TELANGANA 0 0 0 51 0 0 0 0 0 51 45.38 40.90
27 TRIPURA 2 1 7 0 1 27 111 1 53 202 1333.60 155.81
28 UTTAR PRADESH 0 308 0 0 0 0 0 0 2 310 16823.29 11759.47
29 UTTARAKHAND 3 46 38 0 7 4 133 0 38 269 1363.28 860.63
30 WEST BENGAL 0 0 82 0 79 0 0 0 4 165 736.09 28.96
Total 3271 2987 282 161 449 208 5264 6242 18518 31140 124744.40 57378.86


• Others May include infiltration Rings, Sub-Surface Dykes, Others , Revival of traditional water harvesting structures, Flushing/ Hydro-fracturing, Bore blasting and others , Spring Source Development, Solar Pump/ Dual pump( solar )



ANNEXURE – II(c)

Annexure referred to in reply to Part (b) of the Lok Sabha Unstarred Q.No. 2705 dated 01.12.2016 regarding “Contamination of Ground Water”

State-wise Total Number Of Recharge Structures under NRDWP * All Amount in lakhs
Sanction Year:-2015-2016 State:-All State
S.No. State Pits And Trenches Check Dams Perco Lation Tanks Point Source Recharging (Conversion Of Defunct Borewells) Dug- Wells/ Injection/ Skimming Wells Ooranies/ Village Ponds/ Traditional Water Bodies Roof Top Recharge Shaft Others* Total Estimated Cost Expenditure

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 ANDAMAN and NICOBAR 0 0 0 0 0 0 0 0 0 0 0.00 0.00
2 ANDHRA PRADESH 56 0 0 0 0 0 0 0 0 56 8.19 8.19
3 ARUNACHAL PRADESH 0 0 0 0 0 0 0 0 0 0 0.00 0.00
4 ASSAM 0 0 0 0 0 13 0 0 0 13 6.11 3.41
5 BIHAR 10 0 0 0 0 0 0 0 0 10 100.00 0.00
6 CHATTISGARH 56 35 3 6 0 1 230 4 3092 3423 2565.73 184.53
7 GUJARAT 63 146 0 0 0 0 1267 8 135 1611 15375.63 3859.67
8 HARYANA 3 0 0 0 0 0 1 0 2 6 236.22 71.53
9 HIMACHAL PRADESH 0 2 8 0 0 1 0 0 5 16 116.90 48.64
10 JAMMU AND KASHMIR 0 3 0 0 0 0 0 0 1 4 95.85 7.85
11 JHARKHAND 403 0 0 0 0 0 0 0 2 405 63.08 2.63
12 KARNATAKA 67 143 56 0 247 9 0 6 330 852 3822.87 121.36
13 KERALA 0 0 0 0 0 0 0 0 0 0 0.00 0.00
14 MADHYA PRADESH 573 22 4 0 0 0 1 943 3331 3931 1241.21 940.46
15 MAHARASHTRA 139 12 0 0 11 13 0 3865 5052 5227 2115.20 1032.79
16 MANIPUR 0 0 0 0 0 19 80 0 2 101 3774.99 5.25
17 MEGHALAYA 0 0 0 0 0 0 0 0 0 0 0.00 0.00
18 MIZORAM 0 0 0 0 0 0 0 0 0 0 0.00 0.00
19 NAGALAND 0 0 0 1 0 0 15 0 77 93 1121.72 339.91
20 ODISHA 299 0 0 0 0 1 0 0 3957 4257 2971.50 2445.47
21 PUDUCHERRY 0 0 0 0 0 0 0 0 0 0 0.00 0.00
22 PUNJAB 1 0 0 0 0 0 68 0 7 76 755.86 199.06
23 RAJASTHAN 3 0 0 0 0 0 14 0 0 17 257.58 84.97
24 SIKKIM 0 0 0 0 0 0 0 0 0 0 0.00 0.00
25 TAMIL NADU 0 0 0 0 0 0 0 0 40 40 396.00 0.00
26 TELANGANA 0 0 0 0 0 0 0 0 0 0 0.00 0.00
27 TRIPURA 0 0 2 0 0 3 32 0 37 74 2651.75 62.18
28 UTTAR PRADESH 1 40 0 0 0 0 0 0 7 48 15910.79 9725.00
29 UTTARAKHAND 0 0 0 0 0 25 0 0 12 37 1321.42 450.75
30 WEST BENGAL 0 0 1 0 0 1 0 0 0 2 199.47 0.00
Total 1674 403 74 7 258 86 1708 4826 16089 20299 55108.07 19593.65

* Others May include Infiltration Rings,Sub-Surface Dykes,Others,Revival of traditional water harvesting structures,Flushing/Hydro-fracturing,Bore blasting and Others,Spring Source Devlopment,Solar Pump/ Dual Pump (Solar)





ANNEXURE – II(d)

Annexure referred in reply to Part (b) of the Lok Sabha Unstarred Q.No. 2705 dated 01.12.2016 regarding “Contamination of Ground Water”

State wise Total Number Of Recharge Structures under NRDWP

Sanction Year:-2016-2017 State:-All State * All Amount in lakhs
S.No. State Pits And Trenches Check Dams Perco Lation Tanks Point Source Recharging (Conversion Of Defunct Borewells) Dug- Wells/ Injection/ Skimming Wells Ooranies/ Village Ponds/ Traditional Water Bodies Roof Top Recharge Shaft Others* Total Estimated Cost Expenditure

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 ANDAMAN and NICOBAR 0 0 0 0 0 0 0 0 0 0 0.00 0.00
2 ANDHRA PRADESH
(Data under reconciliation) 0 0 0 0 0 0 0 0 0 0 0.00 0.00
3 ARUNACHAL PRADESH 0 0 0 0 0 0 0 0 0 0 0.00 0.00
4 ASSAM 0 0 0 0 0 0 0 0 0 0 0.00 0.00
5 BIHAR 2 0 0 0 0 0 0 0 1 3 2526.84 730.00
6 CHATTISGARH 73 3 0 27 0 0 173 22 2059 2335 892.33 80.32
7 GUJARAT 2 0 0 0 0 0 10 0 82 94 434.65 29.30
8 HARYANA 0 0 0 0 0 0 0 0 0 0 0.00 0.00
9 HIMACHAL PRADESH 0 0 0 0 0 0 0 0 0 0 0.00 0.00
10 JAMMU AND KASHMIR 1 3 0 0 0 2 0 0 0 6 83.60 0.00
11 JHARKHAND 0 0 0 0 0 0 0 0 0 0 0.00 0.00
12 KARNATAKA 100 259 10 0 17 1 0 0 338 725 2992.15 8.00
13 KERALA 0 0 0 0 0 0 0 0 0 0 0.00 0.00
14 MADHYA PRADESH 2029 10 0 0 0 0 0 1556 3959 5998 2068.56 575.66
15 MAHARASHTRA 19 1 0 0 5 2 0 7056 8108 8135 3207.59 128.75
16 MANIPUR
(Data under reconciliation) 0 0 0 0 0 0 0 0 0 0 0.00 0.00
17 MEGHALAYA 0 0 0 0 0 0 0 0 0 0 0.00 0.00
18 MIZORAM 0 0 0 0 0 0 0 0 0 0 0.00 0.00
19 NAGALAND 0 0 0 0 0 0 0 0 0 0 0.00 0.00
20 ODISHA 0 0 0 0 0 1 0 0 1114 1115 601.27 461.27
21 PUDUCHERRY 0 0 0 0 0 0 0 0 0 0 0.00 0.00
22 PUNJAB 0 0 0 0 0 0 28 0 12 40 195.33 28.56
23 RAJASTHAN 0 0 0 0 0 0 0 0 0 0 0.00 0.00
24 SIKKIM 0 0 0 0 0 0 0 0 0 0 0.00 0.00
25 TAMIL NADU 0 0 0 0 0 0 0 0 0 0 0.00 0.00
26 TELANGANA
(Data under reconciliation) 0 0 0 0 0 0 0 0 0 0 0.00 0.00
27 TRIPURA 0 0 0 0 0 0 0 0 0 0 0.00 0.00
28 UTTAR PRADESH 0 0 0 0 0 0 0 0 38 38 12945.75 899.95
29 UTTARAKHAND 16 0 0 0 0 0 1 0 0 17 57.89 25.42
30 WEST BENGAL 0 0 0 0 1 0 0 0 0 1 1062.55 0.00
Total 2242 276 10 27 23 6 212 8634 15711 18507 27068.51 2967.23

* Others May include Infiltration Rings,Sub-Surface Dykes,Others,Revival of traditional water harvesting structures,Flushing/Hydro-fracturing,Bore blasting and Others,Spring Source Devlopment,Solar Pump/ Dual Pump (Solar)








ANNEXURE – III
Annexure referred in reply to Part (b) of the Lok Sabha Starred Q.No. 2705 dated 01.12.2016 regarding “Contamination of Ground Water”

State-wise details of Central Share released by Department of Land Resources under Integrated Watershed Management Programme / Watershed Development Component in the last 3 years and the current year

(Amount in Rs. crore)
S.No. State Central Share Released
2013-14@ 2014-15@ 2015-16# 2016-17#
(upto 31-10-2016)
1 Andhra Pradesh 107.67 163.28 86.73 83.09
2 Arunachal Pradesh 110.83 0.00 18.00 23.12
3 Assam 116.60 6.99 45.00 0.00
4 Bihar 15.42 21.47 5.00 19.19
5 Chhattisgarh 26.00 10.00 20.00 34.96
6 Gujarat 60.0 72.34 100.00 57.48
7 Haryana 14.20 26.97 6.91 12.82
8 Himachal Pradesh 46.08 0.00 20.00 35.40
9 Jammu & Kashmir 0.0 51.43 0.00 0.00
10 Jharkhand 29.40 0.00 20.00 0.00
11 Karnataka 586.11 125.43 125.00 69.70
12 Kerala 0.0 15.16 20.00 11.37
13 Madhya Pradesh 135.57 303.98 150.00 89.27
14 Maharashtra 180.35 197.91 250.00 80.34
15 Manipur 30.28 11.10 9.00 0.00
16 Meghalaya 28.06 37.16 18.00 11.56
17 Mizoram 69.18 75.81 8.87 16.06
18 Nagaland 74.67 95.09 27.00 28.20
19 Odisha 136.91 248.79 67.50 63.38
20 Punjab 15.44 0.00 7.95 0.00
21 Rajasthan 0.0 403.08 200.00 199.35
22 Sikkim 0.0 0.00 6.30 0.00
23 Tamil Nadu 168.55 124.02 75.00 0.00
24 Telangana 75.58 124.58 70.00 0.00
25 Tripura 47.81 19.04 20.89 12.47
26 Uttarakhand 0.0 49.77 25.68 11.23
27 Uttar Pradesh 88.09 75.39 75.00 0.00
28 West Bengal 0.0 25.85 10.00 24.06
Total 2162.80
2284.63 1487.83
883.05


@ Released under the erstwhile Integrated Watershed Management Programme (IWMP), which was amalgamated as the Watershed Development Component (WDC) of the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) from 2015-16

#Released under the Watershed Development Component (WDC) of the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)

Note: 1) WDC-PMKSY is not operational in Union Territories.
2) There is no sanctioned project in Goa.




ANNEXURE – IV

Annexure referred in reply to Part (b) of the Lok Sabha Starred Q.No. 2705 dated 01.12.2016 regarding “Contamination of Ground Water”
State-wise details of expenditure incurred on Public Works relating to Natural Resources Management under MGNREGA

S.No. State Public Works Relating To Natural Resources Management

Expenditure on NRM Works (Takenup)
(Rs. in lakhs)
2013-14 2014-15 2015-16 2016-17
as on 25/11/2016
1 Andaman And Nicobar 0.00 0.00 0.00 0.00
2 Andhra Pradesh 56003.81 83119.04 219432.52 189981.93
3 Arunachal Pradesh 98.22 399.54 1868.42 2557.24
4 Assam 9758.91 11433.52 18665.37 38223.79
5 Bihar 40169.25 33835.59 61890.80 57977.07
6 Chhattisgarh 37116.44 65617.32 67409.62 114121.39
7 Goa 43.99 141.35 102.46 61.69
8 Gujarat 8966.14 11585.08 21996.53 27798.67
9 Haryana 13161.48 8310.48 8366.58 12505.24
10 Himachal Pradesh 25923.62 19775.22 17392.75 14260.47
11 Jammu And Kashmir 8744.96 7219.05 19881.00 10137.48
12 Jharkhand 26845.20 33504.56 47635.36 64774.43
13 Karnataka 63559.02 53394.09 66917.40 73188.61
14 Kerala 63726.45 96234.91 85322.61 87527.47
15 Lakshadweep 21.34 16.26 5.12 0.00
16 Madhya Pradesh 62363.71 71975.88 63030.27 77220.00
17 Maharashtra 23765.64 58760.03 71854.35 57118.64
18 Manipur 1774.11 6857.71 8190.30 14817.83
19 Meghalaya 2876.07 5535.52 5948.88 15608.11
20 Mizoram 1301.22 5271.73 18758.93 3214.07
21 Nagaland 1645.17 1002.40 5017.35 13390.84
22 Odisha 20831.79 43189.39 78241.99 79490.56
23 Puducherry 740.40 465.00 804.47 759.38
24 Punjab 6644.96 9063.86 13969.24 20517.96
25 Rajasthan 60465.18 127798.51 162566.90 165193.72
26 Sikkim 2717.34 2000.17 3013.84 3563.56
27 Tamil Nadu 273071.92 247359.05 383893.37 299741.51
28 Telangana 75.23 41262.74 89834.18 60227.42
29 Tripura 45119.33 48183.66 75173.24 51531.31
30 Uttar Pradesh 41211.54 57814.94 122144.42 188714.19
31 Uttarakhand 9293.70 8320.78 13238.56 15272.69
32 West Bengal 103911.95 165325.65 213617.76 227503.12
Total 1011948.09 1324773.03 1966184.59 1987000.39


*****