THE MINISTER OF POWER(SHRI SUSHILKUMAR SHINDE)
(a) to (g) : A Statement is laid on the Table of the House.
STATEMENT
STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (g) OF
STARRED QUESTION NO. 382 TO BE ANSWERED IN THE LOK SABHA
ON 20.08.2010 REGARDING ALLOCATION OF POWER TO STATES.
(a) : The quantum of energy scheduled to various States
including Uttar Pradesh from the Central Generating Stations during
the last two years and the current year (up to June, 2010) is given at
Annex-I.
(b) & (c) : The availability of power in a state is sum total of
generation from its own sources, allocation from Central Generating
Stations (CGSs) and import of power from other states. The actual
availability of power to the States/UTs from the generating stations, be
it in Central, State or Private Sector, on day to day basis, gets reduced
to the extent of auxiliary power consumption, outages for planned
maintenance/renovation & modernization/Life Extension, forced outage
as well as operating restrictions due to shortage of fuel/water, etc.
The allocation of power from the CGSs to beneficiary States/UTs are
basically percentage allocations and they receive power from the
available capacity of the generating units, after accounting for the
aforementioned factors, strictly in accordance with the percentage
allocations to them. The state-wise details of requirement and actual
availability of power, both in terms of energy and peak, during last two
years and the current year (April â June, 2010) are given at Annex-II.
(d) & (e) : The 15% unallocated power in Central Generating Stations
(CGSs), kept at the disposal of the Central Government, is allocated
from time to time keeping in view the emergent and seasonal nature of
the requirement, the relative power supply position, utilization of
available power resources, operational and payment performance, etc.
The quantum of unallocated power being limited, it can only
supplement the power available from other sources. At any point of
time the entire unallocated power of Central Generating Stations
remains allocated to the States/UTs; enhancement in allocation of any
State/UT is carried out only by way of equivalent reduction in the
allocation of other State (s)/UT(s).
(f) & (g) : The present guidelines on allocation of power from the
Central Power Generating Stations to the States are proposed to be
reviewed.