Question : INTRODUCTION OF BULLET TRAIN



(a) whether the Railways have conducted any feasibility study on 533 km. long Pune-Mumbai-Ahmedabad section for introduction of bullet train;

(b) if so, the details thereof; and

(c) the details of such studies to be conducted for other parts of the country?

Answer given by the minister


MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI K.H. MUNIYAPPA)

(a) & (b): A Consultant has been engaged for pre-feasibility study for High Speed Rail Corridor between Pune-Mumbai-Ahmedabad. The study is going on and the Consultant has not yet submitted the final report.

(c): The other corridors selected for prefeasibility studies are:

(i) Delhi-Chandigarh-Amritsar

(ii) Hyderabad-Dornakal-Vijaywada-Chennai

(iii) Chennai-Bangalore-Coimbatore-Ernakulam

(iv) Howrah-Haldia

(v) Delhi-Agra-Lucknow-Varanasi-Patna