(a) whether the Railways have conducted the survey for new rail-routes in Uttar Pradesh under the
schemes announced during the year 2006-07:
(b) if so, the details thereof
(c) whether laying of rail-tracks on the above routes has been sanctioned;
(d) if not, the reasons therefor;
(e) whether the routes have been cancelled before laying of the tracks on the
above routes; and
(f) if so, the reasons therefor?