THE MINISTER OF NEW & RENEWABLE ENERGY AND POWER
(SHRI R.K. SINGH)
(a) to (d) A Statement is laid on the Table of the House.
*****
STATEMENT
STATEMENT REFFERED TO IN REPLY TO LOK SABHA STARRED QUESTION NO. 165 FOR 28.07.2022 REGARDING GENERATION OF POWER THROUGH SOLAR ENERGY
(a) Central Electricity Authority has reported that the power generated through solar energy in the country during the last five years has been as under:
Year Electricity from Solar energy (in MU)
2017-18 25871.07
2018-19 39268.19
2019-20 50131.09
2020-21 60402.26
2021-22 73483.94
(b) As on 30.6.2022, solar power projects of 57.71 GW have been installed in the country, 48.7 GW are under installation and 16.7 GW are under bidding , totaling 123.1 GW. Total installed solar capacity in Gujarat is 7.81 GW and 6.1GW is under installation.
(c) Most of the solar power projects are installed by private sector developers and as per the normative cost of Rs. 4.5 Crore per MW, an expenditure of approximately Rs. 2.60 lakh crore has been incurred on solar installations of capacity 57.71 GW.
(d) State-wise details of funds released under various solar schemes of Ministry of New and Renewable Energy (MNRE) during the last three years are given at Annexure.
*****
Download PDF Files