(a) the details of the mega power projects enlisted by a technical group in 1998-99;
(b) the present status of each of the projects;
(c) the names of the projects being developed in the public sector and their present status; and
(d) the names of the gas-import-terminals proposed to be set up in the public sector as well as private sector with their present status, alongwith their location and their capacity?