(a) the details of the progress made by the Railways in introducing the high speed rail corridors in the country, zone-wise;
(b) the standards adopted including infrastructure, rolling stock and operating conditions for the proposed corridors;
(c) whether the corridors will be built on standard gauge; and
(d) if so, the details thereof?