MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI BANDARU DATTATRAYA)
(a) to (c): A Statement is attached.
(d): No, Sir. The approach will be the same. The direct entry to platform no. 4 will be closed and new entry will be provided via Foot Over Bridge extended on East side.
(e): No, Sir.
(f): Does not arise.
STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (c) OF UNSTARRED QUESTION NO. 6549 BY SHRI KIRIT SOMAIYA TO BE ANSWERED IN LOK SABHA ON 08.05.2003 REGARDING NEW RAIL PROJECTS IN CENTRAL RAILWAY, MUMBAI.
(a) to (c): Details are as under:
(I) New Foot Over Bridges (FOBs)-
(II) No new FOB has been sanctioned in Kurla-Mankhurd section.
S.No. Station Details of work of FOB Status
1. Kanjurmarg Work of FOB with over head The work has been Booking Office at a cost of Rs.38 sanctioned in Works Lakh. Outlay for 2003-04 - Rs. 5 Programme 2003-04. Lakh. (The target date of completion is July, 2004.)
2. Kurla Work of 6 m wide FOB Tender invited. at a cost of Rs.175 lakh. (Target date of Outlay for 2003-04 - completion is Rs. 69.00 lakh. December, 2004).
2. Ghatkopar Work of 12 m wide FOB Tender invited. at a cost of Rs.257 lakh. (Target date of Outlay for 2003-04 - completion is Rs. 87.00 lakh. March, 2005).
(III) Extension of Foot Over Bridges (FOBs)-
S.No. Station Details of work of FOB Status
1. Govandi Extension of FOB to West side Tender invited. at a cost of Rs.30 lakh. (Target date of Outlay for 2003-04 - Rs.15 completion is Lakh. September, 2004.)
2. Bhandup Extension from PF No. 2/3 Target date of to PF No. 4 at a cost of completion is Rs.27 lakh. Outlay for September, 2004. 2003-04 - Rs. 15.00 lakh.
(IV) In addition to above, FOBs at Ghatkopar, Kanjurmarg & Mulund have already been
extended in connection with 5th & 6th line work.
(V) The repair works at Railway stations are taken up regularly as and when required on
condition basis.