Question : Safety of Dams

(a) whether the Government is considering to facelift large dams in the country and if so, the details thereof, Statewise;
(b) whether there is any threat in terms of safety of dams as reported to the Government due to their overage and if so, the details thereof; and
(c) the major works which are going to be included in facelift of the dams?

Answer given by the minister

THE MINISTER OF STATE FOR WATER RESOURCES, RIVER DEVELOPMENT AND GANGA REJUVENATION & PARLIAMENTARY AFFAIRS

(SHRI ARJUN RAM MEGHWAL)

(a) Yes, Madam. Government of India with financial assistance from World Bank started Dam Rehabilitation and Improvement Project (DRIP) in 2012 for rehabilitation of 223 dam projects, initially in 4 States (namely Kerala, Madhya Pradesh, Odisha and Tamil Nadu) and Central Water Commission (CWC). Later, Karnataka Water Resources Department, Damodar Valley Corporation (DVC) and Uttarakhand Jal Vidyut Nigam Limited (UJVNL) joined the project.

State-wise details of dams and fund allocated under DRIP are at Annexure-I.

(b) Safety of dams primarily rests with dam owners which are mostly State Governments, Central and State power generating PSUs. Dam owners generally carry out pre-monsoon and post-monsoon inspections of their dams to identify deficiencies or areas that need monitoring or immediate attention.

Union Government constituted National Committee on Dam Safety (NCDS) headed by Chairman, CWC and representatives from State Governments and PSUs. The objectives/mandates of NCDS are:

i) To oversee dam safety activities in various States and suggest improvements to bring these in line with the latest state-of-art consistently with Indian conditions.

Contd...P/2
//2//
ii) To act as a forum of exchange of views on techniques adopted for remedial measures to relieve distress.
iii) To monitor the follow-up action on the report on dam safety procedures.
iv) To recommend any other measures connected with dam safety.

38 meetings of NCDS have been conducted so far.

Under DRIP, safety conditions of about 225 dam projects have been comprehensively reviewed by the Dam Safety Review Panel (DSRP). During the comprehensive review by the DSRP, it was found that many dams have structural deficiencies and shortcomings in operation and monitoring facilities on account of ageing. Some dams do not meet the present design standards – both hydrologically and structurally. The list of dams reviewed by the DSRP under DRIP is at Annexure-II.

(c) The major works carried out for rehabilitation and improvement of dams under DRIP are:

i) Hydrological safety review to check the adequacy of the spillway for safely passage of revised design flood, through structural and non-structural measures;
ii) Treatment of leakage through masonry and concrete dams,
iii) Reduction of seepage through earth dams and their foundations
iv) Improving dam drainage;
v) Improving approach roads and access to all parts of dam;
vi) Rehabilitation and improvement of spillway, head regulator and draw-off gates and their operating mechanisms;
vii) Providing dam safety instrumentations, improving communication system between upstream and downstream control points;
viii) Preparation of Emergency and Disaster Management Plan;
ix) Preparation of operation and maintenance manuals etc.



******

Annexure-I
Annexure referred to in reply to part (a) of the Unstarred Question No.6345 to be answered in Lok Sabha on 05.04.2018 regarding “Safety of Dams”.

State-wise details of dams and fund allocated to Project Implementing Agencies (IAs) under DRIP
Implementing Agency State No of DRIP dams Fund Allocated
(Rs. Crore)
Water Resource Department & State Electricity Board Kerala 28 279.98
Water Resource Department Orissa 26 147.74
Water Resource Department Madhya Pradesh 25 314.54
Water Resource Department & Tamil Nadu Generation and Distribution Corporation Limited (TANGENCO) Tamil Nadu 89 745.49
Water Resource Department Karnataka 22 276.75
Damodar Valley Corporation Jharkhand 3 139.40
Uttarakhand Jal Vidyut Nigam Limited (UJVNL) Uttarakhand 5 64.10
Central Water Commission 132.00
Total 198 2100.00


Annexure-II
Annexure referred to in reply to part (b) of the Unstarred Question No.6345 to be answered in Lok Sabha on 05.04.2018 regarding “Safety of Dams”.

List of dams reviewed by the DSRP under DRIP

S.No Implementing Agency Name of Dam

TAMIL NADU
1 TANGEDCO AVALANCHE
2 TANGEDCO BUNGHIHALLABUND
3 TANGEDCO CHINNAKUTIYAR
4 TANGEDCO EAST VARAHAPALLAM WEIR
5 TANGEDCO EMERALD
6 TANGEDCO ERAVANGALAR
7 TANGEDCO GLENMORGAN
8 TANGEDCO HIGHWAVYS
9 TANGEDCO KADAMBARAI
10 TANGEDCO KODAYAR I
11 TANGEDCO KODAYAR II
12 TANGEDCO KUNDAHPALAM
13 TANGEDCO KUTTIYAR
14 TANGEDCO MANALAR
15 TANGEDCO MARAVAKANDI
16 TANGEDCO MOYAR FOREBAY
17 TANGEDCO MUKURTHI
18 TANGEDCO NIRALAPALLAM
19 TANGEDCO PAPANASAM DIV WEIR
20 TANGEDCO PARSON''S VALLEY
21 TANGEDCO PEGUMBAHALLAH FOREBAY
22 TANGEDCO PERIYAR FOREBAY
23 TANGEDCO PILLUR
24 TANGEDCO PORTHIMUND
25 TANGEDCO PYKARA
26 TANGEDCO PYKARA NEW FOREBAY
27 TANGEDCO SANDYNALLAH
28 TANGEDCO SERVALAR
29 TANGEDCO THAMBRAPARANI
30 TANGEDCO UPPER ALIYAR
31 TANGEDCO UPPER BHAVANI
32 TANGEDCO UPPER BHAVANI PUMPING WEIR
33 TANGEDCO VANDAL WEIR
34 TANGEDCO VENNIRAR
35 TANGEDCO WEST VARAHAPALLAM WEIR
36 TANGEDCO WESTERN CATCHMENT NO.1
37 TANGEDCO WESTERN CATCHMENT NO.2
38 TANGEDCO WESTERN CATCHMENT NO.3
39 TNWRD ADAVINAINARKOVIL
40 TNWRD ALIYAR
41 TNWRD AMARAVATHI
42 TNWRD ANAI MADUVU
43 TNWRD ANAIKUTTAM
44 TNWRD BHAVANISAGAR
45 TNWRD CHEMBARAMPAKKAM
46 TNWRD CHINNAR
47 TNWRD CHITTAR I
48 TNWRD CHITTAR II
49 TNWRD CHOLAVARAM
50 TNWRD GATANA
51 TNWRD GOLWARPATTI
52 TNWRD GOMUKHINADI
53 TNWRD GUNDERIPALLAM
54 TNWRD KARIAKOIL
55 TNWRD KARUPPANADHI
56 TNWRD KELAVARAPALLI
57 TNWRD KESARIGULIHALLA
58 TNWRD KODAGANAR
59 TNWRD KODUMUDIYAR
60 TNWRD KRISHNAGIRI
61 TNWRD KULLURSANDAI
62 TNWRD KUTHIRAIYAR
63 TNWRD LOWER ANICUT
64 TNWRD LOWER NIRAR
65 TNWRD MANIMUKTHANADHI
66 TNWRD MANIMUTHAR
67 TNWRD MANJALAR
68 TNWRD MARUDHANADHI
69 TNWRD METTUR
70 TNWRD MORDHANA
71 TNWRD NAGAVATHI
72 TNWRD NAMBIAR
73 TNWRD NOYYAL ATHUPALAYAM
74 TNWRD PALAR PORUNDALAR
75 TNWRD PAMBAR
76 TNWRD PARAMBIKULAM
77 TNWRD PECHIPARAI
78 TNWRD PERUNCHANI
79 TNWRD PERUVARIPALLAM
80 TNWRD PILAVUKKAL PROJECT KOVILAR
81 TNWRD PILAVUKKAL PROJECT PERIYAR
82 TNWRD POIGAIYAR
83 TNWRD PONNANIYAR
84 TNWRD POONDI
85 TNWRD RAMANADHI
86 TNWRD RED HILLS
87 TNWRD SATHANUR
88 TNWRD SHANMUGANADHI
89 TNWRD SHOLAYAR
90 TNWRD SHOOLAGIRICHINNAR
91 TNWRD SIDDHAMALLI
92 TNWRD SOTHUPPARAI
93 TNWRD THIRUMURTHI DAM
94 TNWRD THOPPAIYAR
95 TNWRD THUMBALAHALLI DAM
96 TNWRD THUNAKADAVU
97 TNWRD UPPER (TIRPUR)
98 TNWRD UPPER (TRICHY)
99 TNWRD UPPER NIRAR WEIR.
100 TNWRD VADAKKUPAICHAIYAR
101 TNWRD VAIGAI
102 TNWRD VANIAR
103 TNWRD VARATTUPALLAM
104 TNWRD VEERANAM
105 TNWRD VEMBAKOTTAI
106 TNWRD VIDUR
107 TNWRD WILLINGTON RESERVOIR
KERALA
108 KSEB SABARIGIRI HEP
109 KSEB PANNIYAR HEP
110 KSEB IDAMALAYAR (EB)
111 KSEB IDUKKI (HEB)
112 KSEB KALLARKUTTY (EB)
113 KSEB KUTTIYADI HEP
114 KSEB LOWER PERIYAR HEP
115 KSEB PALLIVASAL HEP
116 KSEB KAKKAD HEP
117 KSEB PORINGALKUTHU (EB)
118 KSEB SENGULAM (EB)
119 KSEB SHOLAYAR HEP
120 KWRD CHIMONI (ID)
121 KWRD CHULLIAR (GAYATHRI STAGEII) (ID)
122 KWRD KALLADA (PARAPPAR) (ID)
123 KWRD KANJIRA PUZHA (ID)
124 KWRD KUTTIYADI (IRRIGN. PROJ.) (ID)
125 KWRD MALAMPUZHA (ID)
126 KWRD MEENKARA (GAYATHRI STAGE I) (ID)
127 KWRD MOOLATHARA REG.(CHITTURPUZHA)
128 KWRD MALANKARA / MUVATTUPUZHA IRRIGATION
129 KWRD NEYYAR (ID)
130 KWRD PAZHASSI IRRIGATION PROJECT
131 KWRD PEECHI (ID)
132 KWRD PERIYAR VALLEY BARRAGE (ID)
133 KWRD POTHUNDY (ID)
134 KWRD VAZHANY (ID)
135 KWRD WALAYAR (ID)
MADHYA PRADESH
136 MPWRD ARI DAM
137 MPWRD ARNIYA BAHADURPUR
138 MPWRD BAHURIBAND TANK(KATNI)
139 MPWRD BARNA
140 MPWRD BIRPUR
141 MPWRD BUNDALA
142 MPWRD CHANDPATHA
143 MPWRD CHANDRAKESHAR
144 MPWRD DHOLAWAD TANK(RATLAM)
145 MPWRD DUDHI (KUNWAR CHAIN SAGAR)
146 MPWRD JIRBHAR
147 MPWRD KANCHAN(SINGRAULI)
148 MPWRD KANHARGAON TANK(CHHINDWARA)
149 MPWRD KANKERKHEDA
150 MPWRD KHARADI
151 MPWRD KOLAR
152 MPWRD MAKRODA
153 MPWRD MARHI
154 MPWRD MOORUM NALLA
155 MPWRD NAHLESARA
156 MPWRD RUTHAI (GOPI KRISHNA SAGAR)
157 MPWRD SAMPNA
158 MPWRD SANJAY SAGAR
159 MPWRD SARATHI
160 MPWRD TAWA
161 MPWRD THANWER (RAJIVSAGAR)
162 MPWRD TIGRA
163 MPWRD UMRAR
164 MPWRD UPPER WAIN GANGA (SANJAY SROVER)
ODISHA
165 OWRD ASHOK NALLA
166 OWRD BALASKUMPA
167 OWRD BALIMELA
168 OWRD BANKSAL
169 OWRD BHASKEL
170 OWRD DAHA
171 OWRD DAMSAL
172 OWRD DERJANG
173 OWRD DHANEI
174 OWRD HIRAKUD
175 OWRD JHUMUKA
176 OWRD KALO
177 OWRD NESA
178 OWRD PILLASALKI
179 OWRD PITAMAHAL
180 OWRD RENGALI
181 OWRD SALANDI
182 OWRD SALIA
183 OWRD SANMACHHAKANDANA
184 OWRD SAPUA
185 OWRD SARAFGARH
186 OWRD SATIGUDA (MALKANGIRI)
187 OWRD SATIGUDA (UKP)
188 OWRD SUNDAR
189 OWRD TALSARA
190 OWRD UPPER KOLAB
KARNATAKA
191 KAWRD ALMATTI DAM
192 KAWRD AMARJA DAM
193 KAWRD BENNITHORA
194 KAWRD BHADRA DAM
195 KAWRD CHANDRAMPALLI DAM
196 KAWRD CHICKKAHOLE
197 KAWRD DEVARABILLIKERE TANK
198 KAWRD DHARMA RESERVOIR
199 KAWRD GAYATHRI RESERVOIR
200 KAWRD H.B.HALLI PICKUP
201 KAWRD HARANGI DAM
202 KAWRD HATTIKUNI DAM
203 KAWRD HEMAVATHY DAM
204 KAWRD HIDKAL DAM
205 KAWRD KABINI DAM
206 KAWRD KARANJA DAM
207 KAWRD KRISHNA RAJA SAGARA DAM
208 KAWRD LOWER MULLAMARI DAM
209 KAWRD MADAGAMASUR TANK
210 KAWRD MALAPRABHA DAM
211 KAWRD MALLAGHATTA TANK
212 KAWRD MASKINALA
213 KAWRD NARAYANAPUR DAM
214 KAWRD TUNGABHADRA DAM
215 KAWRD UPPER MULLAMARI DAM
216 KAWRD VANIVILASA SAGAR DAM
217 KAWRD VOTEHOLE DAM
UTTARAKHAND
218 UJVNL ASAN BARRAGE
219 UJVNL DAKPATHAR BARRAGE
220 UJVNL ICHARI DAM
221 UJVNL MANERI DAM
222 UJVNL VIRBHADRA RISHIKESH
DAMODAR VALLEY CORPORATION LIMITED
223 DVC KONAR DAM
224 DVC MAITHON
225 DVC PANCHET

Download PDF Files