MINISTER OF STATE FOR URBAN DEVELOPMENT ( SHRI BANDARU DATTATREYA )
(a): Yes, Sir.
(b): The details regarding the status of NCR financed projects,
status of completed projects and status of ongoing projects is
as per Annexure `A`. State/town wise and scheme wise details of
completed projects and ongoing schemes under joint sector
projects funded by NCR Planning Board are as per Annexure `B` &
`C` respectively.
ANNEXURE-A
ANNEXURE REFERRED TO IN REPLY TO PART (b) OF LOK SABHA USQ.NO.
5582 FOR 2.5.2000
STATUS OF NCR FINANCED PROJECTS (UPTO MARCH, 2000) (Rs. in crores)
STATES NO. OF ESTIMATED LOAN LOAN EXPENDITURE SCHEMES COST SANCTIONED RELEASED AS ON 12/99
-
U.P. 55 1269.57 663.61 334.55 315.72
RAJASTHAN 45 375.54 196.68 134.25 171.41
HARYANA 34 1735.62 612.38 386.98 582.60
-
SUB-TOTAL 134 3380.73 1472.67 855.78 1069.73
CMAs 4 433.80 54.00 34.74 46.96
TOTAL 138 3814.53 1526.67 890.52 1116.69
STATUS OF COMPLETED PROJECTS (RS. IN CRORES)
-
STATES NO. OF ESTIMATED LOAN EXPENDITURE SCHEMES COST RELEASED AS ON 12/99
-
U.P. 13 93.31 29.21 86.99
RAJASTHAN 30 80.61 29.30 64.48
HARYANA 14 62.85 12.52 52.22
-
TOTAL 57 236.77 71.03 203.69
-
STATUS OF ONGOING PROJECTS (AS ON 31.3.2000) (RS. IN CRORES)
STATES NO. OF ESTIMATED LOAN LOAN % LOAN EXPENDITURE SCHEMES COST SANCTIONED RELEASED DRAWN AS ON 12/99
U.P. 42 1176.26 634.40 305.34 48.32 228.73
RAJASTHAN 15 294.93 167.38 104.95 62.70 106.93
HARYANA 20 1672.77 599.86 374.46 62.42 530.38
SUB-TOTAL 77 3143.96 1401.64 784.75 56.09 866.04
CMAs 4 433.80 54.00 34.74 64.33 46.96
TOTAL 81 3577.76 1455.64 819.49 56.39 913.00
ANNEXURE-B
STATEISE/TOWNWISE AND SCHEME WISE DETAILS OF SCHEMES COMPLETED IN THE REGION
STATE: HARYANA (Rs. in Lacs)
-
S.NO. NAME OF THE SCHEME ESTIMATED AREA LOANS LOANS EXPENDITURE COST RELEASED RELEASED INCURRED BY CENTRAL BY THE UPTO 12/99 (IN GOVT.(UPTO BOARD ACRES) 3/85
GURGAON
1. DEVELOPMENT OF SEC. 15 584.64 1145.03 251.03 230.00 1810.00
(INDUSTRIAL) NEW NO. 18,
19 AND 20 GURGAON
2. DEVELOPMENT OF SEC.4 & 7 378.96 410.92 50.00 25.00 345.46
SCHEME GURGAON.
3. SECTOR 14 (RESIDENTIAL) 574.92 156.23 40.35 0.00 262.35
SCHEME GURGAON
4. SECTOR 17 (RESIDENTIAL) 367.87 340.00 13.00 0.00 390.14
SCHEME AT GURGAON
5. LAND ACQUISITION & DEVE- 1880.00 235.00 0.00 350.00 437.55
LOPMENT SEC.32 & PART RESI-
DENTIAL SEC. 39 AT GURGAON
6. CONSTRUCTION OF EXTERNAL 290.00 0.00 113.00 182.86
LINK ROAD CONNECTING WITH
SEC. 17 GORGAON
-
SUB TOTAL 4076.39 2287.18 354.38 718.00 3428.96
-
PANIPAT
7. DEVELOPMENT OF SECTOR 685.87 486.95 87.00 273.50 867.74
11 & 12(RESIDENTIAL) PANIPAT
8. SECTOR 25 (INDUSTRIAL) 126.00 100.00 28.00 0.00 117.37
SCHEME AT PANIPAT
9. CONSTRUCTION OF TRANS- 94.35 0.00 46.00 93.05
PORT NAGAR AT PANIPAT
10. SECTOR 25 (INDUSTRIAL) 353.78 52.64 0.00 65.00 47.61
PHASE-II FOR INFORMAL SEC. PANIPAT
11. DEVELOPMENT SCHEME OF 693.00 135.00 0.00 108.00 415.84
INDUSTRIAL SEC. 7, PANIPAT
-
SUB-TOTAL 1953.00 774.59 115.00 492.50 1541.61
REWARI
12. BRASS MARKET AT REWARI 133.04 9.14 0.00 27.00 85.51
13. SHOPPING CENTRE SECTOR 28.15 1.56 0.00 7.00 31.07
3 AT REWARI
-
SUB TOTAL 211.19 10.72 0.00 34.00 116.58
-
DHARUHERA
14. SHOPPING CENTRE SECTOR 44.11 2.46 0.00 8.00 135.20
6 AT DHARUHERA
-
GRAND TOTAL 6284.69 3074.95 469.38 1252.50 5222.35
ALWAR
15. Commercial Complex Scheme 37.73 0.00 16.50 24.34
Alwar
16. SHIVAJI PARKI COMMERCIAL 29.40 0.00 14.70 28.47
COMPLEX SCHEME, ALWAR
17. 14 Residential and 3- 534.80 784.22 252.00 0.00 526.66
Commercial Scheme Alwar
(one Scheme dropped)
18. Development of Kacchi 38.00 0.00 75.57
Basti at Alwar
19. IUDP[ Counter Magnet Scheme 47.05 0.00 94.18
at Alwar
20. Construction of Rail 235.00 0.00 80.00 151.13
Road over bridge Alwar
21. construction of Truck 103.42 39.50 0.00 51.50 107.56
Terminal at Alwar
22. Residential Scheme at 328.00 148.00 0.00 128.50 244.38
Hasan Khan Mewati Nagar, Alwar
23. Residential Scheme of 375.00 219.00 0.00 187.50 237.38
Budh Vihar (Vijay Nagar Extn.)
Alwar (Plotted) Development)
24. Jindoli Ghari Tunnel at 602 0.00 395.00 933.64
Jindoli Ghati near Alwar -
Bharatpur Road
-
SUB-TOTAL 2245.35 1190.72 337.05 873.70 2423.66
-
BHIWADI
25. Integrated Development 3652.00 760.55 0.00 975.00 19.02.96
of Jawahar Nagar, Chitrocut,
Vasundhara & Patel Nagar,
Resd. Scheme at Bhiwadi
26. Residential & Commercial 250.00 94.80 0.00 125.00 204.26
Scheme at Bhiwadi (Bhagat
Singh Scheme)
27. Development of Industrial1914.00 497.18 0.00 957.00 1917.19
Township phase III, Bhiwadi
SUB-TOTAL 5816.00 1352.53 0.00 2057.00 4024.41
GRAND TOTAL: 8061.35 2543.25 337.05 2930.70 648.07
STATEWISE/TOWNWISE AND SCHEME WISE DETAILS OF SCHEMES COMPLETED IN THE REGION
STATE : UTTAR PRADESH
HAPUR
-
1. Residential & Commercial 225.00 31.00 49.00 50.00 233.12
Scheme between Meerut & Hapur 40.00
Road, Hapur
-
MEERUT
-
2. Scheme No. 2 (Trans- 77.48 52.40 19.00 0.00 75.45
port Nagar between Bagpat &
Meerut Road)
3. Scheme No. 3 (Residl.) 451.60 378.60 112.00 0.00 575.83
Scheme between Meerut & Hapur Road
4. Development of Begum 112.00 0.00 50.00 115.00
Bridge area at Meerut
5. Commercial Complex Scheme 292.44 103.42 30.00 32.00 222.75
at Garhmukteshwar Rd. Meerut
6. Residential Scheme at 1450.97 269.96 46.00 355.00 1613.69
betwwen Meerut & Garmukteshwar
Road in front of Medical College
Scheme No. 6
7. Residential Scheme at 1296.03 446.96 151.00 190.00 1974.32
Meerut Hapur & Meerut Garmuk-
teshwar Road
8. Residential Scheme at 1524.80 432.84 115.00 625.00 1652.80
Pallavapuram
9. Hathkargha Nagar Housing 1516.40 217.45 0.00 610.00 935.99
cum work Centre Scheme
10. Scissors Manufacturing 152.00 19.87 0.00 68.00 113.82
and trading unit complex at Meerut
11. Sports Good manufac- 1003.00 82.93 0.00 401.50 417.93
turing and trading unit complex at Meerut
12. Ganga nagar Redidenl. 1136.24 210.00 0.00 492.00 674.54
Scheme Phase 3 at Meerut
13. Raichandi Commircial 93.50 2.69 0.00 47.00 93.50
Scheme at Khurja
-
SUB-TOTAL: 9106.46 2217.12 473.00 2870.50 8465.62
GRAND TOTAL: 9331.46 2248.12 562.00 2920.50 8698.74
ANNEXURE-C
DETAILS OF ONGOING SCHEMES UNDER JOINT SECTOR PROJECTS FUNDED BY NCR PLANNING BOARD
(AS ON 31.3.2000)
(RS. IN LAKHS)
-
S.NO. NAME OF THE SCHEME AREA ESTIMATED LOANS LOANS EXPENDITURE (IN COST SANCTION RELEASED INCURRED ACRE) ED UPTO 3/00
-
RIICO
1. Matsya Industrial Area, 489.70 2066.00 1400.00 550.00 704.40
Extn. Alwar
2. Dev. of Khushera Indl. 680.00 3632.37 2425.00 1700.00 1984.76
Area, Bhiwadi
3. Dev. of Indl. Areas 820.00 4410.00 3307.00 2800.00 3345.70
Chopanki
4. Upgradation & Improve- 9 Kms. 1245.93 600.00 600.00 1110.54
ment of Dharuhera, Bhiwadi Road
5. Dev. of Special Complex 55.31 1004.00 753.00 600.00 317.30
at Bhiwadi
6. Development of Export Pro-482.30 5327.51 2400.00 1000.00
motion Industrial Park at Tapukra
7. Improvement & Development 655.34 1800.00 1350.00 675.00 976.50
of Indl. Area, Neemrana.
SUB-TOTAL 3182.65 1948.81 12235.00 7925.00 8439.20
UIT ALWAR
8. Residential Scheme of 209.95 1605.00 802.71 523.11 853.44
Surya Nagar at Alwar
9. Residential Scheme of 118.31 1036.00 518.00 345.00 485.07
Vaishali Nagar at Alwar
10. Warehousing & Godown 113.27 887.33 665.50 336.50 354.63
Scheme at Alwar
11. Transport Nagar Scheme 65.60 468.09 351.00 240.00 77.40
Part b, Alwar
12. Ambedkar nagar Resdl. 315.00 3137.00 1023.00 400.00 662.95
Scheme at Alwar
13. Commercial Complex Near - 175.00 75.00 75.00 -
Kedal Ganj at Alwar
14. Rao Tula Ram Nagar Resdl. 54.14 571.94 300.00 450.00 -
Scheme at Behror
15. Aravali Vihar Resdl. 204.91 2126.60 767.74 500.00 -
Scheme at Alwar
SUB-TOTAL 1081.18 10006.96 4502.85 2569.61 2433.49
-
GRAND TOTAL: 4260.83 29481.77 16737.85 10494.61 10457.91
HARYANA SUB - REGION (RS. IN LAKHS)
-
S.NO. NAME OF THE SCHEME AREA ESTIMATED LOANS LOANS EXPENDITURE (IN COST SANCTION RELEASED INCURRED ACRE) ED UPTO 9/99
HARYANA URBAN DEVELOPMENT AUTHORITY
1. Resdl. Sec. 18 at Panipat 415.23 2664.92 1986.00 1750.00 2332.31
2. Resdl. Sec. 4 at Rewari 281.00 1076.20 806.00 606.00 693.88
3. Resdl. Sec.2 at Faridabad 402.91 3457.25 2592.95 1872.00 2166.42
4. Indl. Sec.58 at Faridabad 525.42 3116.56 2337.00 1837.00 2240.93
5. Resdl. Sec. 2 at Palwal 230.40 1502.07 1124.00 923.55 1011.62
6. Resdl. Sec. 40 at Gurgaon 118.14 3120.07 2340.90 1327.57 1681.04
7 Resdl. Sec. 39 at Gurgaon 110.11 2908.00 2179.46 1415.65 1600.42
8. Resdl. Sec. 13&17 Panipat 284.69 4498.00 2249.00 1646.00 2105.78
9. Resdl. Sec. 3 (Part II), 62.56 1178.60 569.30 375.79 476.63
Rewari
10. Sector 2,3,4,(part-I), 204.15 2388.24 1194.00 825.40 1783.71
Residential Scheme at Rohtak
11. Industrial Sec. 59, 136.22 3471.14 2603.52 930.33 1026.70
Faridabad
12. Resdl. Sec. 2&3, Part, 85.84 1737.40 868.70 532.14 695.71
Rohtak
13. Resdl. Sec. 12, Sonipat 236.00 4047.05 3035.00 1124.00 1463.35
14. Resdl. Sec. 38, Gurgaon 224.60 15623.97 6162.20 5694.06 7249.85
15. Resdl. Sec. 9 & 9 A 344.81 12418.74 2644.46 2128.59 2189.88
Bahadurgarh
16. Resdl. Sec. 24 at 154.79 6414.63 1859.06 1607.36 1970.64
panipat
SUB - TOTAL 3816.87 69622.84 34551.55 24596.03 30688.87
-
HSIDC
17. Development of Growth 1180.00 17868.00 2550.00 1850.00 4599.63
Centre, Bawal
18. Development of Industrial OB1749.00 56457.00 12000.00 7500.00 15706.16
Model Township at Manesar
19. Development of Industrial 457.00 12229.32 6037.00 1500.000 1175.94
Estate, Ph. IV at Kumdli
20. Development of Industrial 499.00 11100.00 4847.00 2000.00 867.84
Estate at Barihi (Gannor)
SUB-TOTAL: 3885.00 97654.32 25434.00 12850.00 22349.57
GRAND TOTAL: 7701.87 167277.16 59985.55 37446.03 53038.44
U.P. SUB REGION (RS. IN LAKHS)
-
S.NO. NAME OF THE SCHEME AREA ESTIMATED LOANS LOANS EXPENDITURE (IN COST SANCTION RELEASED INCURRED ACRE) ED UPTO12/99
GHAZIABAD DEVELOPMENT AUTHORITY
1. Transport Nagar in 41.49 2858.30 2140.72 1150.00 134.50
Ghaziabad
2. Augmentation of Water 8679.80 3905.97 375.00 1541.00
Supply of T.H.A.- 50
cusec Water from upper Ganga canal
3. Improvement of Drainage - 200.00 150.00 75.00 26.05
System in Ghaziabad
SUB- TOTAL 41.49 11738.10 6196.69 1600.00 1701.55
U.P. HOUSING & DEVELOPMENT BOARD
4. Vasundhara Nagar Resdl. 3050.00 4595.00 3450.00 750.00 1327.33
Infrastructure Scheme, Ghaziabad
-
SUB - TOTAL 3050.00 4595.00 3450.00 750.00 1327.33
-
HAPUR - PILKHUA DEVELOPMENT AUTHORITY
5. Fruit & Vegetable Market 15.00 1074.21 764.38 530.00 662.50
scheme at Hapur
6. anand Vihar Resdl. 4824.84 10588.87 7941.54 4614.54 -
Scheme at Hapur
7 Bus Stand Development 30.65 646.00 484.50 222.00 -
Scheme at Hapur
8. Preet Vihar Housing 91.40 1939.46 1003.90 - 477.37
Scheme at Hapur
9. Transport Nagar Develop- 55.92 1641.22 1231.00 856.00 -
ment Scheme on Delhi Hapur Rd. Hapur
SUB - TOTAL 617.81 1589.76 11425.32 6222.54 1139.87
-
NAGAR NIGAM, GHAZIABAD
10. Improvement of Water 223.00 167.01 80.00 63.81
Supply Scheme/System in
T.H.A. Ghaziabad
11. Improvement of Water 307.00 230.37 114.00 43.60
Supply System in CIS Hindon
Area Ghaziabad
12. Improvement of Street 245.00 183.00 70.50 8.30
Lights in Ghaziabad
13. Improvement of existing 200.00 150.00 75.00 71.85
Water supply system in Ghaziabad
14. Improvement of Drainage 160.00 120.00 60.00 21.37
system in Nagar Nigam area
at Ghaziabad
15. Improvement of Road Network 1126.00 844.50 400.00 291.87
in Ghaziabad
-
SUB- TOTAL: 2261.00 1694.88 800.00 500.80
-
U.P. SUB REGION (RS. IN LAKHS)
S.NO. NAME OF THE SCHEME AREA ESTIMATED LOAN LOAN EXPENDITURE (IN COST SANCTION RELEASED INCURRED ACRE) ED UPTO12/99
UPSIDC
16. Industrial Scheme at 74.14 1200.00 500.00 500.00 818.17
Udyog Puram, Meerut
17. Integrated Indl. Town- 1204.60 6688.00 2400.00 1050.00 620.43
ship at Khurja
18. Integrated Indl. Town- 1230.00 23016.00 11100.00 2000.00 7624.54
ship at Loni
-
SUB - TOTAL: 2508.74 30904.00 14000.00 3550.00 9063.14
-
MEERUT DEVELOPMENT AUTHORITY
19. Shatabdi Nagar (Sec.2, 412.00 1073.00 535.00 505.00 618.62
48,5,6&8) Resdl. Infrastruc-
ture Scheme
20. Shatabdi nagar Sector 250.95 1013.58 506.79 506.79 986.47
4 (c) Resdl. Scheme Meerut
21. Vedvyas Puri Resdl. 678.31 2939.86 1474.93 885.00 1311.51
Scheme at Meerut
22. Shatabdi Nagar New 1942.25 5311.82 3983.87 1650.00 1655.19
Township Development Scheme
at Meerut
23. Scheme for marketability 4209.39 3157.00 1538.00 1656.51
of assets created by MDA
SUB - TOTAL: 3283.51 14557.65 9657.59 5084.79 6288.30
-
GREATER NOIDA
24. Internal Development 158.38 2982.73 1179.00 1179.00 754.08
of Resdl. Sec. Delta I,
Gr. NOIDA
25. Internal Development of 158.67 2911.00 1000.00 1000.00 794.00
Resdl. Sec. Delta II, Gr. NOIDA
26 Internal development 118.34 1753.29 440.00440.00 171.00
of Resdl. Sector Delta III
Gr. NOIDA
27. Internal Development 190.19 3635.83 1200.00 1200.00 706.44
of resdl. Scheme Swarn
Nagri Greater NOIDA
28. Development to Toy City 134.94 2022.66 500.00 500.00 0.00
Industri Scheme in Surajpur (Gr. NOIDA)
29. Development of Udyog Vihar 782.89 7624.51 1500.00 1500.00 0.00
30. Noida-Greater NOIDA 6629.00 4971.75 3000.00 0.00
Expressway project
SUB -TOTAL 1543.41 27559.35 10790.75 8819.00 2425.52
U.P. Sub-Region (Rs. in lakh)
S.NO. NAME OF THE SCHEME AREA ESTIMATED LOAN LOAN EXPENDITURE (in Acre) cost sanctioned Released incurred
-
BULANDSHAHR-KHURJA DEVELOPMENT AUTHORITY
31. Office Cum Commercial 19.50 112.00 56.00 56.00 55.84
Scheme, Bulandshahr
32. Yamuna (Ph.II), Resdl. 116.61 2295.64 787.00 690.00 345.94
Scheme, Bulandshahr
33. Transport Nagar 83.73 1500.53 1091.40 463.00
Scheme, Bulandshahr
34. Kalandi Kunj Resdl. 130.42 3312.79 2433.78 1300.00
Scheme, Khurja
35. Lal Talab Commercial 1.00 48.78 36.58 36.58 14.75
Scheme, Bulandshahr
36. Commercial Complex Harish 1.00 55.00 40.80 40.80
Chandra Vikas Kendra
Bulandshahr
37. Jewar Road, Housing 25.00 490.92 50.00 50.00 10.00
Scheme, Khurja
Sub Total 377.26 7815.66 4495.56 2636.38 426.53
NAGAR NIGAM, MEERUT
38. Improvement of 785.45 589.12 375.00 0.00
network in Meerut
39. Improvement of 212.46 159.35 75.00 0.00
drainage network
40. Improvement of 494.83 371.13 272.47 0.00
water supply
41. Sewerage Rehabilitation 477.49 358.11 223.38 0.00
Scheme
-
Sub Total 1970.23 1477.71 945.85 0.00
NAGAR PALIKA MODI NAGAR
42. Infrastructure Improvement 335.60 251.70 125.85 0.00
Scheme
Grand Total 11422.22 117290.75 63188.50 30408.56 22873.04
COUNTER MAGNET AREAS
1. Gwalior 2470.00 4000.00 3100.00 1174.00 124.00
2. Patiala 180.55 1878.00 100.00 100.00 440.00
3. Kota 390.36 3571.00 200.00 200.00 655.00
4. Barielly 4765.35 33931.00 2000.00 2000.00 3477.00
5. Hisar 0.00 0.00 0.00 0.00 0.00
-
Total 7806.16 43380.00 5400.00 3474.00 4696.00