Question : National Highway Projects

(a) the details of the on-going/pending National Highway (NH) projects in the country along with the funds allocated, released and utilised for the purpose during each of the last three years and the current year, state/ UT-wise;

(b) whether the Government is aware that the construction works of Golden Quadrilateral Highway Project and other NHs are progressing at a very slow pace and if so, the details thereof along with the reasons therefor;

(c) whether a large number of these projects are facing huge cost overrun and if so, the details thereof along with the measures being taken by the Government to complete the said projects in a stipulated timeframe;

(d) whether the highway construction works are being completed within the scheduled time frame by the contractors and if not, the action taken/being taken against them;

(e) the length of NHs constructed during the said period in the country, State/UT-wise particularly in Bihar;

(f) the details of State Highways converted into NHs in the State of Bihar during the said period; and

(g) the steps taken by the Government to monitor and check the construction quality and maintenance work of NHs?

Answer given by the minister

THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS

(SHRI NITIN JAIRAM GADKARI)


(a) The State-wise details of the ongoing projects and the funds allocated and utilised during the last three years and current year are given at Annexure I and II respectively.
(b) to(d) Construction work on Golden Quadrilateral has already been completed, however 566 projects are behind their completion schedule. These projects are delayed mainly due to land acquisition, utility shifting, non-availability of soil/aggregate, poorperformance of contractors, environment/forest/wildlife clearances, ROB & RUB issues with Railways, public agitation for additional facilities, arbitration/contractual disputes with contractors etc. Delay in completion leads to cost overrun in some projects. To fast-track these projects, various steps such as streamlining of land acquisition &environment clearances, premium re-scheduling, close coordination with other Ministries, revamping of dispute resolution mechanism, frequent review meetings with project developers, State Government and contractors at various levels etc. have been taken up. If delay in projects is attributed to contractor, action is taken against them as per the contract provisions.

(e) Details for the length of NHs constructed in the country including Bihar during the last three years and current year are given at Annexure-III.

(f) Details are given at the annexure-IV.

(g) Various steps are taken by the Government to monitor and check the construction quality of NHs.All National Highways are constructed as per quality standards specified in Ministry of Road Transport and Highways/ Indian Roads Congress (IRC) specifications. The contractor/ Concessionaire has to prepare a Quality Assurance Plan in consultation with Authority’s Engineer (AE)/ Independent Engineer (IE). The tests on various materials at the specified frequencies have to be conducted by the contractor. The AE/IE has also to conduct certain tests at their level to ensure the quality of the works. The Officers of the Authority also inspect the works and there are provision of engagement of external technical audit to conduct the quality check of works. The Maintenance of stretches of NHs, where either Development works have commenced or Operation, Maintenance and Transfer (OMT) Concessions/ Operation and Maintenance (O&M) Contracts have been awarded, are the responsibility of the concerned Concessioners/ Contractors till the Concession Period/ the Defect Liability Period (DLP).Maintenance of balance stretches of NHs, including restoration of damages due to floods, rainfalls, etc., on such stretches, are carried out annually as per available budgetary outlay, inter-se priority and traffic density to keep such NHs in traffic worthy conditions.


Annexure-I
ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHAUNSTARRED QUESTION NO. 815 FOR ANSWER ON 21.11.2019 ASKED BY DR. VIRENDRA KUMAR, SHRI MANSUKHBHAI, DHANJIBHAI VASAVA AND SHRI JANARDAN SINGH SIGRIWALREGARDING NATIONAL HIGHWAY PROJECTS.

Details of the ongoing projects for construction and development of the National Highways
S. No. State Ongoing Works
No. Length (Km) Cost (Cr.)
1 Bihar 47 943.24 9479.58
2 Jharkhand 32 496.28 1279.07
3 Uttar Pradesh 27 834.91 6853.22
4 Uttarakhand 40 494.07 4323.72
5 Haryana 10 66.26 935.05
6 Jammu & Kashmir 7 69.46 144.66
7 Punjab 30 529.72 5875.44
8 Himachal Pradesh 28 205.66 899.00
9 Rajasthan 27 683.47 4146.32
10 Andhra Pradesh 42 1067.59 9551.78
11 Kerala 17 387.14 1388.06
12 Odisha 21 912.86 2960.90
13 Puducherry 2 0.00 38.89
14 Tamil Nadu 32 364.64 1528.92
15 Telangana 28 916.30 6672.00
16 Chhattisgarh 51 1965.28 8800.95
17 Goa 16 97.41 5450.15
18 Karnataka 52 1181.00 7080.85
19 Maharashtra 158 6265.87 56081.83
20 Madhya Pradesh 37 1656.12 10400.62
21 Gujarat 20 362.39 3460.00
22 West Bengal 31 408.59 4991.22
23 Arunachal Pradesh 5 326.99 2723.02
24 Assam 30 746.62 3034.68
25 Manipur 9 148.12 749.61
26 Meghayala 5 0.00 81.17
27 Mizoram 9 329.61 2298.07
28 Nagaland 4 65.48 893.90
29 Sikkim 3 88.00 712.96
30 Tripura 2 25.00 176.43
31 BRO 24 418.07 3112.66
33 NHIDCL 114 2477.93 49562.99
34 NHAI 447 25482.00 356862.00
Total 1407 50016.06 572549.72



Annexure-II
ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 815 FOR ANSWER ON 21.11.2019 ASKED BY DR. VIRENDRA KUMAR, SHRI MANSUKHBHAI, DHANJIBHAI VASAVA AND SHRI JANARDAN SINGH SIGRIWAL REGARDING NATIONAL HIGHWAY PROJECTS

The State/UT-wise details of funds allocated/utilized for development of NHs during each of the last three years and current year
Amount in Rs. crore
Sl. No. States / UTs / Schemes / Agency 2016-17 2017-18 2018-19 2019-20
Alloc. Expd. Alloc. Expd. Alloc. Expd. Alloc. Expd.*
1 Andhra Pradesh 2,010 2,015 1,781 1,781 2,260 2,054 1,739 1,257
2 Arunachal Pradesh 100 91 62 62 90 89 70 37
3 Assam 177 138 308 308 414 421 390 0
4 Bihar 1,363 1,332 1,690 1,524 1,598 1,554 1,795 924
5 Chhattisgarh 1,553 1,496 1,108 1,072 1,831 2,345 700 330
6 Goa 400 435 527 527 940 973 997 578
7 Gujarat 252 213 166 163 392 390 457 289
8 Haryana 150 161 105 105 330 375 103 69
9 Himachal Pradesh 211 182 307 306 351 328 155 41
10 Jammu & Kashmir 40 23 35 35 45 44 46 8
11 Jharkhand 200 213 261 261 320 320 143 110
12 Karnataka 784 872 1,241 1,203 1,630 1,561 1,271 778
13 Kerala 260 238 172 172 280 301 263 212
14 Madhya Pradesh 1,760 1,559 855 855 1,665 884 2,185 1,511
15 Maharashtra 1,372 1,154 2,966 2,964 7,051 7,445 9,718 6,885
16 Manipur 25 19 76 75 260 260 300 0
17 Meghalaya 41 28 30 28 71 58 55 10
18 Mizoram 40 46 41 41 80 80 120 48
19 Nagaland 50 39 38 38 200 200 405 194
20 Odisha 926 951 708 717 790 774 410 281
21 Punjab 2,741 2,702 746 746 786 808 798 482
22 Rajasthan 965 1,013 888 886 1,296 1,290 887 548
23 Sikkim 0 0 5 5 1 0 0 0
24 Tamil Nadu 575 640 664 664 870 884 478 248
25 Telangana 380 358 410 410 1,220 1,213 1,398 935
26 Tripura 5 2 61 61 50 50 65 32
27 Uttar Pradesh 1,849 1,821 1,111 1,107 2,040 1,996 1,695 1,126
28 Uttarakhand 333 314 981 980 1,000 1,011 878 606
29 West Bengal 1,334 1,223 1,230 1,185 991 980 748 553
30 Andaman & Nicobar Islands 0 0 0 0 0 0 0 0
31 Chandigarh 2 1 5 5 2 1 5 0
32 Delhi 1 1 36 23 3 0 3 0
33 Puducherry 20 14 14 14 30 13 2 1
34 Other projects under NH(O)* 781 780 214 212 3 2 4 5
35 National Highways Authority of India (NHAI)- Cess* 2,327 2,327 12,429 12,429 11,569 11,569 11,091 5,782
36 NHAI- Toll 7,500 7,500 8,462 8,462 9,570 9,570 10,600 7,950
37 NHAI- NH(O) 5,389 5,389 3,900 3,900 0 0 1,000 1,000
38 NHAI-TOT 9,682 9,682 10,000 0
39 National Highways & Infrastructure Development Corporation Ltd. (NHIDCL) under NH(O)* 72 72 296 296 1,000 1,000 1,650 1,650
40 Border Roads Organization (BRO)* 0 0 0 0 135 135 350 180
41 Special Accelerated Road Development Programme for North-East Region (SARDP-NE) including Arunachal Package* 4,520 4,465 4,865 4,838 5,610 5,345 5,370 538
42 Special Programme for development of Roads In Left Wing Extremism affected Area (LWE) including Development of Vijayawada-Ranchi Road 760 739 1,050 902 905 552 950 191
43 Externally Aided Projects - Head Quarters#, NHAI, NHIDCL 59 57 316 283 222 219 900 607
Total (Budget) 41,327 40,623 50,160 49,645 67,583 66,776 70,194 35,994
44 IEBR / Borrowings by NHAI 59,279 33,118 59,279 50,533 62,000 61,217 75,000 26,185
Total (Budget + IEBR) 1,00,606 73,741 1,09,439 1,00,178 1,29,583 1,27,993 1,45,194 62,179
*Expd. Upto September, 2019


Annexure-III
ANNEXURE REFERRED TO IN REPLY TO PART (e) OF LOK SABHA UNSTARRED QUESTION NO. 815 FOR ANSWER ON 21.11.2019 ASKED BY DR. VIRENDRA KUMAR, SHRI MANSUKHBHAI, DHANJIBHAI VASAVA AND SHRI JANARDAN SINGH SIGRIWAL REGARDING NATIONAL HIGHWAY PROJECTS

State-wise details of National Highwaysconstructed during last three years and current year across the country:

S No State / UT Length Constructed (in km)
2016-17 2017-18 2018-19 Upto Sept. ‘19
1 Andhra Pradesh 402 459 438 307
2 Arunachal Pradesh 174 188 157 16
3 Assam 165 302 323 32
4 Bihar 400 370 333 89
5 Chandigarh 0 0 0 0
6 Chhattisgarh 483 522 397 114
7 Delhi 0 139 42 22
8 Goa 4 20 11 17
9 Gujarat 86 189 303 84
10 Haryana 369 290 226 96
11 Himachal Pradesh 72 134 157 34
12 Jammu & Kashmir 33 162 95 25
13 Jharkhand 211 236 287 88
14 Karnataka 656 768 779 238
15 Kerala 45 17 121 75
16 Madhya Pradesh 475 594 829 356
17 Maharashtra 750 1,345 2,293 1318
18 Manipur 4 231 318 56
19 Meghalaya 6 48 13 0
20 Mizoram 88 43 59 8
21 Nagaland 4 0 34 11
22 Odisha 490 535 534 134
23 Puducherry 8 17 12 0
24 Punjab 384 357 209 130
25 Rajasthan 1,125 1,075 728 449
26 Sikkim 0 45 83 4
27 Tamil Nadu 469 307 356 123
28 Telangana 113 161 370 219
29 Tripura 42 82 41 0
30 Uttar Pradesh 584 694 882 340
31 Uttarakhand 203 256 237 178
32 West Bengal 386 222 127 54
33 A&N Islands 0 21 61 5
Total 8231 9829 10855 4622

Annexure-IV
ANNEXURE REFERRED TO IN REPLY TO PART (f) OF LOK SABHA UNSTARRED QUESTION NO. 815 FOR ANSWER ON 21.11.2019 ASKED BY DR. VIRENDRA KUMAR, SHRI MANSUKHBHAI, DHANJIBHAI VASAVA AND SHRI JANARDAN SINGH SIGRIWAL REGARDING NATIONAL HIGHWAY PROJECTS

Length of new NHs declared in the State of Bihar during the last three years and current year in km is as follows:
State 2016-17 2017-18 2018-19
Bihar 0.00 17.50 480.59

*****