THE MINISTER OF STATE IN THE MINISTRY OF POWER
( SHRI K.C. VENUGOPAL )
(a) : Yes, Madam.
(b) : As per the Load Generation Balance Report (LGBR) for 2011-12
prepared by CEA, energy shortage and peak shortage in the country have been
assessed as 10.3% and 12.9% respectively.
(c) & (d) : Government has taken a number of steps to mitigate shortage of
power in the country, which include (i) acceleration in generating capacity
addition, (ii) rigorous monitoring of on-going generation projects, (iii)
coordinated operation and maintenance of hydro, thermal and nuclear and gas
based power stations to optimally utilize the existing generating capacity, (iv)
strengthening of inter-state and inter-regional transmission capacity for
optimum utilization of available power etc. Projects aggregating 40,781 MW
have already been commissioned during the 11th Plan upto 18th August, 2011
and balance capacity is under execution. The energy and peaking shortage
during April to July, 2011 reduced to 6.2% and 9.9% from 11.1% and 13.8% in
April to July, 2010 respectively.