THE MINISTER OF STATE IN THE MINISTRY OF URBAN DEVELOPMENT
(SHRI SAUGATA ROY)
(a): Details are given in the enclosed Annexure.
(b): CVO, CPWD is not responsible for checking of quality of the works.
The quality of works is checked by various quality assurance units of CPWD
at different levels.
(c)&(d): Do not arise in view of (b) above.
(e); The mechanism in place to check the quality of major works is prescribed
in CPWD Works Manual 2010. As per the provision of the Manual in this regard,
the direct responsibility for ensuring proper quality of work as per approved
specification of achieving the intended performance and structural, functional
and aesthetic parameters and desired life of building/installation/structure
rests with the construction team of Executive Engineer, Assistant Engineer and
Junior Engineer. The Superintending Engineer has overall responsibility for
management of quality, system and procedure for the work under his charge. The
Chief Engineer shall periodically review and monitor the quality assurance set up.
Besides this, CPWD has independent Quality Assurance set up to keep a watch on
the quality control measures at sites and also to provide guidance to field engineers:-
(i) Quality-Assurance Wings in each Region under the
Additional Director General of the Region.
(ii) Core wing at the Directorate under the Chief Engineer
(Contract, Manual & Specification & Quality Assurance)