THE MINISTER OF WATER RESOURCES (SHRI ARJUN CHARAN SETHI)
(a) to (c) Yes, Sir.
(d) Details of the Report and action thereon are given
in the annexure.
DETAILS OF THE REPORT SUBMITTED BY WAPCOS (I) LTD. AND THE ACTION TAKEN THEREON
Main recommendations of M/S WAPCOS (I) Ltd. in its report to tackle the problem are
as under:-
1. Construction of additional outfall structures between railway line & Ash Dyke; on the northern side of ash dyke and; Trimohini Nallah out fall.
2. Augmentation of existing drainage around Ash Dykes
3. Relocation of existing ash slurry pipe bridge
4. Regulation of flow from Farakka Barrage to Feeder Canal during floods
5. Clearing the obstruction created by the abandoned railway embankment
6. Adequate protection measures as identified in the report.
Implementation of the above recommendations requires
action by multiple agencies like Farakka Barrage Project
Authority (FBPA), Eastern Railways, State Irrigation
Department/Central Water Commission, etc. NTPC has
taken up the matter of increasing drainage points with
FBPA.