(a) whether certain very costly equipments are lying idle for a long period
in the Regional Institute of Medical Sciences (RIMS), Imphal;
(b) if so, the reasons thereof; and
(c) the corrective measures taken by the Government in this regard?
(a) whether certain very costly equipments are lying idle for a long period
in the Regional Institute of Medical Sciences (RIMS), Imphal;
(b) if so, the reasons thereof; and
(c) the corrective measures taken by the Government in this regard?
THE MINISTER OF HEALTH & FAMILY WELFARE (SHRI GHULAM NABI AZAD)
(a): Yes, one Theratron Equinox 100 Cobalt Therapy Unit costing Rs.2.10 crores
for the Regional Career Centre(RCC) in the Department of Radiotherapy, RIMS, Imphal
imported from Canda arrived in the Department in July, 2008 is not yet used.
(b): The equipment is not yet used because the room for housing the equipment is
under construction. The room is constructed after the drawings were approved by
the Bhabha Atomic Research Centre(BARC), Mumbai. Construction started, the drawing
of the structure was modified as per directive of Atomic Energy Regulatory Board(AERB),
Mumbai and their approval of the modified drawing was obtained in February, 2009.
Construction works were disrupted for about 8 months in the year 2010 owing to
non-availability of construction material arising from closure of National Highways
during economic blockade in the State of Manipur. The room is likely to be completed
within 3 months time. Further , the machine is not operational because of want of
Telecobalt Source which is to be imported after getting clearance from the AERB,
Mumbai. AERB has pointed out that adequate number of staff in the Radiotherapy
Department , RIMS, Imphal should be available at the time of re-submission of
fresh application for obtaining authorization for procurement of Telecobalt Source
vide their letter dated 11th December,2009.
(c) The equipment was procured from the funds provided for the Regional Cancer
Centre. No fund for manpower is provided under the Scheme.Creation of the required
posts of specialists and technicians of the Institute for manning the equipment
in the RCC has been initiated after a proposal was placed in the Standing Finance
Committee(SFC) meeting. The meeting of the SFC, RIMS, Imphal could not be held for
a long time, it could be held only on 16th Nov.,2010 after a gap of more than one
and half year.