MINISTER OF PARLIAMENTARY AFFAIRS, COAL AND MINES
(SHRI PRALHAD JOSHI)
(a):Separate grade wise demand for coal is not estimated in the country. However, the total actual demand / supply of coal for 2019-20 was 955.26 Million Tonnes (Provisional).
(b):Grade-wiseannual production of coalin different coal companies during the last three years is given atAnnexure.
(c): All India raw coal production target set and achievement during last three years is given below:
Year Production (in Million Tonnes)
2017-18 2018-19 2019-20 (Prov)
Target Actual Target Actual Target Actual
All India Production 730.10 675.41 730.00 728.72 810.00 730.87
-2-
(d): Details of Country-wise coal import during last three years is given below:-
Country (Quantity in Million Tonnes& Value in Million Rs.)
2017-18 2018-19 2019-20
Quantity Value Quantity Value Quantity Value
Australia 46.12 538244 48.17 615425 46.72 510170
Canada 3.56 42691 4.46 64211 4.69 57584
China PRP 0.23 3934 0.05 1705 0.21 3832
Indonesia 95.81 400992 112.88 504328 116.66 460849
Mozambique 5.91 48685 7.09 60010 5.48 40273
New Zealand 0.60 7543 0.50 5889 0.41 4377
Russia 4.30 33991 4.92 47382 8.23 60492
South Africa 38.49 197042 31.15 189505 42.48 212693
U S A 12.03 103550 14.98 137460 12.16 97484
Others 1.18 8097 11.15 83290 11.50 79568
Grand Total 208.25 1384770 235.35 1709205 248.54 1527321
Information on grade-wise import of coal is not available.
(e): The focus of the Government is on increasing domestic production of coal through allocation of more coal blocks, pursuing with State Government for assistance in land acquisition and coordinated efforts with Railways for movement of coal.
In order to enhance domestic production, 25% of coal production has been allowed for sale of coal for newly allocated captive coal blocks.
Commercial mining, with a provision for 100% foreign direct investment, has been allowed by the Government.
In order to enhance coal production, Coal India Limited (CIL) has taken the following steps:
• Implementing on-going projects in time bound manner to achieve targeted production as per schedule.
• 15 Greenfield Projects identified with a Capacity of about 160 Mty to be operated by Mine Developer cum Operator mode.
• Manual loading method eliminated in all underground mines of CIL (except one mine of CCL) by introducing Side Discharge Loader (SDL)/ Load Haul Dump (LHD) loading in conjunction with belt conveyors.
• Introduction of Surface Miners in opencast mines to improve operational efficiency and cater to environmental needs.
• Introduction of Mass Production Technology in underground coal mines.
***
Annexure of LSUQ no. 4697 for 24.3.2021
Annual production of the different grades of coal during the last three years (Fig in Million Tonne)
Coal India Limited Singareni Collieries Co. Ltd. Others All India
Grade 2017-18 2018-19 2019-20 2017-18 2018-19 2019-20 2017-18 2018-19 2019-20 2017-18 2018-19 2019-20(Provisional)
Steel-I 0.16 0.04 0.02 0.00 0.00 0.00 0.16 0.04 0.02
Steel-II 0.05 0.00 0.13 0.00 0.00 0.00 0.05 0.00 0.13
SC 0.18 0.25 0.25 0.00 0.00 0.00 0.18 0.25 0.25
Wash-I 0.18 0.06 0.03 0.00 0.00 0.10 0.18 0.06 0.14
Wash-II 4.36 3.89 1.86 0.19 0.45 0.44 4.55 4.34 2.30
Wash-III 3.50 5.77 6.40 0.49 0.81 0.96 3.99 6.58 7.36
Wash-IV 24.85 24.14 26.70 6.19 5.74 5.01 31.04 29.87 31.70
Wash-V 10.99 0.00 0.00 0.00 0.00 0.00 10.99
Wash-VI 0.05 0.00 0.00 0.00 0.00 0.00 0.05
SLVI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Coking 33.28 34.14 46.43 0.00 0.00 0.00 6.87 6.99 6.51 40.15 41.13 52.94
G1 0.18 0.09 0.02 1.53 0.00 0.00 1.71 0.09 0.02
G2 0.26 0.48 0.29 0.00 0.00 0.00 0.26 0.48 0.29
G3 3.51 3.31 3.23 0.00 0.00 0.00 3.51 3.31 3.23
G4 14.34 15.39 14.47 0.20 0.15 0.00 14.54 15.55 14.47
G5 13.64 11.72 13.83 1.09 0.74 0.68 0.00 0.00 0.12 14.73 12.45 14.63
G6 10.69 6.96 4.51 0.00 0.00 0.04 0.18 0.94 0.00 10.87 7.90 4.55
G7 32.25 38.21 35.54 3.23 2.50 3.56 1.34 0.64 1.84 36.82 41.35 40.95
G8 35.42 46.28 37.53 5.23 6.48 4.92 0.33 1.66 3.10 40.98 54.42 45.55
G9 16.65 20.83 22.24 8.22 7.73 6.21 2.68 7.03 9.42 27.55 35.60 37.87
G10 73.40 68.75 61.93 8.99 6.69 6.51 9.10 8.79 9.84 91.48 84.23 78.29
G11 142.03 157.47 157.62 15.48 14.35 11.73 22.47 27.88 24.46 179.98 199.71 193.81
G12 51.98 63.14 66.93 0.39 2.16 3.58 1.05 1.00 1.14 53.42 66.30 71.65
G13 89.79 95.34 67.62 11.95 15.37 16.72 0.00 0.50 2.24 101.74 111.21 86.58
G14 41.52 37.49 54.63 2.85 3.55 3.17 0.27 0.00 1.17 44.64 41.04 58.96
G15 4.60 3.07 12.54 3.30 3.81 5.06 0.00 0.00 0.00 7.89 6.89 17.60
G16 2.65 3.15 2.02 0.89 0.70 1.55 0.00 0.00 0.46 3.54 3.85 4.03
G17 1.18 1.06 0.75 0.27 0.21 0.13 0.01 1.84 4.39 1.47 3.11 5.27
UNG 0.00 0.00 0.00 0.13 0.13 0.18 0.00 0.00 0.01 0.13 0.13 0.19
Total N Coking 534.09 572.74 555.70 62.01 64.40 64.04 39.15 50.44 58.19 635.25 687.59 677.94
Total 567.37 606.89 602.13 62.01 64.40 64.04 46.02 57.43 64.70 675.40 728.72 730.87