THE MINISTER OF POWER ( SHRI P.M. SAYEED )
(a) to (f): A Statement is laid on the Table of the House.
STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (t) OF STARRED QUESTION NO.ll0 TO BE ANSWERED IN THE LOK SABRA ON 13.07.2004 REGARDING GRAM URJA PARIYOJANA.
(a) to (f): According to the National Common Minimum Programme household electrification is to be completed
in five years including North-Eastern States.
For achieving this target, a rural electrification strategy has been drawn up, which envisages:
(i) Creation of Rural Electricity Distribution Backbone (REDB) of 33/11 KV substations, with at least one such substation in each block appropriately networked and linked to the State transmission system.
(ii) Creation of Village Electricity Infrastructure (VEl) by providing Distribution Transformer( s) with at least one such transfonner in every village.
(iii) Rural Household Electrification of unelectrified households from village distribution transfonner( s).
(iv) Decentralized distributed generation system for such villages where grid connectivity is either not feasible or not cost effective.
Based on the above strategy, details of the scheme and requirement of funds are being worked out.