Question : CENTRAL NON-LAPSABLE POOL



(a) the details of projects taken up by the Government under the Central Non- Lapsable Pool of Resources in the North-Eastern region during 1999-2000 and 2000- 2001, projects-wise; and

(b) the amount sanctioned and disbursed thereunder, as on date, State-wise, scheme-wise?

Answer given by the minister


THE MINISTER OF STATE IN THE MINISTRY OF HOME AFFAIRS (I.D. SW AMI)

(a)&(b): As per the statement annexed.

Statement referred to, in reply to Question No.4632.

Amount Recommended for sanction, and released, from the Non-lapsable Pool of Resources

Arunachal Pradesh

(Rs. in crores)
Sl.No. Name of the Project 1999-2000 2000-2001 Sanctioned Released Sanctioned Released
1. Infrastructure Development of 275 community schools having pre-primary classes in villages 2.91 2.91

2. Ranganadi Transmission

3. Itanagar-Naharlagun Water Supply 1.00

4. Water Supply Scheme at Along 1.50

5. Kathalguri-Deomali 220 KV Transmission Line 3.00 3.00 6. Rama Krishna Mission School at Along 1.28 1.28

7 Flood Control Schemes(8 Nos.) 10.00 10.00

8. Flood Control & Anti-erosion works (6 Nos.) 7.65 7.65

9. Special Restoration of Water Supply facilities at Tezu 1.00 1.00 10. Maintenance of Foot tracks and suspension bridges 1.00 1.00 11. North Eastern Regional Institute of Science and Technology 10.00 12. Hostel Buildings for 110 primary and middle schools 11.00 11.00 13. Ram Krishna Mission Hospital, Itanagar 0.50 0.50 14. Sub-transmission & Distribution works
i) 2x5 MVA S/s at Naharlagun - - 1.20 1.00
ii) 2x3.15 MVA S/s at Nirjuli - - 1.50 1.20
iii) 33 KV D/C line Nirjuli to Itanagar - - 1.00 1.50
Total 19.65 8.65 34.89 34.89
Assam
1. Minor Irrigation Schemes 5.00 5.00

2. Flood Control Management Schemes/different locations of Brahmaputra and Barak Valley (25 Nos.) 5.00 5.00

3. Sankaradeva Netralaya 1.00 1.00 1.00

4.Project to bridge the infrastructure gaps in Forestry 10.00

5. Installation of one lakh shallow tubewells 10.00 10.00 20.00 20.00 6. Guwahati Medical College 8.00 8.00

7 IIT, Guwahati 34.00

8. Assam University 10.00

9. Tezpur University 10.00 10. Diphu campus of Assam University 3.00 11. Creation of New Infrastructure at Cotton College 3.00 3.00 12. Road Schemes for N.C. Hill Autonomous Council, Halflong. 5.00 5.00 13. Road from Jarighat to Lakhichherra 0.92 0.92 14. Road from Hatichherra-Dudpatil-Mudarnamukh 0.43 0.43 15. Centre for Plasma Physics, Guwhati. 1.51 16. Drinking Water Supply Scheme, Gossaigaon Town 1.00 17. Sub-transmission & Distribution works

(i) Construction of 33 KV, 30 Kms. D/c Line from Chandrapur to Narengi 2.00 1.00

(ii) (a) Construction of 11/0.4 KV Distribution S/s, 11 KV lines and LT Lines. 1.00 6.00 (b) Lt Lines - 100 Kms. 2.00 1.00 (c) 11/0.4 KV S/s (500 KVA-10 nos, 250 KVA-100 nos, 100 KVA-100 nos and 63 KVA-50 nos. 1.00 6.00
Total 106.86 37.35 31.00 31.00
Manipur
1. Leimakhong Heavy Fuel Based Power Project 86.00 86.00 16.0 16.0

2. Infrastructure for National Games 66.00 16.00

3. Augmentation of Water Supply for Imphal city Phase-I(29.5 MLD) 5.00 5.00

4. Installation of 2x5 MVA 33 KV Sub-Station at Moreh Town 1.00 1.00

5. ACA for BMS 16.00 16.00 6. Senapati Phaibung Road (50kms) 5.00 5.00

7 Construction of two classroom school building for 205 schools without buildings 0.80 0.80

8. Extension of two classrooms for 172 State Government Secondary Schools 4.30 4.30

9. Extension of two classroom for the State Government Secondary Schools including 21 newly upgraded Higher Secondary Schools 1.07 1.07 10. University and 60 Affiliated Colleges from Manipur(State) 2.50 2.50 11. Sub-transmission & Distribution works

(i) 33 Kv D/c line from Yurembam to Mongsangei 0.72 1.49

(ii) 33/11 KVS/s 2x1 MVA S/s at Saikul 0.72 1.49
Total 187.67 121.67 34.21 18.21
Meghalaya
1. Greater Shillong Water Supply Scheme 3.00 3.00

2. Sub-transmission & Distribution works

(i) Improvement of power supply in Shillong city. 4.00 6.00

(ii) Improvement of power supply in Tura town. 4.00 6.00

3. Construction of Baljek Airport, Tura 3.18 3.18

4. Primary School Building 7.20

5. Upper Primary School Building 4.00
Total 3.00 3.00 24.38 13.18
Mizoram
1. Aizawl(Ph-II) Water Supply scheme 20.00

2. State Referral Hospital 10.00 10.00

3. Mobilisation and Development of feed and fodder resources 1.00 1.00

4. Integrated Piggery Development Project 1.00 1.00

5. Establishment of Fish seed farms at Zawlnuam, Zobawk, Lengpui, Phura 2.00 2.00 6. Marketing Facilities and Marketing and tung seeds and oils of Mizoram in National and Abroad 0.50 0.50

7 North Eastern Hill University 7.74

8. ACA for BMS 14.91 14.91

9. Construction of Market Buildings
5.00

5.00 10. Greater Champhai water Supply Scheme

5.00

5.00

11. Construction and Renovation of School Buildings. 10.72 10.72 12. Sub-transmission & Distribution works

(i) Improvement of sub-transmission and distribution network at Aizawl town. 10.00 10.00
Total 62.15 34.41 25.72 25.72
Nagaland
1. Hospital at Kohima 4.00 4.00

2. Likimro HEP 9.00 9.00

4. Nagaland university 4.03

5. Augmentation of Water Supply to Dimapur 3.43 2.00 6. Railway over bridge at Dimapur 3.50 3.50

7 Changtongya-Longieng Road (23 Kms.) 3.00 3.00

8. Dimapur Nuiland Road 1.50 1.50

9. Construction of Road to Dimapur District HQs at Chumukedima 1.00 1.00 10. Construction of School Buildings 16.12 16.12 11. Improvement of Science Education 1.12 1.12 12. Computerisation & Computer Education in School 0.81 0.81 13. Augmentation of Water Supply to Dimapur Town and Extended Colonies 1.43 1.43 14. Sub-transmission & distribution works

(i) Strengthening of Sub-transmission and distribution system (System Improvement in Dimapur) 6.63 6.63
Total 44.08 40.05 11.49 10.06
Sikkim
1. Rural Water Supply Schemes 3.50

2. Major Overhauling 2x6 MW 3.00 3.00

3. Hydel Generation Station at Lower Lagyap Hydel Project 3.00

4. Flood control surface drainage Anti-erosion work 2.50 2.50 2.50 2.50

5. Carpeting Standard WBM Road (9 Nos.) 5.21 5.21 6. Construction of New Roads (28 Nos.) 4.80 4.80

7 Ropeway from Deoralli to Tastling 0.50 0.50

8. Centre for Computers and Communications Tech. Polytechnic 3.50 3.50

9. Anti-landslide and anti-erosion works 10.00 10.00 10. Construction of School buildings 11.71 11.71 11. Four Affiliated College 2.50 2.50 12. Ropeway from Deorali to Taslking 1.57 1.57 13. Sub-transmission & distribution works

(i) Augmentation of S/s capcity at Tadong by 1x5 MVA, 66/11 KV transformer for Referral Hospital 0.50 1.00

(ii) Power Supply to VIP complex at Gangtok 0.50 1.00
Total 36.01 28.51 19.78 19.78
TRIPURA
1. Transmission Schemes 5.00 5.00 6.85

2. 1x21 MV Gas Thermal Project(Extension), Rokhia(Phase.II) 5.00

3. Development of Tripura University 2.50 2.50

4. New Capital Complex at Agartala 10.00 10.00

5. Sub-transmission & distribution works
(i) 33 KV S/s New : 62.6 MVA Augmentation 5 MVA 5.41 2.55
(ii) 33 KV Lines : New : (191 Ckt Kms) 5.41 2.55
6. 1x21 MW Gas Thermal Project (Ext) at Rokhia (Ph-I) 5.00 5.00 9.00 Total 27.50 22.50 23.81 7.96