MINISTER OF STATE FOR ROAD TRANSPORT AND HIGHWAYS(INDEPENDENT CHARGE)(MAJOR GENERAL (RETD.) B.C. KHANDURI, AVSM)
(a) Yes, Sir. Agreements have been signed with World Bank for improvement of NH-2
(b) Loan agreements for widening and strengthening of National Highway-2 for US$516 million under Third National Highway Project(TNHP) and US$589 million under Grand Trunk Road Improvement Project (GTRIP) have been signed with World Bank.
(c) Yes, Sir.
(d) & (e) The details are at Annex-I & II. The time of completion varies from 36 to 42 months.
(f) Widening of existing 2-lane to 4-lane and strengthening of the existing road would improve the quality of National Highway-2.
(g) US$83 million under TNHP and US$67 million under GTRIP are proposed to be utilised during the year 2001-2002.
ANNEX-I REFERRED TO IN REPLY TO PART (d) and (e) OF LOK SABHA UNSTARRED QUESTED NO. 2505 TO BE ANSWERED ON 5.12.2001 ASKED BY SHRI RAVINDRA KUMAR PANDEY REGARDING LEVELLING OF NH-2.
World Bank Projects (TNHP) under implementation in Uttar Pradesh on NH-2
Stretch/Chainages/
Packages
Length in Km
Estimated cost of civil work (Rs. in crores)
Awarded cost to contractor (Rs. in crores)
Date of Commence-
ment
Date of
completion
Contractor/Nationality
Supervision
Consultant
Sikandra-Bhaunti
Km.393-Km.470
Package II-A
62
323.6
289.3
23.2.2001
23.8.2004
M/s ITD-Som Dutt
Builders (JV)
Thailand-India
BCEOM,
French
Fatehpur-Khaga
Km.38-Km.115
Package II-C
77
372.4
295.53
12.3.2001
12.7.2004
M/s Centroodorstroy,
Russia
BCEOM,
French
Khaga-Kokhraj
Km.115-Km.158
Package III-A
43
151.7
179.85
10.2.2001
10.2.2004
M/s IRCON
International Ltd.,
India
Meinhardt
(Singapore)
Pte. Ltd.,
Singaapore
Handia-Varanasi
Km.245-Km.317
Package III-C
72
286.00
265.38
12.3.2001
12.7.2004
M/s Centrodorstroy,
Russia
Meinhardt
(Singapore)
Pte. Ltd.,
Singaapore
Mohania-Sasaram
Km.65-Km.110
Package-IVB
45
230.55
229.96
10.2.2001
10.2.2004
M/s LG Engineering & Construction
Corporation, Korea
ICT Pvt. Ltd.,
India
Dehri-on-Sone-
Aurangabad
Km.140-Km.180
Package-IVD
40
242.61
217.99
10.2.2001
10.2.2004
M/s Ssangyong, Korea
M/s Oriental SE, India (JV)
ICT Pvt. Ltd.,
India
254
1606.86
1478.01
ANNEX-II REFERRED TO IN REPLY TO PART (d) and (e) OF LOK SABHA UNSTARRED QUESTED NO. 2505 TO BE ANSWERED ON 5.12.2001 ASKED BY SHRI RAVINDRA KUMAR PANDEY REGARDING LEVELLING OF NH-2.
World Bank Projects (GTRIP) on NH-2 to be awarded.
Stretch/Chainages/
Package
Length in Km
Distance from Delhi in Km.
Estimated Project Cost
(Rs. in crores)
Likely
Commencement Date
Likely completion
Date
Status
Agra-Sikohalad
Km.199.66 to Km.250.5
Package-I A
51
249
348.7
January,2002
December,2004
Bids invited to be received on 17.12.2001
Sikohabad-Sarai Ikdil
Km.250.502 to Km.307.5
Package-I B
59
306
252.8
January,2002
December,2004
Bids invited to be received on 17.12.2001
Sarai Ikdil-Bhognipur/Sikandara
Km.321.1 to Km.393.00
Package-I C
73
392
341.7
Janruary,2002
December,2004
Bids invited to be received on 17.12.2001
Bhaunti-Fatehpur Border
Km.470 to Km.483.33 & Km. 0 to Km.38
Package-IIB
51
505
450
January,2002
December,2004
Bids invited to be received on 17.12.2001
Allahabad Bypass-Km.158 to Km. 245
Package-III B
87
712
Project Preparation in progress for Road Projects. Sale of PQ Document for Bridge proper start from 1.12.2001
Varanasi Bypass-Mohania
Km.317 to 328 & Km. 0 to Km. 65
Package-IV A
76
861
435.1
January,2002
December,2004
Bids invited to be received on 17.12.2001
Sasram to Dehri-on-Sone
Km.110 to Km.140
Package-IV C
30
936
222.8
January,2002
December,2004
Bids invited to be received on 17.12.2001
Barachatti to Gorhar
Km.240 to Km.230
Package-V B
80
1116
442.2
January,2002
December,2004
Bids invited to be received on 17.12.2001
507
2493.3