MINISTER OF STATE IN THE MINISTRY OF PETROLEUM & NATURAL GAS (SMT.SUMITRA MAHAJAN)
(a): Yes, Sir.
(b): It was decided that the crude oil produced in the Northeast and PSC crude oil would continue to be allocated on the existing pattern. For other crudes of ONGC, the Ministry of Petroleum and Natural Gas would decide allocation amongst the PSU refineries taking into consideration inter-alia the factors like requirement of refineries on technical considerations, past allocation etc.
(c) and (d): There is sizeable gap between the domestic production of crude oil and the requirement of domestic refineries. During the APM period, many PSU refineries came up taking into consideration domestic crude oil availability. Taking various factors into consideration, it was decided that the system of allocating domestic crude amongst PSU refineries would need to continue for the time being.