MINISTER OF STATE IN THE MINISTRY OF PERSONNEL, PG & PENSIONS AND IN
THE PRIME MINISTERâS OFFICE
(SHRI V. NARAYANASAMY):
(a), (b), (c)
(d), (e) & (f) A Statement is laid on the Table of the House.
STATEMENT LAID ON THE TABLE OF THE LOK SABHA IN REPLY TO (a) TO (f) OF
STARRED QUESTION NO.216 REGARDING `REVIEW OF GSLV PROGRAMME` ASKED BY
SHRI KALIKESH N. SINGH DEO FOR ANSWER ON WEDNESDAY MARCH 28, 2012
(a) Yes, Sir. The launch of GSLV-D3 carrying the GSAT-4
spacecraft on April 15, 2010 was unsuccessful. The primary objective of
the mission was the flight qualification of the indigenous cryogenic stage.
The launch of GSLV-F06 carrying the GSAT-5P spacecraft on December
25, 2010 was unsuccessful. The GSLV-F06 employed the cryogenic stage
imported from Russia.
Two independent Failure Analysis Committees were constituted to
carryout in-depth analysis of the flight data, identify the reasons for
the failure and recommend corrective measures.
(b) The GSLV-D3 Failure Analysis Committee concluded that the
anomalous stoppage of the fuel booster turbo pump of the indigenous cryogenic
stage shortly after the ignition of the cryogenic engine was the cause for
the mission failure.
The GSLV-F06 Failure Analysis Committee concluded that the primary
cause of the failure is the untimely and inadvertent snapping of a group of
ten connectors located at the bottom portion of the Russian Cryogenic Stage.
Based on the recommendations of the Failure Analysis Committees, the
Fuel Booster Turbo Pump and the Lower Shroud of the Indigenous Cryogenic
Stage has been redesigned and qualification test are in progress.
(c) No, Sir. The GSLV programme schedule has been revised
due to the unexpected failures of GSLV-F02 (Russian cryogenic stage) in July
2006; GSLV-D3 (Indigenous cryogenic stage) in April 2010 and GSLV-F06 (Russian
up rated cryogenic stage) in December 2010 and partial success of GSLV-F04
(Russian cryogenic stage) in September 2007. After incorporating the
recommendations of the two failure analysis committees, the next development
flight GSLV-D5 is targeted in the third quarter of 2012.
(d) Does not arise.
(e) Yes, Sir.
(f) ISRO is planning to carry out two developmental flights of
GSLV with the indigenous Cryogenic Stage in order to ensure successful
launch of Chandrayaan-2 in 2014-15 timeframe.