Question : RENEWABLE ENERGY PROJECTS BY PSUS



(a) the details of renewable energy projects set up or proposed to be set up by the Public Sector Enterprises (PSEs) for sustainable development, PSE-wise; and

(b) the details of renewable resources from which energy is being generated by PSEs and the quantum of power generated by them during the last three years and the current year?

Answer given by the minister


THE MINISTER OF STATE OF HEAVY INDUSTRY AND PUBLIC ENTERPRISES
( SHRI P. RADHAKRISHNAN )

(a)& (b): A statement is laid on the Table of the House

Statement referred to in reply to Lok Sabha Unstarred Question No. 54 for answer on 7.7.2014 regarding renewable energy projects by PSEs.

(a) As per available information, details of renewable energy projects set up or proposed to be set up by the Central Public Sector Enterprises (CPSEs) is as follows:

1. The details of Grid – connected Solar Power Projects set up or proposed to be set up the Central Public Sector Enterprises (CPSEs) under Phase I and Phase-II of Jawaharlal Nehru National Solar Mission are as under:-

 Sl.No	Name of the Company	Location	Capacity	Status 
1 Indian Oil Corporation Rajasthan 5 MW Commissioned Limited (IOC) in 2011-12 2 GAIL (India) Limited (GAIL) Rajasthan 5 MW Commissioned in 2012-13

2. Other Solar Power Projects
 Sl.No	Name of the Company	Location	Capacity	Status 1	North Eastern Electric Power	Surajamoninagar	5 MW	Under Installation	Corporation Ltd. (NEEPCO)	,Tripura 2	NEEPCO	Assam	2 MW	Proposed to be set-up 3	NEEPCO	Monarchak	5 MW	Under Construction	Tripura 4	NEEPCO	Madhya Pradesh	50 MW	Future Project 5	NEEPCO	Assam	70 MW	Future ProjectLtd. 6	National Aluminium Company	Bhubaneswar	160 KW	Commissioned	(NALCO) 7	NALCO	Bhubaneswar	100 KW	Under Installation 8	National Fertilizers Ltd. (NFL)	Noida	100 KW	Proposed 9	NTPC Ltd.	Noida	180KW	Proposed 10	NTPC Ltd.	Dadri, UP	5 MW	Commissioned project 11	NTPC Ltd.	Port Blair, A&N	5 MW	Commissioned project 12	NTPC Ltd.	Ramagundam,	10 MW	Commissioned project	Telangana 13	NTPC Ltd.	Unchahar, UP	10 MW	Commissioned project 14	NTPC Ltd.	Talcher, Odisha	10 MW	Commissioned project 15	NTPC Ltd.	Rajgarh, MP	50 MW	Commissioned project 16	NTPC Ltd.	Faridabad,	5 MW	Commissioned project	Haryana 17	NTPC Ltd.	Singrauli,	15 MW	Under Construction 18	Neyvelli Lignite Corporation	Chennai	150 MW	Proposed	Ltd. (NLC) 19	NLC	Rajasthan	10 MW	Feasibility report	under preparation 20	NLC	Neyveli	10 MW	Under erection 21	Mahanadi Coalfield Ltd. (MCL)	Odisha	2 MW	Work order issued 22	Central Mine Planning &	Ranchi	250 KW	Proposed	Design Inst. Ltd.(CMPDL) with	Gujarat Energy Research	Management Institute 23	Coal India Ltd.	Kolkata	140 KW	Completed 24	Rajasthan Electronics &	Jaipur	25 KW	Commissioned	Instruments Ltd. (REIL) 25	Engineers India Ltd. (EIL)	Gurgaon	90 KW	Commissioned 26	EIL	Delhi	3 KW	Commissioned 27	EIL	Delhi	1.2 KW	Commissioned 28	EIL	Chennai	35 KW	Under Commissioning 29	Bharat Heavy Electrical	Ranipet	5 MW	Commissioned	Ltd. (BHEL) 30	BHEL	Ranipet	17.5 KW	Commissioned 31	BHEL	Bhopal	250 KW	Commissioned 32	BHEL	Hyderabad	250 KW	Commissioned 33	BHEL	Hyderabad	13.7 KW	Commissioned 34	BHEL	Hyderabad	13.5 KW	Commissioned 35	BHEL	Bangalore	42 KW	Commissioned 36	BHEL	Trichy	20 KW	Commissioned 37	Chennai Petroleum	Manali	11 KW	Commissioned	Corporation Ltd. (CPCL) 38	CPCL	Tamil Nadu	15 MW	Proposed to be	set up in 2014-15 39	Steel Authority of India	Bhilai	370 KW	Being Set-up	Ltd. (SAIL) 40	SAIL	Rourkela	1 MW	Being Set-up 41	Bharat Petroleum	Kerala	25 KW	Commissioned	Corporation Ltd. (BPCL) 42	BPCL	MMBPL	157 KW	Commissioned 43	BPCL	Not finalised	5 MW	Proposed 44	Oil India Ltd. (OIL)	Assam	100 KW	Commissioned 45	OIL	Rajasthan	100 KW	Commissioned 46	OIL	Rajasthan	5 MW	Commissioned 