THE MINISTER OF STATE IN THE MINISTRY OF WATER RESOURCES, RIVER DEVELOPMENT AND GANGA REJUVENATION (DR. SANJEEV KUMAR BALYAN)
(a) & (b) Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) was launched during the year 2015-16, with an aim to enhance physical access of water on farm and expand cultivable area under assured irrigation, improve on farm water use efficiency, introduce sustainable water conservation practices, etc. It comprises of various components as Accelerated Irrigation Benefits Programme (AIBP), Har Khet Ko Pani (HKKP), Per Drop More Crop and Watershed Development.
The achievement under PMKSY during 2015-16 are as under:
Components
Potential achieved/CCA covered(Lakh Ha.)
Accelerated Irrigation Benefits Programme(AIBP) 2.47
Har Khet Ko Pani (HKKP)
RRR,SMI & GW
1.207
CADWM 5.715
Per Drop More Crop 5.73
Watershed Development 2.47
(c) Central Water Commission (CWC) monitors the live storage status of 91 reservoirs in the country on weekly basis. As per the reservoir storage bulletin dated 16.03.2017, the combined live storage available in these reservoirs is 58.03 BCM, which is almost equal to average storage of last ten year during the corresponding period. However, storage during current year is about 45% less than the average storage of last ten years in southern region (Andhra Pradesh, Telangana, Karnataka, kerala and Tamilnadu)
(d) Under PMKSY-AIBP, Ninety Nine (99) ongoing Major/Medium Irrigation Projects (including two projects of Rajasthan and one project of Jharkhand) along with their Command Area Development & Water Management (CADWM) works having potential of 76.03 lakh ha., have been identified in consultation with states, for completion in phases by Dec, 2019. Details of these 99 projects are at Annexure.
*********
Annexure
Annexure as refered in the part (d) of the Lok Sabha Unstarred Qu. No. 3565 due for reply on 23.03.2017
Details of 99 Priority projects
Sl. No. Project Name Balance cost*
(Rs. In crore)
as on 01.04.16 Targeted Irrigation Potential (Th. Ha.)
Andhra Pradesh
1 Gundlakamma 87.5 32.4
2 Tadipudi LIS 91.22 83.61
3 Thotapally 152.47 48.56
4 Tarakaram Teerta sagaram 285.69 10
5 Musurumilli 33.86 9.16
6 Pushkara LIS 84.79 71.18
7 Yerracalva 27.54 6.96
8 Maddigedda (Completed) 1.96 1.42
Assam
9 Dhansiri 152.09 86.37
10 Champamati 122.61 25
11 Borolia 72.64 13.56
Bihar
12 Durgawati 46.76 23.59
13 Punpun 269.32 13.68
Chhattisgarh
14 Maniyari Tank 96.04 14.52
15 Kelo 187.49 22.81
16 Kharung 241.08 10.3
Goa
17 Tillari 8.69 14.52
Gujarat
18 Sardar Sarovar 1385.11 1792
Jammu & Kashmir
19 Tral Lift 70.81 6
20 Prakachik Khows Canal 18.1 2.26
21 Restoration & Mod. of Main Ravi Canal 27.16 50.75
22 Rajpora Lift 0.91 2.43
Jharkhand
23 Subernarekha Multipurpose 2478.74 236.85
Karnataka
24 Upper Tunga Irrigation Project 539.64 80.49
25 Sri Rameswar Irrigation 86.54 13.8
26 Karanja 64.51 29.23
27 Bhima LIS 173.12 24.29
28 NLBC System Project (New) 1350.84 105
Kerala
29 Karapuzha 55.96 7.36
30 Muvattupuzha 12.56 30.72
Madhya Pradesh
31 Sindh Project Phase II 331.12 162.1
32 Indira Sagar Project Canal Phase - I & II (km. 0 to km. 142) 91.53 62.2
Indira Sagar Project Canal Phase - III
(km. 143 to km. 206) 306.49 20.7
Omkareshwar Project Canal Phase-IV (OSP lift) 367.41 54.63
Bargi Diversion Project Phase - I
(km. 16 to km 63) 31.94 21.19
33 Mahi Project 360.87 33.75
34 Barriyarpur LBC 271.3 43.85
35 Bansagar Unit 2 2247.23 154.54
36 Mahan Project 122.82 19.74
37 Pench Project 1500.34 28.27
38 Sagad Project 142.64 17.06
39 Singhpur Project 111.18 10.2
40 Sanjay sagar (Bah) Project 178.6 17.81
41 Mahuar Project 70.93 13.78
42 Indira Sagar Project Canal Phase - IV
(km. 206 to km. 243) 362.77 19.6
Indira Sagar Project Canal Phase - V
(Khargone Lift ) 286.44 33.14
Omkareshwar Project Canal Phase-II (RBC km. 9.70 to km 65.50) 126.86 19.58
43 Omkareshwar Project Canal Phase-III (RBC km. 65.50 to km 142) 68.25 48.59
Bargi Diversion Project Phase - II
(km. 63 to km 104) 36.06 31.9
44 Bargi Diversion Project Phase - III
(km. 104 to km 154) 1060.17 26
Bargi Diversion Project Phase - IV
(km. 154 to km 197) 429.77 34
Maharashtra
45 Waghur 494.06 38.57
46 Bawanthadi (IS) 130.71 27.71
47 Lower Dudhna 521.92 44.48
48 Tillari 311.46 6.57
49 Lower Wardha 590.84 63.33
50 Lower Panzara 131.6 6.79
51 Nandur Madhmeshwar Ph-II 360.43 20.5
52 Gosikhurd (NP) 5606.88 250.8
53 Upper Pen Ganga 743.89 44.47
54 Bembla 1656.23 52.54
55
Tarali 366.34 14.28
56 Dhom Balaakwadi 348.35 18.1
57 Arjuna 277.37 5.7
58 Upper Kundalika 106.02 2.8
59 Aruna 209.19 9.03
60 Krishna Koyana Lift 1643.89 104.17
61 Gadnadi 267.39 3.47
62 Dongargaon 2.59 2.77
63 Sangola Branch Canal 642.63 11.29
64 Khadakpurna 269.08 23.86
65 Warna 831.33 54.75
66 Morna (Gureghar) 109.09 3.08
67 Lower Pedhi 544.51 17.02
68 Wang project 100.4 7.07
69 Naradave (Mahammadwadi) 85.92 12.28
70 Kudali 251.44 5.33
Manipur
71 Thoubal 332.55 29.45
72 Dolaithabi Barrage 153.05 7.54
Odisha
73 Lower Indra(KBK) 0.84 35.87
74 Upper Indravati(KBK) 47.06 85.95
75 Rukura-Tribal 133.57 7.65
76 Subernarekha 1121.88 119.26
77 Anandpur Barr. Ph.-I / Integrated Anandpur Barr. 1197.04 8.88
78 RET irrigation 206.56 8.5
79 Kanupur 611.87 47.74
80 Telengiri 133.77 13.83
Punjab
81 Kandi Canal Extension (Ph.II) 176.27 23.33
82 Rehabilitation of Ist Patiala Feeder and Kotla Branch Project 57.06 68.62
Rajasthan
83 Narmada Canal 356.15 245.88
84 Mod. of Gang Canal 41.8 69.69
Telangana
85 J. Chokha Rao LIS 2193.91 249
86 SriKomaram Bheem project 115.78 9.92
87 Gollavagu Project 24.2 3.85
88 Rallivagu project 14.08 2.43
89 Mathadivagu Project 10.83 3.44
90 Peddavagu @ Neelwai project 28.7 6.07
91 Palemvagu project 3.99 4.1
92 Peddavagu @ Jagannathpur 146.47 6.07
93 SRSP St.II 418.13 178.07
94 Rajiv Bheema L.I. Scheme 287.97 82.15
95 Indiramma Flood Flow Canal 2081.67 40
Uttar Pradesh
96 Bansagar Canal 197.9 150.13
97 Arjun sahayak 730.42 44.38
98 Madhya Ganga canal PH-II 1607.47 146.53
99 Saryu Nahar(NP) 2781.42 1312
* The information is as intimated by States.