THE MINISTER OF STATE IN THE MINISTRY OF WATER RESOURCES
(SMT. BIJOYA CHAKRAVARTY)
(a) to (d) Around 3600 large dams have been constructed
in the country for various purposes. However, the number of
major irrigation projects (Culturable Command Area more than
10,000 Hectares ) completed in the country upto the end of
VIII Plan is 200 of which 74 projects were completed in pre-
plan era and remaining 126 projects during the plan period.
The statewise number of projects completed during pre-
plan/plan period alongwith the expenditure incurred and
potential created through them is given in Statement-I.
The number of major Hydro Electric Stations presently
existing in the country is 25. The installed generation
capacity of these stations is given in Statement II.
The data regarding quantum of water provided through
these projects for drinking purposes is not maintained in
the Ministry of Water Resources.
STATEMENT-I REFERRED TO IN REPLY TO PART (a) to (d) OF
UNSTARRED QUESTION NO.1675 FOR ANSWER IN LOK SABHA ON 29-11-
2000 REGARDING MULTIPURPOSE DAMS
NO. OF COMPLETED MAJOR IRRIGATION PROJECTS DURING PRE-PLAN
AND PLAN PERIOD (upto the end of VIII Plan)
Pre Plan period Plan period
Sl. Name of No. of Cost Potential No. of Cost Potential
No. the State Projects (Rs. created project (Rs. in created
completed in crores) (In th.ha.) completd crores) (In th.ha.)
1. Andhra 11 24.52 1253 5 56.70 307
Pradesh
2. Arunachal - - - - - -
Pradesh
3. Assam - - - 2 9.46 47
4. Bihar 2 3.5 395 17 682.22 1610
5. Goa - - - - - -
6. Gujarat 2 7.22 21 10 335.78 701
7 Haryana 1 5.77 436 4 107.38 804
8. Himachal - - - - - -
Pradesh
9. J & K 1 0.49 46 - - -
10. Karnataka 4 2.95 178 3 156.91 283
11. Kerala - - - 7 313.00 303
12. Madhya 6 21.79 300 7 294.33 690
Pradesh
13. Maharashtr 5 10.87 156 17 997.00 694
14. Manipur - - - 1 28.79 38
15. Meghalaya - - - - - -
16. Mizoram - - - - - -
17. Nagaland - - - - - -
18. Orissa 3 N.A 167 6 273.09 387
19. Punjab 3 13.3 1251 4 264.92 424
20. Rajasthan 1 3.32 185 2 502.28 1053
21. Sikkim - - - - -
22. Tamil Nadu 17 12.29 1097 5 65.13 266
23. Tripura - - - - - -
24. Uttar 15 34.70 2553 35 589.34 2255
Pradesh
25. West 3 2.35 138 1 24.60 251
Bengal
TOTAL 74 143.07 8176 126 4700.93 10113
Note: Cost of two projects not available
STATEMENT-II REFERRED TO IN REPLY TO PART (a) to (d) OF
UNSTARRED QUESTION NO. 1675 FOR ANSWER IN LOK SABHA ON 29-11-
2000 REGARDING MULTIPURPOSE DAMS
DETAILS OF MAJOR HYDRO ELECTRIC (H.E.) +STATIONS
S.No. Name of H.E. Station Installed Capacity
(MW)
1. Bhakra (BBMB) 1200
2. Pong (â) 360
3. Ranjit Sagar 600
4. R.P. Sagar 172
5. Rihand 300
6. Ramganga 198
7 Ukai 300
8. Gandhi Sagar 115
9. Koyana 1880
10. Machkud 114.75
11. Nagarjuna Sagar 810
12. Srisailam 770
13. Sharavathy 894
14. Supa 810
15. Idukki 780
16. Sabrigiri 300
17. Madhupatty 130.50
18. Idamalyar 75
19. Mettur 240
20. Periyar 140
21. Hirakud 307.50
22. Balimela 360
23. Rengali 250
24. Indravati 450
25. Loktak 105