THE MINISTER OF STATE IN THE MINISTRY OF POWER ( SHRIMATI JAYAWANTI MEHTA )
(a) to (c) : The last tariff Order was issued by Delhi Electricity Regulatory
Commission (DERC) on 23rd May, 2001 and was made effective from 1st June, 2001 and
is still effective. The tariff schedule contained in this tariff order is at Annexure-I
(d) : The detail tariff of both domestic and industrial consumers in different
States is at Annexure-II.
ANNEXURE-I
ANNEXURE REFERRED TO IN REPLY TO PARTS (a) & (c) OF THE
UNSTARRED QUESTION NO. 2732 TO BE ANSWERED IN LOK SABHA ON
5.12.2002.
Tariff for the year 2001-2002
1. Domestic Category Minimum Demand Energy Normative Charges Charges (Paise/kWh) (Rs./kW/ (Rs./kVA/ Limit Charges Month) Month) (kWh/ (%) month)
1.1 Domestic 60 - Lifeline 125 Light/Fan and Power (Single (upto 50 Delivery Point) units) Units/ Energy month Charges
0-100 150 101-200 210 201-400 300 Above 360 400
1.2 Domestic Lighting/Fan and Power on Separate Delivery Points/Meters
(a) Lighting/Fan 60 - Same as in 1.1 - -
(b) Power 60 - 360 - -
1.3 Domestic Rs.150/kVA consumption Energy Lighting/Fan A or part - on/month Charges3 and Power on thereof per 11kV single month on First 22.2% 150 delivery maximum Next 22.2% 210 - - point for CGHS demand Next 44.4% 300 and other Next 11.2% 360 similar Group housing complexes
1.4 Domestic Lighting/Fan and Power connections in regularised/ unauthorised - - Rs.150 per month - - colonies. Left - - Rs.255 per month - - outpockets & - - Rs.360 per month - - villages both - - Rs.510 per month - - electrified - - Same as 1.1 - - and unelectrified plot sizes: i) up to 50 Sq.yds.
ii) between 51-100 Sq.yds
iii) between 101-150 Sq.yds
iv) between 151-200 Sq.yds
v) more than 200 Sq.yds only through installation of meters by DVB
As per As per As As
1.5 Misuse category category 600 per per of misuse of misuse category category of misuse of misuse
2. Non 2.1 Non-Domestic -
Domestic (Low Tension)4 - NDLT-I
a) single phase(10kW)
2.1.1 Non-Domestic Rs.200/kV - 5005 with a rebate of 15% - - Light/Power on A or part 11kV Single thereof/ Delivery Point month on
or commercial billing
complexes demand NDLT-II
2.1.2 Misuse as As per As per 600 As As industrial category of category of per per
misuse misuse category category of misuse of misuse
2.2 Mixed Load
(High Tension)MLHT6,7
a) supply on 11kV - 150 390 Paise/kVAh - -
b) supply on LT - 200 465 Paise/kVAh8 - - (400 volts)
2.2.1 Misuse - As in 2.2 510 Paise/kVAh - - as industrial
3.Industrial
3.1 Small industrial Power - SIP9
a) Non 200 - 410 300 30 continuous industry
b) Continuous 200 - 410 400 30 industry
3.1.1 Misuse10 a) in non- 300 As per 600 300 30 continuous Category industry of misuse
b) in continuous 300 600 400 30 industry
3.1.2 Industrial Rs.200/kV Power (SIP) A or part on 11kV Single thereof per - Same as 3.1 above11 with Delivery Point month on rebate of 15% - - for Group of billing SIP Consumer demand
As per As per As per
3.1.2.1 Misuse 350 category of 600 category of category of misuse misuse
3.2 Large industrial - 150 340 Paise/kVAh13 - - Power LIP12 - 200 425Paise/kVAh - -
a) Supply on 11kV
b) Supply on LT (400 Volts)
Minimum 3.2.1 Induction/Arc consumption furnaces guarantee As in 3.2 As in 3.2 - - charges14
3.2.2 Misuse - As in 3.2 510 Paise/kVAh - -
4. Agriculture - - 75 - -
4.1 Mushroom cultivation 100 - 200 - -
As per As per As per
4.2 Misuse As per category 600 category category
category of of misues of misuse misuse misuse
5. Public Lighting Maintenance
charges @ - 360 - -
Rs.60/
month/
street
lighting
point
6. Railway Traction15 Capacity As in 3.217 As in 3.2 - -
blockage-
fixed
charges16
7. Licensees (NDMC/MES) - - 270 Paise/kVAh - -
8. Temporary Supply
8.1 for a total 50% of the Same as High by 50% Same as same as period of relevant that of (temporary surcharge) that of that of (a) less than category relevant of the relevant cate- relevant relevant 16 days Same as that of category gory of tariff category category (b) more than relevant category or equal 16 days
8.2 for residential same as - Domestic tariff with- - cooperative group that of out any surcharge from housing connections relevant the date of payment category of their payable shae in full towards electrification cost. Normal tariff avia- lable after one year from release of electrifi- cation scheme.
8.3 for religious functions Same as 1.1 - Same as 1.1 without - of traditional and temporary surcharge established characters and cultual activities
8.4 for major construction Same as that Same as that Same as that of relevant 300 30 projects of relevant of relevant category with temporary category category surcharge
8.5 for threshers
(a) during the thresing Electricity - Flat rate of Rs.3000 - seasons for 30 days tax of MCD;Rs.1 - On pro-rata basis for each 50 per week or part thereof connection
(b) for extended period
1. Minimum charges are to be levied on per kW or part
thereof sanctioned/connected/declared connected load,
whichever is higher.
2. The entitlement of various slabs under domestic
category shall be worked out on pro-rata basis depending
upon the duration billing cycle.
3. With a rebate of 15%.
4. Connection sanctioned for dispensaries, Hospitals,
Public Libraries, Schools Run/Aided by MCD/Government of NCT
of Delhi other schools as recommended by Department of
Education, Govt. of NCT of Delhi, Places of worship,
Shelters for animals including Go-sadans, Chaupals,
community halls in Rural Areas and J.J. Bastles/Conlonies.
Recognised Centres for welfare of Blind, Deaf and Dumb,
Spastic Children and Physically Handicapped Persons. Working
Women Hostels run/aided by MCD/Govt., Cheshire
Homes/Orphanages Charitable homes and Small Health Centres
approved by Directorate of Health Services, Govt. of NCT of
Delhi for providing Charitable Services only, electric
crematoriums or any other similar establishment as may be
approved by the Board/licensee shall be billed at domestic
category tariff if such premises are being used exclusively
for the specified purposes.
5. Where the MDI reading exceeds contract demand by more
than 5% a surcharge of 30% shall be levied on the total
demand plus energy charges for such billing cycle.
6. Same as 4 above.
7. Where the MDI reading exceeds contract demand by more
than 5%, a surcharge of 30% shall be levied on the total
demand plus energy charges for such billing cycle.
8. The incumbent shall be entitled for a rebate of 2.5% on
the energy charges on 11kV rates for availing 3 phase supply
on 33/66kV and 4% for supply on 220 kV.
9. For industrial consumers having valid MCD licence/Lal
Dora Certificate in case of Rural Villages.
10. Industrial activity without municipal licence including
that in urbanised villages, non-conforming areas.
11. Same as 5 above.
12. Same as 7 above.
13. Same as 8 above.
14. Comprising of demand charges plus consumption charges
of 360 kVAh per kVA or part thereof per month of the billing
demand. Constant `K` shall be applicable as in the case of
Normative Consumption, for the purpose of calculating
minimum consumption guarantee charges.
(i) : The MCG shall
not be chargeable for the period of recorded load shedding
from grid substations duly certified by District Executive
Engineer with reason(s) and recorded breakdowns for the
period exceeding 12 hours in a billing cycle.
(ii) The Demand Charges will, however, be chargeable for
this period as in
(i) above.
15. The above tariff is based on the supply being given
through a single delivery and metering point at single
voltage.
16. Rs.1260x(2.97A+5) where `A` is contract/maximum demand,
whichever is higher, in MVA subject to a minimum of
Rs.25000.
17. The simultaneous maximum demand, for all metering
points, shall be considered for levying demand violation
charges.
ANNEXURE-II
ANNEXURE REFERRED TO IN REPLY TO PARTS (d) & (e) OF THE
UNSTARRED QUESTION NO. 2732 TO BE ANSWERED IN LOK SABHA ON
5.12.2002 REGARDING REVISED TARIFF IN DERC.
Consumer Category-wise Average Tariff, 2001-02 (Annual Plan)
(Paise per Kwh)
States Domestic Commercial Agriculture/ Industrial
_______________________________________________________ Irrigation_______________
1. Andhra Pradesh 174.00 426.00 15.00 439.45
2. Assam 186.76 468.66 272.41 429.66
3. Bihar 109.50 276.60 13.37 362.26
4. Delhi(DVB) 149.86 415.81 50.00 424.80
5. Gujarat 243.00 448.00 39.00 439.57
6. Haryana 259.33 411.73 37.02 428.00
7 Himachal Pradesh 104.00 261.00 50.00 265.00
8. Jammu & Kashmir 85.00 160.00 220.00 135.00
9. Karnataka 198.00 572.12 30.51 409.93
10. Kerala 81.02 436.40 67.21 225.18
11. Madhya Pradesh 159.58 430.64 7.20 437.77
12. Maharashtra 248.02 456.39 82.28 419.93
13. Meghalaya 135.53 192.23 51.72 208.26
14. Orissa (GRIDCO) 175.72 369.74 107.73 322.98
15. Punjab 211.46 368.56 0.00 300.26
16. Rajasthan(Transco) 190.87 429.76 46.26 392.88
17. Tamil Nadu 169.26 401.70 1.31 379.60
18. UP(Power corp.) 185.17 431.50 107.83 464.44
19. West Bengal 148.88 237.28 57.87 320.01
Average :SEBs 184.16 406.65 35.38 368.37
II EDs
1. Arunachal Pradesh 300.00 300.00 0.00 300.00
2. Goa 134.41 390.48 112.84 379.76
3. Manipur 181.90 250.00 171.00 198.50
4. Mizoram 129.00 199.00 0.00 245.00
5. Nagaland 160.00 280.00 0.00 225.00
6. Pondicherry 94.95 235.82 7.51 205.54
7 Sikkim 97.00 152.00 0.00 135.00
8. Tripura 92.00 120.00 68.00 118.00
Average of EDs 119.09 254.45 41.69 266.74
All India Average 183.13 404.21 35.40 366.50
Source: Planning Commission Document