(a) whether as per Telangana Act 12th schedule new linkages will be allotted as per new coal distribution policy;
(b) if so, the details thereof, State/UT- wise along with the present status thereof; and
(c) if not, the reasons therefor?
(a) whether as per Telangana Act 12th schedule new linkages will be allotted as per new coal distribution policy;
(b) if so, the details thereof, State/UT- wise along with the present status thereof; and
(c) if not, the reasons therefor?
MINISTER OF PARLIAMENTARY AFFAIRS, COAL AND MINES
(SHRI PRALHAD JOSHI)
(a)to(c): New coal linkages have been allotted to the thermal power plants of Telangana State Power Generation Corporation (TSGENCO). The details of coal linkages allotted to TSGENCO from Singareni Collieries Company Limited (SCCL) are given below:
Thermal Power Plant Capacity (in MW)
KTPS-VII 800
Bhadradri 1080
Yadadri 4000
The details of Bridge Linkage granted to the Thermal Power Plants of Telangana States are given below:
Thermal Power Plants Capacity (in MW)
Singareni Thermal power plant of SCCL 1200
Kakatiya TPP, Stage-II of Telangana State Power Generation Corporation Limited (TSPGCL) 600
As per the statutory requirements of A(3) of the Twelfth Schedule of the Andhra Pradesh Reorganization Act, 2014 and on the basis of recommendation of the Ministry of Power, ''in principle'' approval for grant of tapering linkage to 2x800 MW Phase-I of Telangana Super Thermal Power Project of NTPC has been accorded.
The details of coal linkages allotted to Andhra Pradesh Power Generation Corporation APGENCO from Coal India Limited (CIL) are given below:
Thermal Power Plants Capacity(in MW)
Rayalseema U-6 100
NTTPS St-V 800
Sri Damodaran Sanjeevaiah St-II 800
*****