Question : AMOUNT RELEASED TO BIHAR UNDER CRF



(a) the details of projects including the names of the roads and their length in Bihar for which amount under the Central Road Fund (CRF) had been released during the last three years; and

(b) the details of roads (with length) sanctioned or under consideration of the CRF in Bihar during 2004-2005 and 2005-06 and the fund allocated ?

Answer given by the minister

THE MINISTER OF STATE IN THE MINISTRY OF SHIPPING, ROAD TRANSPORT AND HIGHWAYS (SHRI K.H. MUNIYAPPA)

(a) Details of the projects approved under Central Road Fund (CRF) in Bihar during the last three years is Annexed. An amount of Rs.51.60 Crores has been released under CRF for Bihar during the last three years.

(b) As the sanction limit exhausted, no projects were sanctioned or are under consideration under Central Road Fund (CRF) in Bihar during 2004-05 and 2005-06. A sum of Rs. 14.71 Crores and Rs.12.90 Crores has been released during 2004-05 and 2005-06 respectively.

ANNEXURE

ANNEXURE REFERRED TO IN REPLY TO PART (a) OF THE LOK SABHA UNSTARRED QUESTION NO.5823 FOR ANSWER ON 04.05.2005 ASKED BY SHRI RAM KRIPAL YADAV, SHRI SRICHAND KRIPLANI, SHRI VARKALA RADHAKRISHNAN, SHRIMATI NEETA PATERIYA REGARDING AMOUNT RELEASED TO BIHAR UNDER CRF.

Details of 17 works approved under CRF for Bihar during the last three years:

(Rs in Crores)
Sl.No. Name of work Sanctioned Cost
1. Widening & strengthening of Bhabhua-Chainpur-Chand-Dharauli 8.30 road from km 0 to 32.4 (length 32.4 km)
2. Construction of 3x24.75 span RCC HL bridge across river Riga 3.62 at Julekhaghat in 1 st km of Kadwa-Kurumhat road via Bharry-Ashianai Chowki in Katihar district (length 76 m)
3. Strengthening & reconstruction of Jogbani-Bathnaha road from 1km 3.00 to 7th km (length 6.5 km)
4. Strengthening of existing road crust in km 1 to 18.9 of 3.67 Parwara-Lalbandi road (length 18.9 km)
5. Strengthening of Madhepur-Bheja road from 0 to 9 (length 9 km) 2.70
6. Widening & strengthening road Karanpur to Rajampur from 3.92 km 0 to 11 (length 11 km)
7. Construction of approach road both side of 16 km HL bridge 1.45 with protection in Katihar-Pranpur road (NH-81) in Katihar district (520 m)
8. Approach road of HL bridge at Maksudpur across river old 3.64 Bagmati in 16th km of Muzaffarpur-Sitamarhi (NH-77) road in the district of Muzaffarpur (length 1.429 km)
9. Residual work of construction of HL bridge Kataunjha 11.42 over river Bagmati in 30th km of Muzzafarpur-Sitamarhi Section of NH-77
10. Remaining work of Hl bridge with approach road at 14.47 Dubhaghat across river Bagmati river in 20th km of Sitamarhi-Sheohar road (NH-104) in Sitamarhi district (2 km length)
11. Construction of remaining works of Hl bridge lava 10.67 (2x47.319 = 10x48.468 m) across river Mahnanda at Lava with approach road in Katihar-Pranpur-Lava-Dilli-Diwanganj road (NH-81) in Katihar district (length 579.318 km)
12. Construction of remaining work of HL bridge in 18 km at 5.05 Mainanagar with approach road with protection in Katihar -Pranpur-Lava-Dilli Diwanganj road (NH-81) in Katihar district (length 76.07 km)
13. Construction of approaches on both sides of bridges in km 14 & 15 3.97 of NH-81 (length 1.03 km)
14. Strengthening of existing road crust in km 1 to 7 of 2.50 Mahthaur-Chakka-Dhamsain-Alinagar-Jamalpur road in Darbhanga district (length 07 km)
15. Widening & strengthening of Ara-Bihiya-Chaurasta road via 3.25 Salempur-Parja-Karja in Bhojpur district (length 16 km)
16. Improvement of road from Marhoura to Sonho via Amnour 4.65 in Saran district.
17 Construction of bridge at Baisaghat in kishanganj 9.80
Total = Rs.96.08