THE MINISTER OF POWER ( SHRI P.M. SAYEED )
(a) & (b) : A plan has been chalked out for development of a National Power Grid
through integration of all the regional transmission systems in the country. The present
inter-regional transmission capacity in the country is 9,500 MW which is likely to
increase to over 30,000 MW by 2012. A list of the existing inter-regional transmission
lines and those under construction/planned for completion by 2012 is at Annex.
(c) & (d) : An investment of around Rs. 70,000 crore has been envisaged in the
Central sector in 10th and 11th Plans on intra-regional and inter-regional transmission
lines for development of the National Power Grid. The required funds will be mobilized
through internal resources of PGCIL, domestic loans and external commercial
borrowings by PGCIL, budgetary support to PGCIL and investment from private sector.
(e) : Integration of regional grids is a continuing process. In addition to the inter-
regional transmission lines which have been planned for completion upto 2012, more
inter-regional and intra-regional links may be required depending upon the generation
addition and power flow requirement.
ANNEX.
ANNEX REFERRED TO IN REPLY TO PARTS (a) & (b) OF UNSTARRED
QUESTION NO. 834 TO BE ANSWERED IN THE LOK SABHA ON
04.03.2005.
EXISTING/PROPOSED INTER-REGIONAL TRANSMISSION CAPACITY (MW)
Existing By 2011-12 Total
EAST-NORTH
Dehri-Sahupuri 220 kV S/c 150 150
Sasaram HVDC back-to-back 500 500
Muzaffarpur-Gorakhpur 400 kV D/c 2000 2000
Patna - Balia 400kV D/c 2000 2000
Biharshariff - Balia 400kV D/c 2000 2000
Barh - Balia 400kV D/c 2000 2000
North Karanpura - Balia 765kV S/c 2250 2250
132 KV inter-regional capacity- Rihand -
Sonenagar 132kV D/c 50 50
Sub-total 700 10250 10950
EAST-WEST
Budhipadar-Korba 220 kV 3 ckts. 450 450
Rourkela-Raipur 400 kV D/c 1400 1400
Rourkela-Raipur 400 kV D/c (2nd) 1400 1400
Ranchi -Sipat 400 kV D/c 1400 1400
N`Karanpura - WR Pooling point 765kV S/c 2250 2250
Sub-total 1850 5050 6900
WEST- NORTH
Vindhyachal HVDC back-to-back 500 500
Auriya-Malanpur 220 KV D/c 200 200
Gwalier-Agra 765 kV S/c 1000 1000
Zerda-Kankroli 400 KV D/c 1000 1000
RAPP-Nagda 400 KV D/c 1000 1000
Gwalior-Agra 765 kV 2nd S/c 1000 1000
Ujjain - Kota 220 KV D/c 200 200
Sub-total 900 4000 4900
EAST- SOUTH
Gazuwaka HVDC back-to-back 500 500
Balimela-Upper Sileru 220kV S/c 150 150
Talcher-Kolar HVDC bipole 2000 2000
Augmentation of Gazuwaka HVDC
Back to Back 500 500
Upgradation of Talcher-Kolar HVDC Bipole 500 500
Sub-total 3150 500 3650
WEST- SOUTH
Chandrapur HVDC back-to-back 1000 1000
Kolhapur-Belgaum 220kV D/c 200 200
Barsur - L. Sileru 220kV HVDC Monopole 200 200
Ponda - Nagajhari 220kV D/c 200 200
Sub-total 1600 1600
EAST- NORTH EAST
Bongaigaon-Siliguri 400 kV D/c 1000 1000
Birpara-Salakati 220kV D/c 300 300
Transmission lines for New Projects in
North Eastern Region 700 700
Sub-total 1300 700 2000
TOTAL 9,500 =20,500 = 30,000