Question : POWER GRID



(a) whether the Government propose to formulate a scheme to inter-link all the power grids with one another in the country;

(b) if so, the details thereof;

(c) the estimated expenditure likely to be incurred thereon;

(d) the sources of funds proposed to be mobilized; and

(e) the time by which the scheme is likely to be implemented?

Answer given by the minister

THE MINISTER OF POWER ( SHRI P.M. SAYEED )

(a) & (b) : A plan has been chalked out for development of a National Power Grid through integration of all the regional transmission systems in the country. The present inter-regional transmission capacity in the country is 9,500 MW which is likely to increase to over 30,000 MW by 2012. A list of the existing inter-regional transmission lines and those under construction/planned for completion by 2012 is at Annex.

(c) & (d) : An investment of around Rs. 70,000 crore has been envisaged in the Central sector in 10th and 11th Plans on intra-regional and inter-regional transmission lines for development of the National Power Grid. The required funds will be mobilized through internal resources of PGCIL, domestic loans and external commercial borrowings by PGCIL, budgetary support to PGCIL and investment from private sector.

(e) : Integration of regional grids is a continuing process. In addition to the inter- regional transmission lines which have been planned for completion upto 2012, more inter-regional and intra-regional links may be required depending upon the generation addition and power flow requirement.

ANNEX.
ANNEX REFERRED TO IN REPLY TO PARTS (a) & (b) OF UNSTARRED QUESTION NO. 834 TO BE ANSWERED IN THE LOK SABHA ON 04.03.2005.

EXISTING/PROPOSED INTER-REGIONAL TRANSMISSION CAPACITY (MW)

Existing	By 2011-12	Total
EAST-NORTH Dehri-Sahupuri 220 kV S/c 150 150 Sasaram HVDC back-to-back 500 500 Muzaffarpur-Gorakhpur 400 kV D/c 2000 2000 Patna - Balia 400kV D/c 2000 2000 Biharshariff - Balia 400kV D/c 2000 2000 Barh - Balia 400kV D/c 2000 2000 North Karanpura - Balia 765kV S/c 2250 2250 132 KV inter-regional capacity- Rihand - Sonenagar 132kV D/c 50 50 Sub-total 700 10250 10950 EAST-WEST Budhipadar-Korba 220 kV 3 ckts. 450 450 Rourkela-Raipur 400 kV D/c 1400 1400 Rourkela-Raipur 400 kV D/c (2nd) 1400 1400 Ranchi -Sipat 400 kV D/c 1400 1400 N`Karanpura - WR Pooling point 765kV S/c 2250 2250 Sub-total 1850 5050 6900 WEST- NORTH Vindhyachal HVDC back-to-back 500 500 Auriya-Malanpur 220 KV D/c 200 200 Gwalier-Agra 765 kV S/c 1000 1000 Zerda-Kankroli 400 KV D/c 1000 1000 RAPP-Nagda 400 KV D/c 1000 1000 Gwalior-Agra 765 kV 2nd S/c 1000 1000 Ujjain - Kota 220 KV D/c 200 200 Sub-total 900 4000 4900

EAST- SOUTH Gazuwaka HVDC back-to-back 500 500 Balimela-Upper Sileru 220kV S/c 150 150 Talcher-Kolar HVDC bipole 2000 2000 Augmentation of Gazuwaka HVDC Back to Back 500 500 Upgradation of Talcher-Kolar HVDC Bipole 500 500 Sub-total 3150 500 3650 WEST- SOUTH Chandrapur HVDC back-to-back 1000 1000 Kolhapur-Belgaum 220kV D/c 200 200 Barsur - L. Sileru 220kV HVDC Monopole 200 200 Ponda - Nagajhari 220kV D/c 200 200 Sub-total 1600 1600 EAST- NORTH EAST Bongaigaon-Siliguri 400 kV D/c 1000 1000 Birpara-Salakati 220kV D/c 300 300 Transmission lines for New Projects in North Eastern Region 700 700 Sub-total 1300 700 2000 TOTAL 9,500 =20,500 = 30,000