(a) the total length of National Highways (NHs) constructed in the State of Odisha from 1st April 2020 till 31st March 2022 along with the expenditure incurred thereon;
(b) the projected target for construction of NHs during the said period and the reasons for slow progress along with cost escalation, if any;
(c) the length of NHs constructed in Keonjhar and Mayurbhanj districts of the State; and
(d) the State Highways that have been converted into NHs in the State?