Question : POWER TRANSMISSION CAPACITY



(a) the details of installed power transmission capacity in the country, State-wise;

(b) whether additional power transmission capacity is required to transmit the surplus power to deficit regions and to enable electricity trading;

(c) if so, the details thereof; and

(d) the current status of the proposal to establish an Integrated National Power Grid for facilitating inter-regional power transfer in the country?

Answer given by the minister


THE MINISTER OF STATE IN THE MINISTRY OF POWER ( SHRI K.C. VENUGOPAL )

(a) : The transmission system in the country consists of inter-state transmission system and intra-state transmission system. The inter-state transmission system is installed mainly under Central Sector. Some of the inter- state transmission has also been installed through private sector/joint venture (JV). The intra-state transmission system is developed under State Sector by the State Transmission Utility (STU) of each state. The details of transmission capacity under Central / State Sector for transmission lines and sub-stations, as on 31.07.2011, are given in Tables A-I and A-II respectively.

Table A-I: Capacity of Transmission Lines	(All fig. in ckm)
Voltage level Central Sector State Sector JV / Private Sector Total(All India) ±500 kV HVDC 5948 1504 1980 9432 765 kV 4638 409 0 5047 400 kV 72489 31649 6117 110255 220 kV 10485 125619 425 136529 Total 93560 159181 8522 261263
Table A-II: Capacity of Substations (All fig. in MVA / MW)
Voltage level Central Sector State Sector JV / Private Sector Total(All India) ±500 kV HVDC 9500 1700 0 11200 765 kV 4500 0 0 4500 400 kV 67840 66522 630 134992 220 kV 5856 202705 1440 210001 Total 87696 270927 2070 360693

(b) : For transfer of surplus power to deficit regions, an inter-regional transmission capacity of 23,750 MW is existing as on 31-07-2011. The margins in the inter-regional transmission capacity are also utilized for trading of electricity.

(c) : The details of inter-regional transmission capacity existing and planned for 11th Plan is at Annex.

(d) : At present, four out of five Regional Grids namely North, East, West and North-East are operating in synchronous mode and this is connected to Southern Region through various High Voltage Direct Currents (HVDC) links. Further, synchronous interconnection of Southern Grid with rest of the Grid is expected in 12th Plan.