THE MINISTER OF STATE IN THE MINISTRY OF WATER RESOURCES(SHRI VINCENT H. PALA)
(a) The schemes being implemented by the Ministry of Water
Resources for irrigation by surface water in the country are
Accelerated Irrigation Benefits Programme (AIBP), Command Area
Development & Water Management Programme (CAD&WM) and Repair,
Renovation and Restoration (RRR) of Water Bodies.
(b) & (c) Irrigation potential targeted during XI Plan is
16.00 lakh ha both by surface and ground water by the State
Governments.No special irrigation scheme other than those
mentioned above is proposed to be implemented by the Ministry of
Water Resources.Financial outlay for AIBP, CAD&WM and RRR of
Water Bodies for XI Plan is as under:
SI. Name of the Outlay in Rs. Crore in XI
No. Scheme Plan
1 AIBP 39850
2 CAD&WM 1600
3 RRR of water 2750 bodies
(d) & (e) In order to optimize irrigation from the existing
facilities of irrigation, Extension, Renovation and Modernization
(ERM) projects are provided the financial support under the AIBP.
The optimization of the utilization is achieved through various
measures implemented through CAD&WM programme of the Ministry.
Surface water minor irrigation schemes which could be completed
in a maximum of two yearsâ time are also provided financial
support under AIBP as per eligibility criteria prescribed in the AIBP guidelines.